EP2332276 - PASSIVE OPTICAL NETWORKS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.11.2012 Database last updated on 19.10.2024 | Most recent event Tooltip | 18.07.2014 | Lapse of the patent in a contracting state New state(s): HU | published on 20.08.2014 [2014/34] | Applicant(s) | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | [N/P] |
Former [2011/24] | For all designated states Telefonaktiebolaget L M Ericsson (PUBL) Torshamnsgaten 23 16483 Stockholm / SE | Inventor(s) | 01 /
PRESI, Marco Via G. Moruzzi 1 I-56100 Pisa / IT | 02 /
CONTESTABILE, Giampiero Via Gobetti 15 I-04019 Terracina (LT) / IT | 03 /
CIARAMELLA, Ernesto V.Ludovico di Savola 21 I-00185 Roma / IT | 04 /
PROIETTII, Roberto Via Calcesana 113 I-56017 San Giuliano Terme (PI) / IT | [2011/24] | Representative(s) | Parkinson, Neil Scott Ericsson Limited Patent Unit Optical Networks Unit 4 Midleton Gate Guildford Business Park, Guildford Surrey GU2 8SG / GB | [N/P] |
Former [2012/04] | Parkinson, Neil Scott Ericsson Limited Patent Unit Optical Networks Unit 4 Midleton Gate Guildford Business Park Guildford Surrey GU2 8SG / GB | ||
Former [2011/24] | Parkinson, Neil Scott Ericsson Limited Patent Unit Optical Networks Unit 4 Midleton Gate Guildford Business Park Guildford Surrey GU2 8SG / GB | Application number, filing date | 08803641.3 | 04.09.2008 | [2011/24] | WO2008EP61671 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2010025767 | Date: | 11.03.2010 | Language: | EN | [2010/10] | Type: | A1 Application with search report | No.: | EP2332276 | Date: | 15.06.2011 | Language: | EN | The application published by WIPO in one of the EPO official languages on 11.03.2010 takes the place of the publication of the European patent application. | [2011/24] | Type: | B1 Patent specification | No.: | EP2332276 | Date: | 25.01.2012 | Language: | EN | [2012/04] | Search report(s) | International search report - published on: | EP | 11.03.2010 | Classification | IPC: | H04J14/00 | [2011/24] | CPC: |
H04B10/2587 (EP,US);
H04J14/0227 (EP,US);
H04J14/0246 (EP,US);
H04J14/0247 (EP,US);
H04J14/025 (EP,US);
H04J14/0282 (EP,US);
H04J2014/0253 (EP,US)
(-)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2011/24] | Title | German: | PASSIVE OPTISCHE NETZWERKE | [2011/24] | English: | PASSIVE OPTICAL NETWORKS | [2011/24] | French: | RÉSEAUX OPTIQUES PASSIFS | [2011/24] | Entry into regional phase | 17.02.2011 | National basic fee paid | 17.02.2011 | Designation fee(s) paid | 17.02.2011 | Examination fee paid | Examination procedure | 17.02.2011 | Examination requested [2011/24] | 20.05.2011 | Amendment by applicant (claims and/or description) | 22.08.2011 | Communication of intention to grant the patent | 