EP2198415 - SECURITY SEAL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 26.02.2016 Database last updated on 26.07.2024 | Most recent event Tooltip | 13.10.2017 | Lapse of the patent in a contracting state New state(s): BG, CY, HU, MT, SE, TR | published on 15.11.2017 [2017/46] | Applicant(s) | For all designated states Elc Serviços Gráficos De Segurança Ltda. Estrada Prefeito Antonio da Cruz Barros 693 Galpão 1 Paraíba do Sul - RJ / BR | [2014/50] |
Former [2010/25] | For all designated states Elc Serviços Gráficos De Segurança Ltda. Estrada Prefeito Antonio da Cruz Barros 696 Galpão 1 Paraíba do Sul - RJ / BR | Inventor(s) | 01 /
DE LIMA CASTRO, André Rua Othon Bezerra de Melo 40 22460-310 - Rio de Janeiro - RJ / BR | [2010/25] | Representative(s) | Burt, Matthew Thomas, et al Abel & Imray 20 Red Lion Street London WC1R 4PQ / GB | [2015/17] |
Former [2010/25] | Burt, Matthew Thomas, et al Abel & Imray 20 Red Lion Street London WC1R 4PQ / GB | Application number, filing date | 08800232.4 | 08.10.2008 | [2010/25] | WO2008BR00303 | Priority number, date | BR2007PI03689 | 10.10.2007 Original published format: BR PI0703689 | [2010/25] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2009046510 | Date: | 16.04.2009 | Language: | EN | [2009/16] | Type: | A2 Application without search report | No.: | EP2198415 | Date: | 23.06.2010 | Language: | EN | The application published by WIPO in one of the EPO official languages on 16.04.2009 takes the place of the publication of the European patent application. | [2010/25] | Type: | B1 Patent specification | No.: | EP2198415 | Date: | 22.04.2015 | Language: | EN | [2015/17] | Search report(s) | International search report - published on: | EP | 27.08.2009 | Classification | IPC: | G09F3/03 | [2010/25] | CPC: |
G09F3/037 (EP,US);
G09F3/0311 (EP,US);
G09F3/0352 (EP,US);
Y10T292/48 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2015/17] |
Former [2010/25] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | SICHERHEITSSIEGEL | [2010/25] | English: | SECURITY SEAL | [2010/25] | French: | INDICATEUR D'EFFRACTION | [2010/25] | Entry into regional phase | 29.03.2010 | National basic fee paid | 29.03.2010 | Designation fee(s) paid | 29.03.2010 | Examination fee paid | Examination procedure | 29.03.2010 | Examination requested [2010/25] | 14.06.2010 | Amendment by applicant (claims and/or description) | 14.11.2014 | Communication of intention to grant the patent | 12.03.2015 | Fee for grant paid | 12.03.2015 | Fee for publishing/printing paid | 12.03.2015 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 14.11.2014 | Opposition(s) | 25.01.2016 | No