| EP2177745 - STEEL PIPE FOR FUEL INJECTION PIPE, USE AND MANUFACTURING METHOD THEREOF [Right-click to bookmark this link] | |||
| Former [2010/16] | STEEL TUBE FOR FUEL INJECTION TUBE AND PROCESS FOR PRODUCING THE SAME | ||
| [2018/26] | Status | Opposition rejected Status updated on 14.07.2023 Database last updated on 20.03.2026 | |
| Former | The patent has been granted Status updated on 19.10.2018 | ||
| Former | Grant of patent is intended Status updated on 11.06.2018 | ||
| Former | Request for examination was made Status updated on 04.05.2018 | ||
| Former | Grant of patent is intended Status updated on 30.01.2018 | Most recent event Tooltip | 14.07.2023 | Opposition rejected | published on 16.08.2023 [2023/33] | Applicant(s) | For all designated states Usui Kokusai Sangyo Kaisha Limited 131-2 Nagasawa, Shimizu-cho Sunto-gun, Shizuoka 411-8610 / JP | For all designated states Nippon Steel Corporation 6-1, Marunouchi 2-chome Chiyoda-ku Tokyo 100-8071 / JP | [2019/25] |
| Former [2013/04] | For all designated states Usui Kokusai Sangyo Kaisha Limited 131-2 Nagasawa, Shimizu-cho Sunto-gun, Shizuoka 411-8610 / JP | ||
| For all designated states Nippon Steel & Sumitomo Metal Corporation 6-1, Marunouchi 2-chome Chiyoda-ku Tokyo 100-8071 / JP | |||
| Former [2010/16] | For all designated states Usui Kokusai Sangyo Kaisha Limited 131-2 Nagasawa, Shimizu-cho Sunto-gun, Shizuoka 411-8610 / JP | ||
| For all designated states Sumitomo Metal Industries, Ltd. 5-33, Kitahama 4-chome Chuo-ku Osaka-shi Osaka 541-0041 / JP | Inventor(s) | 01 /
USUI, Shoichiro c/o Usui Kokusai Sangyo Kaisha Ltd. 131-2 Nagasawa Shimizu-cho Sunto-gun Shizuoka 411-8610 / JP | 02 /
NAGAO, Katsunori c/o Sumitomo Metal Industries Ltd. 5-33 Kitahama 4-chome Chuo-ku Osaka-shi Osaka 541-0041 / JP | [2018/47] |
| Former [2010/16] | 01 /
USUI, Shoichiro c/o Usui Kokusai Sangyo Kaisha Ltd. 131-2 Nagasawa Shimizu-cho Sunto-gun Shizuoka 411-8610 / JP | ||
| 02 /
NAGAO, Katsunori c/o Sumitomo Metal Industries Ltd. 5-33 Kitahama 4-chome Chuo-ku Osaka-shi Osaka 541-0041 / JP | Representative(s) | Zimmermann & Partner Patentanwälte mbB Postfach 330 920 80069 München / DE | [2018/47] |
| Former [2010/16] | Zimmermann & Partner Isartorplatz 1 80331 München / DE | Application number, filing date | 08777707.4 | 30.06.2008 | [2010/16] | WO2008JP61856 | Priority number, date | JP20070180409 | 10.07.2007 Original published format: JP 2007180409 | [2010/16] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2009008281 | Date: | 15.01.2009 | Language: | JA | [2009/03] | Type: | A1 Application with search report | No.: | EP2177745 | Date: | 21.04.2010 | Language: | EN | [2010/16] | Type: | B1 Patent specification | No.: | EP2177745 | Date: | 21.11.2018 | Language: | EN | [2018/47] | Search report(s) | International search report - published on: | JP | 15.01.2009 | (Supplementary) European search report - dispatched on: | EP | 18.08.2014 | Classification | IPC: | F02M55/02, C21D6/00, F16L9/02, F16L9/19, C21D8/10, C21D9/08 | [2014/38] | CPC: |
