EP2152064 - Method and arrangement in a milking system [Right-click to bookmark this link] | |||
Former [2010/07] | METHOD AND ARRANGEMENT IN A MILKING SYSTEM | ||
[2012/19] | Status | Patent maintained as amended Status updated on 11.10.2019 Database last updated on 11.05.2024 | Most recent event Tooltip | 11.10.2019 | Patent maintained (B2 publication) | published on 13.11.2019 [2019/46] | Applicant(s) | For all designated states DeLaval Holding AB Box 39 147 21 Tumba / SE | [2012/42] |
Former [2010/07] | For all designated states DeLaval Holding AB Box 39 147 21 Tumba / SE | Inventor(s) | 01 /
WESTMAN, Anders Sjöviksvägen 27 S-144 61 Rönninge / SE | 02 /
THYLÈN, Anders Sedelvägen 30 S-147 40 Tumba / SE | [2010/07] | Representative(s) | Lilliehorn, Tobias, et al DeLaval International AB Intellectual Property Support Legal Affairs P.O.Box 39 147 21 Tumba / SE | [2019/46] |
Former [2013/47] | Gray, Helen Mary, et al Zacco GmbH Bayerstrasse 83 80335 München / DE | ||
Former [2012/34] | Keijser Bergöö, Malin Katarina, et al DeLaval International AB Intellectual Property Support Legal Affairs Box 39 147 21 Tumba / SE | ||
Former [2010/07] | Petersson, Hans Göran, et al Kransell & Wennborg KB P.O. Box 27834 S-115 93 Stockholm / SE | Application number, filing date | 08779306.3 | 27.05.2008 | [2010/07] | WO2008SE50623 | Priority number, date | SE20070001331 | 01.06.2007 Original published format: SE 0701331 | [2010/07] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2008147321 | Date: | 04.12.2008 | Language: | EN | [2008/49] | Type: | A1 Application with search report | No.: | EP2152064 | Date: | 17.02.2010 | Language: | EN | The application published by WIPO in one of the EPO official languages on 04.12.2008 takes the place of the publication of the European patent application. | [2010/07] | Type: | B1 Patent specification | No.: | EP2152064 | Date: | 17.10.2012 | Language: | EN | [2012/42] | Type: | B2 New European patent specification | No.: | EP2152064 | Date: | 13.11.2019 | Language: | EN | [2019/46] | Search report(s) | International search report - published on: | SE | 04.12.2008 | (Supplementary) European search report - dispatched on: | EP | 29.09.2011 | Classification | IPC: | B08B9/032, A01J7/02 | [2012/15] | CPC: |
B08B9/0321 (EP,US);
A01J7/022 (EP,SE,US);
B08B9/0325 (EP,US);
Y10T137/0324 (EP,US);
Y10T137/7722 (EP,US)
|
Former IPC [2010/07] | A01J7/02, B08B9/027 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2019/46] |
Former [2010/07] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | Verfahren und Anordnung in einem Melksystem | [2012/19] | English: | Method and arrangement in a milking system | [2012/19] | French: | Procédé et arrangement dans un système de traite | [2012/19] |
Former [2010/07] | VERFAHREN UND ANORDNUNG IN EINEM MELKSYSTEM | ||
Former [2010/07] | METHOD AND ARRANGEMENT IN A MILKING SYSTEM | ||