opposition filed within time limit [2016/13] | Fees paid | Renewal fee | 12.10.2010 | Renewal fee patent year 03 | 11.10.2011 | Renewal fee patent year 04 | 11.10.2012 | Renewal fee patent year 05 | 14.10.2013 | Renewal fee patent year 06 | 14.10.2014 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 08.10.2008 | AT | 22.04.2015 | BE | 22.04.2015 | BG | 22.04.2015 | CY | 22.04.2015 | CZ | 22.04.2015 | DK | 22.04.2015 | EE | 22.04.2015 | FI | 22.04.2015 | HR | 22.04.2015 | LT | 22.04.2015 | LV | 22.04.2015 | MC | 22.04.2015 | MT | 22.04.2015 | NL | 22.04.2015 | PL | 22.04.2015 | RO | 22.04.2015 | SE | 22.04.2015 | SI | 22.04.2015 | SK | 22.04.2015 | TR | 22.04.2015 | NO | 22.07.2015 | GR | 23.07.2015 | IS | 22.08.2015 | PT | 24.08.2015 | IE | 08.10.2015 | LU | 08.10.2015 | CH | 31.10.2015 | LI | 31.10.2015 | [2017/39] |
Former [2016/45] | AT | 22.04.2015 | |
BE | 22.04.2015 | ||
CZ | 22.04.2015 | ||
DK | 22.04.2015 | ||
EE | 22.04.2015 | ||
FI | 22.04.2015 | ||
HR | 22.04.2015 | ||
LT | 22.04.2015 | ||
LV | 22.04.2015 | ||
MC | 22.04.2015 | ||
NL | 22.04.2015 | ||
PL | 22.04.2015 | ||
RO | 22.04.2015 | ||
SI | 22.04.2015 | ||
SK | 22.04.2015 | ||
NO | 22.07.2015 | ||
GR | 23.07.2015 | ||
IS | 22.08.2015 | ||
PT | 24.08.2015 | ||
IE | 08.10.2015 | ||
LU | 08.10.2015 | ||
CH | 31.10.2015 | ||
LI | 31.10.2015 | ||
Former [2016/37] | AT | 22.04.2015 | |
BE | 22.04.2015 | ||
CZ | 22.04.2015 | ||
DK | 22.04.2015 | ||
EE | 22.04.2015 | ||
FI | 22.04.2015 | ||
HR | 22.04.2015 | ||
LT | 22.04.2015 | ||
LV | 22.04.2015 | ||
MC | 22.04.2015 | ||
NL | 22.04.2015 | ||
PL | 22.04.2015 | ||
RO | 22.04.2015 | ||
SI | 22.04.2015 | ||
SK | 22.04.2015 | ||
NO | 22.07.2015 | ||
GR | 23.07.2015 | ||
IS | 22.08.2015 | ||
PT | 24.08.2015 | ||
LU | 08.10.2015 | ||
CH | 31.10.2015 | ||
LI | 31.10.2015 | ||
Former [2016/34] | AT | 22.04.2015 | |
CZ | 22.04.2015 | ||
DK | 22.04.2015 | ||
EE | 22.04.2015 | ||
FI | 22.04.2015 | ||
HR | 22.04.2015 | ||
LT | 22.04.2015 | ||
LV | 22.04.2015 | ||
MC | 22.04.2015 | ||
NL | 22.04.2015 | ||
PL | 22.04.2015 | ||
RO | 22.04.2015 | ||
SI | 22.04.2015 | ||
SK | 22.04.2015 | ||
NO | 22.07.2015 | ||
GR | 23.07.2015 | ||
IS | 22.08.2015 | ||
PT | 24.08.2015 | ||
LU | 08.10.2015 | ||
CH | 31.10.2015 | ||
LI | 31.10.2015 | ||
Former [2016/28] | AT | 22.04.2015 | |
CZ | 22.04.2015 | ||
DK | 22.04.2015 | ||
EE | 22.04.2015 | ||
FI | 22.04.2015 | ||
HR | 22.04.2015 | ||
LT | 22.04.2015 | ||
LV | 22.04.2015 | ||
MC | 22.04.2015 | ||
NL | 22.04.2015 | ||
PL | 22.04.2015 | ||
RO | 22.04.2015 | ||
SI | 22.04.2015 | ||
SK | 22.04.2015 | ||
NO | 22.07.2015 | ||
GR | 23.07.2015 | ||
IS | 22.08.2015 | ||