09.12.2011 | Fee for grant paid | 09.12.2011 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 22.08.2011 | Opposition(s) | 26.10.2012 | No opposition filed within time limit [2013/01] | Fees paid | Renewal fee | 07.03.2011 | Renewal fee patent year 03 | 26.09.2011 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 04.09.2008 | CY | 25.01.2012 | CZ | 25.01.2012 | EE | 25.01.2012 | FI | 25.01.2012 | HR | 25.01.2012 | LT | 25.01.2012 | LV | 25.01.2012 | MT | 25.01.2012 | PL | 25.01.2012 | RO | 25.01.2012 | SI | 25.01.2012 | SK | 25.01.2012 | TR | 25.01.2012 | BG | 25.04.2012 | NO | 25.04.2012 | GR | 26.04.2012 | IS | 25.05.2012 | LU | 04.09.2012 | MC | 30.09.2012 | [2014/34] |
Former [2014/27] | CY | 25.01.2012 | |
CZ | 25.01.2012 | ||
EE | 25.01.2012 | ||
FI | 25.01.2012 | ||
HR | 25.01.2012 | ||
LT | 25.01.2012 | ||
LV | 25.01.2012 | ||
MT | 25.01.2012 | ||
PL | 25.01.2012 | ||
RO | 25.01.2012 | ||
SI | 25.01.2012 | ||
SK | 25.01.2012 | ||
TR | 25.01.2012 | ||
BG | 25.04.2012 | ||
NO | 25.04.2012 | ||
GR | 26.04.2012 | ||
IS | 25.05.2012 | ||
LU | 04.09.2012 | ||
MC | 30.09.2012 | ||
Former [2014/21] | CY | 25.01.2012 | |
CZ | 25.01.2012 | ||
EE | 25.01.2012 | ||
FI | 25.01.2012 | ||
HR | 25.01.2012 | ||
LT | 25.01.2012 | ||
LV | 25.01.2012 | ||
MT | 25.01.2012 | ||
PL | 25.01.2012 | ||
RO | 25.01.2012 | ||
SI | 25.01.2012 | ||
SK | 25.01.2012 | ||
TR | 25.01.2012 | ||
BG | 25.04.2012 | ||
NO | 25.04.2012 | ||
GR | 26.04.2012 | ||
IS | 25.05.2012 | ||
MC | 30.09.2012 | ||
Former [2013/51] | CY | 25.01.2012 | |
CZ | 25.01.2012 | ||
EE | 25.01.2012 | ||
FI | 25.01.2012 | ||
HR | 25.01.2012 | ||
LT | 25.01.2012 | ||
LV | 25.01.2012 | ||
MT | 25.01.2012 | ||
PL | 25.01.2012 | ||
RO | 25.01.2012 | ||
SI | 25.01.2012 | ||
SK | 25.01.2012 | ||
BG | 25.04.2012 | ||
NO | 25.04.2012 | ||
GR | 26.04.2012 | ||
IS | 25.05.2012 | ||
MC | 30.09.2012 | ||
Former [2013/20] | CY | 25.01.2012 | |
CZ | 25.01.2012 | ||
EE | 25.01.2012 | ||
FI | 25.01.2012 | ||
HR | 25.01.2012 | ||
LT | 25.01.2012 | ||
LV | 25.01.2012 | ||
PL | 25.01.2012 | ||
RO | 25.01.2012 | ||
SI | 25.01.2012 | ||
SK | 25.01.2012 | ||
BG | 25.04.2012 | ||
NO | 25.04.2012 | ||
GR | 26.04.2012 | ||
IS | 25.05.2012 | ||
MC | 30.09.2012 | ||
Former [2012/50] | CY | 25.01.2012 | |
CZ | 25.01.2012 | ||
EE | 25.01.2012 | ||
FI | 25.01.2012 | ||
HR | 25.01.2012 | ||
LT | 25.01.2012 | ||
LV | 25.01.2012 | ||
PL | 25.01.2012 | ||
RO | 25.01.2012 | ||
SI | 25.01.2012 | ||
SK | 25.01.2012 | ||
BG | 25.04.2012 | ||
NO | 25.04.2012 | ||
GR | 26.04.2012 | ||
IS | 25.05.2012 | ||
Former [2012/49] | CY | 25.01.2012 | |
CZ | 25.01.2012 | ||
EE | 25.01.2012 | ||
FI | 25.01.2012 | ||
HR | 25.01.2012 | ||
LT | 25.01.2012 | ||
LV | 25.01.2012 | ||