Former [2010/07] | PROCÉDÉ ET ARRANGEMENT DANS UN SYSTÈME DE TRAITE | Entry into regional phase | 22.12.2009 | National basic fee paid | 22.12.2009 | Search fee paid | 22.12.2009 | Designation fee(s) paid | 22.12.2009 | Examination fee paid | Examination procedure | 22.12.2009 | Examination requested [2010/07] | 09.01.2012 | Amendment by applicant (claims and/or description) | 18.04.2012 | Communication of intention to grant the patent | 16.08.2012 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 30.08.2012 | Communication of intention to grant the patent | 03.09.2012 | Fee for grant paid | 03.09.2012 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 18.04.2012 | Opposition(s) | Opponent(s) | 01
17.07.2013
23.07.2013
ADMISSIBLE Octrooibureau Van der Lely N.V. Weverskade 110 3147 PA MAASSLUIS / NL | [2013/35] | 21.08.2013 | Invitation to proprietor to file observations on the notice of opposition | 03.01.2014 | Reply of patent proprietor to notice(s) of opposition | 09.07.2015 | Date of oral proceedings | 06.08.2015 | Despatch of interlocutory decision in opposition | 06.08.2015 | Despatch of minutes of oral proceedings | 08.03.2019 | Legal effect of interlocutory decision in opposition | 04.07.2019 | Despatch of communication that the patent will be maintained as amended | Appeal following opposition | 25.08.2015 | Appeal received No. T1679/15 | 16.12.2015 | Statement of grounds filed | 08.03.2019 | Result of appeal procedure: appeal of the opponent was rejected | 08.03.2019 | Date of oral proceedings | 14.03.2019 | Minutes of the oral proceedings despatched | Fees paid | Renewal fee | 25.05.2010 | Renewal fee patent year 03 | 24.05.2011 | Renewal fee patent year 04 | 29.03.2012 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 27.05.2008 | AT | 17.10.2012 | BE | 17.10.2012 | CY | 17.10.2012 | CZ | 17.10.2012 | DK | 17.10.2012 | EE | 17.10.2012 | FI | 17.10.2012 | HR | 17.10.2012 | IT | 17.10.2012 | LT | 17.10.2012 | LV | 17.10.2012 | MC | 17.10.2012 | MT | 17.10.2012 | PL | 17.10.2012 | RO | 17.10.2012 | SE | 17.10.2012 | SI | 17.10.2012 | SK | 17.10.2012 | TR | 17.10.2012 | BG | 17.01.2013 | NO | 17.01.2013 | GR | 18.01.2013 | ES | 28.01.2013 | IS | 17.02.2013 | PT | 18.02.2013 | IE | 27.05.2013 | LU | 27.05.2013 | CH | 31.05.2013 | FR | 31.05.2013 | LI | 31.05.2013 | [2015/34] |
Former [2015/32] | AT | 17.10.2012 | |
BE | 17.10.2012 | ||
CY | 17.10.2012 | ||
CZ | 17.10.2012 | ||
DK | 17.10.2012 | ||
EE | 17.10.2012 | ||
FI | 17.10.2012 | ||
HR | 17.10.2012 | ||
IT | 17.10.2012 | ||
LT | 17.10.2012 | ||
LV | 17.10.2012 | ||
MC | 17.10.2012 | ||
MT | 17.10.2012 | ||
PL | 17.10.2012 | ||
RO | 17.10.2012 | ||
SE | 17.10.2012 | ||
SI | 17.10.2012 | ||
SK | 17.10.2012 | ||
TR | 17.10.2012 | ||
BG | 17.01.2013 | ||
NO | 17.01.2013 | ||
GR | 18.01.2013 | ||
ES | 28.01.2013 | ||
IS | 17.02.2013 | ||
PT | 18.02.2013 | ||
IE | 27.05.2013 | ||
CH | 31.05.2013 | ||
FR | 31.05.2013 | ||
LI | 31.05.2013 | ||
Former [2015/13] | AT | 17.10.2012 | |
BE | 17.10.2012 | ||
CY | 17.10.2012 | ||
CZ | 17.10.2012 | ||
DK | 17.10.2012 | ||
EE | 17.10.2012 | ||
FI | 17.10.2012 | ||
HR | 17.10.2012 | ||
IT | 17.10.2012 | ||
LT | 17.10.2012 | ||
LV | 17.10.2012 | ||
MC | 17.10.2012 | ||
MT | 17.10.2012 | ||
PL | 17.10.2012 | ||
RO | 17.10.2012 | ||
SE | 17.10.2012 | ||
SI | 17.10.2012 | ||
SK | 17.10.2012 | ||
BG | 17.01.2013 | ||
NO | 17.01.2013 | ||
GR | 18.01.2013 | ||
ES | 28.01.2013 | ||
IS | 17.02.2013 | ||
PT | 18.02.2013 | ||