F16L9/02 (EP,US);
C21D6/00 (EP,US);
C21D6/005 (EP,US);
C21D8/10 (EP,US);
C21D9/08 (EP,US);
C21D9/14 (EP,US);
C22C38/02 (EP,US);
C22C38/04 (EP,US);
F02M37/0017 (EP,US);
F02M55/02 (EP,US);
F02M61/166 (EP,US);
F02M61/168 (EP,US);
|
| Former IPC [2010/16] | F02M55/02, C21D6/00, F16L9/02, F16L9/19 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2018/47] |
| Former [2010/16] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | STAHLROHR FÜR KRAFTSTOFFEINSPRITZROHR, VERWENDUNG UND HERSTELLUNGSVERFAHREN DAFÜR | [2018/26] | English: | STEEL PIPE FOR FUEL INJECTION PIPE, USE AND MANUFACTURING METHOD THEREOF | [2018/26] | French: | TUYAU D'ACIER POUR INJECTION DE CARBURANT, SON UTILISATION ET PROCÉDÉ DE FABRICATION DE CELUI-CI | [2018/26] |
| Former [2010/16] | STAHLROHR FÜR KRAFTSTOFFEINSPRITZROHR UND HERSTELLUNGSVERFAHREN DAFÜR | ||
| Former [2010/16] | STEEL TUBE FOR FUEL INJECTION TUBE AND PROCESS FOR PRODUCING THE SAME | ||
| Former [2010/16] | TUBE D'ACIER POUR TUBE D'INJECTION DE CARBURANT ET SON PROCÉDÉ DE PRODUCTION | Entry into regional phase | 05.02.2010 | Translation filed | 05.02.2010 | National basic fee paid | 05.02.2010 | Search fee paid | 05.02.2010 | Designation fee(s) paid | 05.02.2010 | Examination fee paid | Examination procedure | 05.02.2010 | Examination requested [2010/16] | 04.03.2015 | Amendment by applicant (claims and/or description) | 31.01.2018 | Communication of intention to grant the patent | 30.04.2018 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 12.06.2018 | Communication of intention to grant the patent | 08.10.2018 | Fee for grant paid | 08.10.2018 | Fee for publishing/printing paid | 08.10.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 31.01.2018 | Opposition(s) | Opponent(s) | 01
21.08.2019
27.08.2019
ADMISSIBLE TI Automotive (Heidelberg) GmbH Dischinger Strasse 11 69123 Heidelberg / DE Opponent's representative Andrejewski - Honke Patent- und Rechtsanwälte Partnerschaft mbB An der Reichsbank 8 45127 Essen / DE | [2019/40] | 05.09.2019 | Invitation to proprietor to file observations on the notice of opposition | 09.01.2020 | Reply of patent proprietor to notice(s) of opposition | 30.03.2020 | Despatch of a communication from the opposition division (Time limit: M04) | 07.08.2020 | Reply to a communication from the opposition division | 11.05.2021 | Date of oral proceedings | 14.07.2021 | Despatch of minutes of oral proceedings | 14.07.2021 | Date of despatch of rejection of opposition | 10.07.2023 | Legal effect of rejection of opposition [2023/33] | Appeal following opposition | 06.08.2021 | Appeal received No. T1543/21 | 06.08.2021 | Payment of appeal fee | 