PT | 24.08.2015 | ||
LU | 08.10.2015 | ||
Former [2016/26] | AT | 22.04.2015 | |
CZ | 22.04.2015 | ||
DK | 22.04.2015 | ||
EE | 22.04.2015 | ||
FI | 22.04.2015 | ||
HR | 22.04.2015 | ||
LT | 22.04.2015 | ||
LV | 22.04.2015 | ||
NL | 22.04.2015 | ||
PL | 22.04.2015 | ||
RO | 22.04.2015 | ||
SI | 22.04.2015 | ||
SK | 22.04.2015 | ||
NO | 22.07.2015 | ||
GR | 23.07.2015 | ||
IS | 22.08.2015 | ||
PT | 24.08.2015 | ||
LU | 08.10.2015 | ||
Former [2016/24] | AT | 22.04.2015 | |
CZ | 22.04.2015 | ||
DK | 22.04.2015 | ||
EE | 22.04.2015 | ||
FI | 22.04.2015 | ||
HR | 22.04.2015 | ||
LT | 22.04.2015 | ||
LV | 22.04.2015 | ||
NL | 22.04.2015 | ||
PL | 22.04.2015 | ||
RO | 22.04.2015 | ||
SI | 22.04.2015 | ||
SK | 22.04.2015 | ||
NO | 22.07.2015 | ||
GR | 23.07.2015 | ||
IS | 22.08.2015 | ||
PT | 24.08.2015 | ||
Former [2016/10] | AT | 22.04.2015 | |
CZ | 22.04.2015 | ||
DK | 22.04.2015 | ||
EE | 22.04.2015 | ||
FI | 22.04.2015 | ||
HR | 22.04.2015 | ||
LT | 22.04.2015 | ||
LV | 22.04.2015 | ||
NL | 22.04.2015 | ||
PL | 22.04.2015 | ||
RO | 22.04.2015 | ||
SK | 22.04.2015 | ||
NO | 22.07.2015 | ||
GR | 23.07.2015 | ||
IS | 22.08.2015 | ||
PT | 24.08.2015 | ||
Former [2016/09] | AT | 22.04.2015 | |
DK | 22.04.2015 | ||
EE | 22.04.2015 | ||
FI | 22.04.2015 | ||
HR | 22.04.2015 | ||
LT | 22.04.2015 | ||
LV | 22.04.2015 | ||
NL | 22.04.2015 | ||
NO | 22.07.2015 | ||
GR | 23.07.2015 | ||
IS | 22.08.2015 | ||
PT | 24.08.2015 | ||
Former [2016/07] | AT | 22.04.2015 | |
DK | 22.04.2015 | ||
FI | 22.04.2015 | ||
HR | 22.04.2015 | ||
LT | 22.04.2015 | ||
LV | 22.04.2015 | ||
NL | 22.04.2015 | ||
NO | 22.07.2015 | ||
GR | 23.07.2015 | ||
IS | 22.08.2015 | ||
PT | 24.08.2015 | ||
Former [2015/51] | AT | 22.04.2015 | |
FI | 22.04.2015 | ||
HR | 22.04.2015 | ||
LT | 22.04.2015 | ||
LV | 22.04.2015 | ||
NL | 22.04.2015 | ||
NO | 22.07.2015 | ||
GR | 23.07.2015 | ||
IS | 22.08.2015 | ||
PT | 24.08.2015 | ||
Former [2015/50] | FI | 22.04.2015 | |
HR | 22.04.2015 | ||
LT | 22.04.2015 | ||
LV | 22.04.2015 | ||
NL | 22.04.2015 | ||
NO | 22.07.2015 | ||
GR | 23.07.2015 | ||
IS | 22.08.2015 | ||
PT | 24.08.2015 | ||
Former [2015/49] | FI | 22.04.2015 | |
HR | 22.04.2015 | ||
LT | 22.04.2015 | ||
LV | 22.04.2015 | ||
NL | 22.04.2015 | ||
NO | 22.07.2015 | ||
GR | 23.07.2015 | ||
PT | 24.08.2015 | ||
Former [2015/42] | NL | 22.04.2015 | Cited in | International search | [A]FR2874115 (ELLIPSE IND SA [FR]) [A] 1-10 * figures 1-3 * * page 4, line 28 - line 30 *; | [A]EP1768080 (BROOKS TODO SEGURIDAD ESPANA [ES]) [A] 1-10 * abstract *; | [A]GB2326620 (UNIVERSAL(UK) LTD [GB]) [A] 1-10 * figure 1 * * abstract * | by applicant | FR2874115 |