IE | 27.05.2013 | ||
CH | 31.05.2013 | ||
FR | 31.05.2013 | ||
LI | 31.05.2013 | ||
Former [2014/24] | AT | 17.10.2012 | |
BE | 17.10.2012 | ||
CY | 17.10.2012 | ||
CZ | 17.10.2012 | ||
DK | 17.10.2012 | ||
EE | 17.10.2012 | ||
FI | 17.10.2012 | ||
HR | 17.10.2012 | ||
IT | 17.10.2012 | ||
LT | 17.10.2012 | ||
LV | 17.10.2012 | ||
MC | 17.10.2012 | ||
PL | 17.10.2012 | ||
RO | 17.10.2012 | ||
SE | 17.10.2012 | ||
SI | 17.10.2012 | ||
SK | 17.10.2012 | ||
BG | 17.01.2013 | ||
NO | 17.01.2013 | ||
GR | 18.01.2013 | ||
ES | 28.01.2013 | ||
IS | 17.02.2013 | ||
PT | 18.02.2013 | ||
IE | 27.05.2013 | ||
CH | 31.05.2013 | ||
FR | 31.05.2013 | ||
LI | 31.05.2013 | ||
Former [2014/20] | AT | 17.10.2012 | |
BE | 17.10.2012 | ||
CY | 17.10.2012 | ||
CZ | 17.10.2012 | ||
DK | 17.10.2012 | ||
EE | 17.10.2012 | ||
FI | 17.10.2012 | ||
HR | 17.10.2012 | ||
IT | 17.10.2012 | ||
LT | 17.10.2012 | ||
LV | 17.10.2012 | ||
MC | 17.10.2012 | ||
PL | 17.10.2012 | ||
RO | 17.10.2012 | ||
SE | 17.10.2012 | ||
SI | 17.10.2012 | ||
SK | 17.10.2012 | ||
BG | 17.01.2013 | ||
NO | 17.01.2013 | ||
GR | 18.01.2013 | ||
ES | 28.01.2013 | ||
IS | 17.02.2013 | ||
PT | 18.02.2013 | ||
IE | 27.05.2013 | ||
CH | 31.05.2013 | ||
LI | 31.05.2013 | ||
Former [2014/08] | AT | 17.10.2012 | |
BE | 17.10.2012 | ||
CY | 17.10.2012 | ||
CZ | 17.10.2012 | ||
DK | 17.10.2012 | ||
EE | 17.10.2012 | ||
FI | 17.10.2012 | ||
HR | 17.10.2012 | ||
IT | 17.10.2012 | ||
LT | 17.10.2012 | ||
LV | 17.10.2012 | ||
MC | 17.10.2012 | ||
PL | 17.10.2012 | ||
RO | 17.10.2012 | ||
SE | 17.10.2012 | ||
SI | 17.10.2012 | ||
SK | 17.10.2012 | ||
BG | 17.01.2013 | ||
NO | 17.01.2013 | ||
GR | 18.01.2013 | ||
ES | 28.01.2013 | ||
IS | 17.02.2013 | ||
PT | 18.02.2013 | ||
CH | 31.05.2013 | ||
LI | 31.05.2013 | ||
Former [2014/03] | AT | 17.10.2012 | |
BE | 17.10.2012 | ||
CY | 17.10.2012 | ||
CZ | 17.10.2012 | ||
DK | 17.10.2012 | ||
EE | 17.10.2012 | ||
FI | 17.10.2012 | ||
HR | 17.10.2012 | ||
IT | 17.10.2012 | ||
LT | 17.10.2012 | ||
LV | 17.10.2012 | ||
MC | 17.10.2012 | ||
PL | 17.10.2012 | ||
RO | 17.10.2012 | ||
SE | 17.10.2012 | ||
SI | 17.10.2012 | ||
SK | 17.10.2012 | ||
BG | 17.01.2013 | ||
NO | 17.01.2013 | ||
GR | 18.01.2013 | ||
ES | 28.01.2013 | ||
IS | 17.02.2013 | ||
PT | 18.02.2013 | ||
Former [2013/52] | AT | 17.10.2012 | |
BE | 17.10.2012 | ||
CY | 17.10.2012 | ||
CZ | 17.10.2012 | ||
DK | 17.10.2012 | ||
EE | 17.10.2012 | ||
FI | 17.10.2012 | ||
HR | 17.10.2012 | ||
IT | 17.10.2012 | ||
LT | 17.10.2012 | ||
LV | 17.10.2012 | ||
PL | 17.10.2012 | ||
RO | 17.10.2012 | ||
SE | 17.10.2012 | ||
SI | 17.10.2012 | ||
SK | 17.10.2012 | ||
BG | 17.01.2013 | ||
NO | 17.01.2013 | ||
GR | 18.01.2013 | ||
ES | 28.01.2013 | ||
IS | 17.02.2013 | ||
PT | 18.02.2013 | ||
Former [2013/37] | AT | 17.10.2012 | |
BE | 17.10.2012 | ||
CZ | 17.10.2012 | ||
DK | 17.10.2012 | ||
EE | 17.10.2012 | ||
FI | 17.10.2012 | ||
HR | 17.10.2012 | ||
IT | 17.10.2012 | ||
LT | 17.10.2012 | ||
LV | 17.10.2012 | ||
PL | 17.10.2012 | ||
RO | 17.10.2012 | ||
SE | 17.10.2012 | ||
SI | 17.10.2012 | ||
SK | 17.10.2012 | ||
BG | 17.01.2013 | ||
NO | 17.01.2013 | ||
GR | 18.01.2013 | ||
ES | 28.01.2013 | ||