23.11.2021 | Statement of grounds filed | 12.06.2023 | Result of appeal procedure: appeal of the opponent was rejected | 30.06.2023 | Despatch of the decision of the Board of Appeal | Fees paid | Renewal fee | 31.03.2010 | Renewal fee patent year 03 | 30.06.2011 | Renewal fee patent year 04 | 29.06.2012 | Renewal fee patent year 05 | 28.06.2013 | Renewal fee patent year 06 | 31.03.2014 | Renewal fee patent year 07 | 30.06.2015 | Renewal fee patent year 08 | 31.03.2016 | Renewal fee patent year 09 | 30.06.2017 | Renewal fee patent year 10 | 29.06.2018 | Renewal fee patent year 11 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 30.06.2008 | AT | 21.11.2018 | CY | 21.11.2018 | CZ | 21.11.2018 | DK | 21.11.2018 | EE | 21.11.2018 | FI | 21.11.2018 | HR | 21.11.2018 | LT | 21.11.2018 | LV | 21.11.2018 | MC | 21.11.2018 | MT | 21.11.2018 | NL | 21.11.2018 | PL | 21.11.2018 | RO | 21.11.2018 | SI | 21.11.2018 | SK | 21.11.2018 | TR | 21.11.2018 | BG | 21.02.2019 | NO | 21.02.2019 | GR | 22.02.2019 | IS | 21.03.2019 | PT | 21.03.2019 | BE | 30.06.2019 | CH | 30.06.2019 | IE | 30.06.2019 | LI | 30.06.2019 | LU | 30.06.2019 | [2021/34] |
| Former [2021/32] | HU | 30.06.2008 | |
| AT | 21.11.2018 | ||
| CY | 21.11.2018 | ||
| CZ | 21.11.2018 | ||
| DK | 21.11.2018 | ||
| EE | 21.11.2018 | ||
| FI | 21.11.2018 | ||
| HR | 21.11.2018 | ||
| LT | 21.11.2018 | ||
| LV | 21.11.2018 | ||
| MC | 21.11.2018 | ||
| NL | 21.11.2018 | ||
| PL | 21.11.2018 | ||
| RO | 21.11.2018 | ||
| SI | 21.11.2018 | ||
| SK | 21.11.2018 | ||
| TR | 21.11.2018 | ||
| BG | 21.02.2019 | ||
| NO | 21.02.2019 | ||
| GR | 22.02.2019 | ||
| IS | 21.03.2019 | ||
| PT | 21.03.2019 | ||
| BE | 30.06.2019 | ||
| CH | 30.06.2019 | ||
| IE | 30.06.2019 | ||
| LI | 30.06.2019 | ||
| LU | 30.06.2019 | ||
| Former [2021/26] | AT | 21.11.2018 | |
| CY | 21.11.2018 | ||
| CZ | 21.11.2018 | ||
| DK | 21.11.2018 | ||
| EE | 21.11.2018 | ||
| FI | 21.11.2018 | ||
| HR | 21.11.2018 | ||
| LT | 21.11.2018 | ||
| LV | 21.11.2018 | ||
| MC | 21.11.2018 | ||
| NL | 21.11.2018 | ||
| PL | 21.11.2018 | ||
| RO | 21.11.2018 | ||
| SI | 21.11.2018 | ||
| SK | 21.11.2018 | ||
| TR | 21.11.2018 | ||
| BG | 21.02.2019 | ||
| NO | 21.02.2019 | ||
| GR | 22.02.2019 | ||
| IS | 21.03.2019 | ||
| PT | 21.03.2019 | ||
| BE | 30.06.2019 | ||
| CH | 30.06.2019 | ||
| IE | 30.06.2019 | ||
| LI | 30.06.2019 | ||
| LU | 30.06.2019 | ||
| Former [2020/25] | AT | 21.11.2018 | |
| CZ | 21.11.2018 | ||
| DK | 21.11.2018 | ||
| EE | 21.11.2018 | ||
| FI | 21.11.2018 | ||
| HR | 21.11.2018 | ||
| LT | 21.11.2018 | ||
| LV | 21.11.2018 | ||
| MC | 21.11.2018 | ||
| NL | 21.11.2018 | ||
| PL | 21.11.2018 | ||
| RO | 21.11.2018 | ||
| SI | 21.11.2018 | ||
| SK | 21.11.2018 | ||
| TR | 21.11.2018 | ||
| BG | 21.02.2019 | ||
| NO | 21.02.2019 | ||
| GR | 22.02.2019 | ||