PL | 25.01.2012 | ||
RO | 25.01.2012 | ||
SI | 25.01.2012 | ||
BG | 25.04.2012 | ||
NO | 25.04.2012 | ||
GR | 26.04.2012 | ||
IS | 25.05.2012 | ||
Former [2012/48] | CY | 25.01.2012 | |
EE | 25.01.2012 | ||
FI | 25.01.2012 | ||
HR | 25.01.2012 | ||
LT | 25.01.2012 | ||
LV | 25.01.2012 | ||
PL | 25.01.2012 | ||
BG | 25.04.2012 | ||
NO | 25.04.2012 | ||
GR | 26.04.2012 | ||
IS | 25.05.2012 | ||
Former [2012/41] | CY | 25.01.2012 | |
FI | 25.01.2012 | ||
HR | 25.01.2012 | ||
LT | 25.01.2012 | ||
LV | 25.01.2012 | ||
PL | 25.01.2012 | ||
BG | 25.04.2012 | ||
NO | 25.04.2012 | ||
GR | 26.04.2012 | ||
IS | 25.05.2012 | ||
Former [2012/39] | FI | 25.01.2012 | |
HR | 25.01.2012 | ||
LT | 25.01.2012 | ||
LV | 25.01.2012 | ||
PL | 25.01.2012 | ||
BG | 25.04.2012 | ||
NO | 25.04.2012 | ||
GR | 26.04.2012 | ||
IS | 25.05.2012 | ||
Former [2012/37] | FI | 25.01.2012 | |
HR | 25.01.2012 | ||
LT | 25.01.2012 | ||
PL | 25.01.2012 | ||
BG | 25.04.2012 | ||
NO | 25.04.2012 | ||
GR | 26.04.2012 | ||
IS | 25.05.2012 | ||
Former [2012/36] | HR | 25.01.2012 | |
LT | 25.01.2012 | ||
BG | 25.04.2012 | ||
NO | 25.04.2012 | ||
GR | 26.04.2012 | ||
IS | 25.05.2012 | ||
Former [2012/35] | LT | 25.01.2012 | |
BG | 25.04.2012 | ||
NO | 25.04.2012 | ||
IS | 25.05.2012 | ||
Former [2012/34] | LT | 25.01.2012 | |
NO | 25.04.2012 | ||
IS | 25.05.2012 | Cited in | International search | [XA]WO2007108592 (KOREA ELECTRONICS TELECOMM [KR], et al) [X] 11-18 * abstract * * page 7, line 1 - page 8, line 2 * * figure 4 * * claims 9,13 * [A] 1-10,19-26; | [A]US2008187314 (CHUNG YUN CHUR [KR], et al) [A] 1-26 * abstract * * paragraphs [0010] - [0017] - [0042] - [0047] ** figure 7 *; | [XA] - CHOW C W ET AL, "Signal Remodulation with High Extinction Ratio 10-Gb/s DPSK signal for DWDM-PONs", OPTICAL FIBER COMMUNICATION/NATIONAL FIBER OPTIC ENGINEERS CONFERENCE, 2008. OFC/NFOEC 2008. CONFERENCE ON, IEEE, PISCATAWAY, NJ, USA, (20080224), ISBN 978-1-55752-856-8, pages 1 - 3, XP031257124 [X] 11-18 * paragraphs [0002] , [0004] * * figure 1 * [A] 1-10,19-26 | [XA] - HWAN S CHUNG ET AL, "Effects of inverse-RZ and Manchester code on a wavelength re-used WDM-PON", LASERS&ELECTRO-OPTICS SOCIETY, IEEE, IEEE, PI, (20061001), ISBN 978-0-7803-9556-5, pages 298 - 299, XP031004098 [X] 11-18 * paragraphs [000I] , [00IV] * * figure 1 * [A] 1-10,19-26 | [XA] - HWAN SEOK CHUNG ET AL, "Performance comparison between Manchester and inverse-RZ coding in a wavelength re-modulated WDM-PON", OPTICAL FIBER COMMUNICATION/NATIONAL FIBER OPTIC ENGINEERS CONFERENCE, 2008. OFC/NFOEC 2008. CONFERENCE ON, IEEE, PISCATAWAY, NJ, USA, (20080224), ISBN 978-1-55752-856-8, pages 1 - 3, XP031256719 [X] 11-18 * the whole document * [A] 1-10,19-26 |