IS | 17.02.2013 | ||
PT | 18.02.2013 | ||
Former [2013/35] | AT | 17.10.2012 | |
BE | 17.10.2012 | ||
CZ | 17.10.2012 | ||
DK | 17.10.2012 | ||
EE | 17.10.2012 | ||
FI | 17.10.2012 | ||
HR | 17.10.2012 | ||
LT | 17.10.2012 | ||
LV | 17.10.2012 | ||
PL | 17.10.2012 | ||
SE | 17.10.2012 | ||
SI | 17.10.2012 | ||
SK | 17.10.2012 | ||
BG | 17.01.2013 | ||
NO | 17.01.2013 | ||
GR | 18.01.2013 | ||
ES | 28.01.2013 | ||
IS | 17.02.2013 | ||
PT | 18.02.2013 | ||
Former [2013/34] | AT | 17.10.2012 | |
BE | 17.10.2012 | ||
DK | 17.10.2012 | ||
FI | 17.10.2012 | ||
HR | 17.10.2012 | ||
LT | 17.10.2012 | ||
LV | 17.10.2012 | ||
PL | 17.10.2012 | ||
SE | 17.10.2012 | ||
SI | 17.10.2012 | ||
BG | 17.01.2013 | ||
NO | 17.01.2013 | ||
GR | 18.01.2013 | ||
ES | 28.01.2013 | ||
IS | 17.02.2013 | ||
PT | 18.02.2013 | ||
Former [2013/31] | AT | 17.10.2012 | |
BE | 17.10.2012 | ||
FI | 17.10.2012 | ||
HR | 17.10.2012 | ||
LT | 17.10.2012 | ||
LV | 17.10.2012 | ||
PL | 17.10.2012 | ||
SE | 17.10.2012 | ||
SI | 17.10.2012 | ||
NO | 17.01.2013 | ||
GR | 18.01.2013 | ||
ES | 28.01.2013 | ||
IS | 17.02.2013 | ||
PT | 18.02.2013 | ||
Former [2013/28] | BE | 17.10.2012 | |
FI | 17.10.2012 | ||
HR | 17.10.2012 | ||
LT | 17.10.2012 | ||
LV | 17.10.2012 | ||
PL | 17.10.2012 | ||
SE | 17.10.2012 | ||
SI | 17.10.2012 | ||
NO | 17.01.2013 | ||
GR | 18.01.2013 | ||
ES | 28.01.2013 | ||
IS | 17.02.2013 | ||
PT | 18.02.2013 | ||
Former [2013/26] | BE | 17.10.2012 | |
FI | 17.10.2012 | ||
HR | 17.10.2012 | ||
LT | 17.10.2012 | ||
LV | 17.10.2012 | ||
PL | 17.10.2012 | ||
SE | 17.10.2012 | ||
SI | 17.10.2012 | ||
NO | 17.01.2013 | ||
GR | 18.01.2013 | ||
ES | 28.01.2013 | ||
IS | 17.02.2013 | ||
Former [2013/24] | BE | 17.10.2012 | |
FI | 17.10.2012 | ||
HR | 17.10.2012 | ||
LT | 17.10.2012 | ||
LV | 17.10.2012 | ||
PL | 17.10.2012 | ||
SE | 17.10.2012 | ||
NO | 17.01.2013 | ||
GR | 18.01.2013 | ||
ES | 28.01.2013 | ||
IS | 17.02.2013 | ||
Former [2013/23] | FI | 17.10.2012 | |
HR | 17.10.2012 | ||
LT | 17.10.2012 | ||
LV | 17.10.2012 | ||
PL | 17.10.2012 | ||
SE | 17.10.2012 | ||
NO | 17.01.2013 | ||
ES | 28.01.2013 | ||
IS | 17.02.2013 | ||
Former [2013/22] | FI | 17.10.2012 | |
LT | 17.10.2012 | ||
SE | 17.10.2012 | ||
NO | 17.01.2013 | ||
ES | 28.01.2013 | ||
IS | 17.02.2013 | ||
Former [2013/21] | LT | 17.10.2012 | |
SE | 17.10.2012 | ||
NO | 17.01.2013 | ||
Former [2013/20] | LT | 17.10.2012 | |
NO | 17.01.2013 | Documents cited: | Search | [XAI]GB2339877 (O DEA WENDY MARGARET [GB], et al) [X] 1,9 * page 10, paragraph 3 - page 11, paragraph 1; claim 1 * [A] 6,10,15 [I] 2-5,7,8,11-14; | [I]JP2004321119 (ORION MACHINERY CO LTD) [I] 1,9* abstract * | International search | [A]US2680445 (HEMMINGER ROGER S); | [A]US2878819 (ARTHUR THOMAS CHESTER); | [A]US4572105 (CHOWDHURY MOFAZZAL H [US], et al); | [A]US5896828 (KRONSCHNABEL GERALD L [US], et al); | [A]JP2000324970 (ORION MACHINERY CO LTD); | [A]WO2005058023 (DELAVAL HOLDING AB [SE], et al); | [A]WO2005102035 (DUKE JAMES RICHARD JOHN [GB]); | [A]WO2006032731 (TAMPEREEN TEOLLISUUSSAEHKOE OY [FI], et al) | Opposition | US4485830 | GB2194830 | EP0679331 | US6089242 | EP1579759 | DE102005056841 | WO2007100280 |