| IS | 21.03.2019 | ||
| PT | 21.03.2019 | ||
| BE | 30.06.2019 | ||
| CH | 30.06.2019 | ||
| IE | 30.06.2019 | ||
| LI | 30.06.2019 | ||
| LU | 30.06.2019 | ||
| Former [2020/21] | AT | 21.11.2018 | |
| CZ | 21.11.2018 | ||
| DK | 21.11.2018 | ||
| EE | 21.11.2018 | ||
| FI | 21.11.2018 | ||
| HR | 21.11.2018 | ||
| LT | 21.11.2018 | ||
| LV | 21.11.2018 | ||
| MC | 21.11.2018 | ||
| NL | 21.11.2018 | ||
| PL | 21.11.2018 | ||
| RO | 21.11.2018 | ||
| SI | 21.11.2018 | ||
| SK | 21.11.2018 | ||
| TR | 21.11.2018 | ||
| BG | 21.02.2019 | ||
| NO | 21.02.2019 | ||
| GR | 22.02.2019 | ||
| IS | 21.03.2019 | ||
| PT | 21.03.2019 | ||
| IE | 30.06.2019 | ||
| Former [2020/17] | AT | 21.11.2018 | |
| CZ | 21.11.2018 | ||
| DK | 21.11.2018 | ||
| EE | 21.11.2018 | ||
| FI | 21.11.2018 | ||
| HR | 21.11.2018 | ||
| LT | 21.11.2018 | ||
| LV | 21.11.2018 | ||
| MC | 21.11.2018 | ||
| NL | 21.11.2018 | ||
| PL | 21.11.2018 | ||
| RO | 21.11.2018 | ||
| SI | 21.11.2018 | ||
| SK | 21.11.2018 | ||
| TR | 21.11.2018 | ||
| BG | 21.02.2019 | ||
| NO | 21.02.2019 | ||
| GR | 22.02.2019 | ||
| IS | 21.03.2019 | ||
| PT | 21.03.2019 | ||
| Former [2020/08] | AT | 21.11.2018 | |
| CZ | 21.11.2018 | ||
| DK | 21.11.2018 | ||
| EE | 21.11.2018 | ||
| FI | 21.11.2018 | ||
| HR | 21.11.2018 | ||
| LT | 21.11.2018 | ||
| LV | 21.11.2018 | ||
| MC | 21.11.2018 | ||
| NL | 21.11.2018 | ||
| PL | 21.11.2018 | ||
| RO | 21.11.2018 | ||
| SI | 21.11.2018 | ||
| SK | 21.11.2018 | ||
| BG | 21.02.2019 | ||
| NO | 21.02.2019 | ||
| GR | 22.02.2019 | ||
| IS | 21.03.2019 | ||
| PT | 21.03.2019 | ||
| Former [2019/49] | AT | 21.11.2018 | |
| CZ | 21.11.2018 | ||
| DK | 21.11.2018 | ||
| EE | 21.11.2018 | ||
| FI | 21.11.2018 | ||
| HR | 21.11.2018 | ||
| LT | 21.11.2018 | ||
| LV | 21.11.2018 | ||
| NL | 21.11.2018 | ||
| PL | 21.11.2018 | ||
| RO | 21.11.2018 | ||
| SI | 21.11.2018 | ||
| SK | 21.11.2018 | ||
| BG | 21.02.2019 | ||
| NO | 21.02.2019 | ||
| GR | 22.02.2019 | ||
| IS | 21.03.2019 | ||
| PT | 21.03.2019 | ||
| Former [2019/40] | AT | 21.11.2018 | |
| CZ | 21.11.2018 | ||
| DK | 21.11.2018 | ||
| EE | 21.11.2018 | ||
| FI | 21.11.2018 | ||
| HR | 21.11.2018 | ||
| LT | 21.11.2018 | ||
| LV | 21.11.2018 | ||
| NL | 21.11.2018 | ||
| PL | 21.11.2018 | ||
| RO | 21.11.2018 | ||
| SK | 21.11.2018 | ||
| BG | 21.02.2019 | ||
| NO | 21.02.2019 | ||
| GR | 22.02.2019 | ||
| IS | 21.03.2019 | ||
| PT | 21.03.2019 | ||
| Former [2019/37] | AT | 21.11.2018 | |
| CZ | 21.11.2018 | ||
| DK | 21.11.2018 | ||
| EE | 21.11.2018 | ||
| FI | 21.11.2018 | ||
| HR | 21.11.2018 | ||
| LT | 21.11.2018 | ||
| LV | 21.11.2018 | ||
| NL | 21.11.2018 | ||
| PL | 21.11.2018 | ||
| RO | 21.11.2018 | ||
| BG | 21.02.2019 | ||
| NO | 21.02.2019 | ||
| GR | 22.02.2019 | ||
| IS | 21.03.2019 | ||
| PT | 21.03.2019 | ||
| Former [2019/35] | AT | 21.11.2018 | |
| CZ | 21.11.2018 | ||
| DK | 21.11.2018 | ||
| FI | 21.11.2018 | ||
| HR | 21.11.2018 | ||
| LT | 21.11.2018 | ||
| LV | 21.11.2018 | ||
| NL | 21.11.2018 | ||
| PL | 21.11.2018 | ||
| BG | 21.02.2019 | ||
| NO | 21.02.2019 | ||
| GR | 22.02.2019 | ||
| IS | 21.03.2019 | ||
| PT | 21.03.2019 | ||
| Former [2019/34] | AT | 21.11.2018 | |
| DK | 21.11.2018 | ||
| FI | 21.11.2018 | ||
| HR | 21.11.2018 | ||
| LT | 21.11.2018 | ||
| LV | 21.11.2018 | ||
| NL | 21.11.2018 | ||
| BG | 21.02.2019 | ||
| NO | 21.02.2019 | ||
| GR | 22.02.2019 | ||
| IS | 21.03.2019 | ||
| PT | 21.03.2019 | ||
| Former [2019/26] | AT | 21.11.2018 | |
| FI | 21.11.2018 | ||
| HR | 21.11.2018 | ||
| LT | 21.11.2018 | ||
| LV | 21.11.2018 | ||
| NL | 21.11.2018 | ||
| BG | 21.02.2019 | ||
| NO | 21.02.2019 | ||
| GR | 22.02.2019 | ||
| IS | 21.03.2019 | ||
| PT | 21.03.2019 | ||
| Former [2019/24] | AT | 21.11.2018 | |
| FI | 21.11.2018 | ||
| HR | 21.11.2018 | ||
| LT | 21.11.2018 | ||
| LV | 21.11.2018 | ||
| NL | 21.11.2018 | ||
| BG | 21.02.2019 | ||
| NO | 21.02.2019 | ||
| GR | 22.02.2019 | ||
| IS | 21.03.2019 | ||
| Former [2019/23] | AT | 21.11.2018 | |
| FI | 21.11.2018 | ||
| HR | 21.11.2018 | ||
| LT | 21.11.2018 | ||
| LV | 21.11.2018 | ||
| NL | 21.11.2018 | ||
| BG | 21.02.2019 | ||
| NO | 21.02.2019 | ||
| IS | 21.03.2019 | ||
| Former [2019/22] | FI | 21.11.2018 | |
| LT | 21.11.2018 | ||
| BG | 21.02.2019 | ||
| NO | 21.02.2019 | ||
| IS | 21.03.2019 | ||
| Former [2019/21] | FI | 21.11.2018 | |
| LT | 21.11.2018 | ||
| NO | 21.02.2019 | ||
| IS | 21.03.2019 | ||
| Former [2019/20] | LT | 21.11.2018 | |
| NO | 21.02.2019 | Documents cited: | Search | [A] EP1528114 (DAIDO STEEL CO LTD et al.) | [E] EP2022866 (USUI KOKUSAI SANGYO KK et al.) | [AP] EP1918388 (SANOH IND CO LTD et al.) | [A] JP2001172739 (SUMITOMO METAL IND et al.) | [A] JP2004083986 (NIPPON STEEL CORP et al.) | [A] EP1375683 (SUMITOMO METAL IND et al.) | [A] US2005127665 (USUI MASAYOSHI et al.) | International search | [Y] JP3906942 [Y] | [Y] JP3410947 [Y] | [Y] JPH1088274 (JAPAN CASTING FORGING CORP et al.) [Y] | [Y] JPS6354765 (SUMITOMO METAL IND) [Y] | [A] JP2007040246 (NIPPON STEEL CORP et al.) [A] | [A] JP3258207 [A] | [A] JPH11302726 (NIPPON STEEL CORP et al.) [A] | Opposition | EP2022866 | EP1528114 | EP1914418 | EP1918388 | DE69617002 | US2005252580 | DE19716659 | JIS: "Microscopic testing method for the non-metallic inclusions in steel", JAPANESE INDUSTRIAL STANDARD G 0555, 2003, XP055637935 | ANONYMOUS: "Common-Rail-Einspritzung", WIKIPEDIA, 3 July 2007 (2007-07-03), XP055637937, Retrieved from the Internet | ANONYMOUS: "Vergten (Metallbearbeitung)", WIKIPEDIA, 28 January 2007 (2007-01-28), XP055637940, Retrieved from the Internet | ANONYMOUS: "Anlassen", WIKIPEDIA, 4 July 2007 (2007-07-04), XP055637942, Retrieved from the Internet |