EP2364571 - WIRELESS COMMUNICATION SYSTEM AND METHOD FOR ASSIGNING A CHANNEL IN SAID WIRELESS COMMUNICATION SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 28.06.2013 Database last updated on 15.06.2024 | Most recent event Tooltip | 18.07.2014 | Lapse of the patent in a contracting state New state(s): HU | published on 20.08.2014 [2014/34] | Applicant(s) | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | [N/P] |
Former [2011/37] | For all designated states Telefonaktiebolaget L M Ericsson (PUBL) 164 83 Stockholm / SE | Inventor(s) | 01 /
KRONESTEDT, Fredric Silverdalsvägen 33 SE-178 34 EKERO / SE | 02 /
HAGERMAN, Bo Hästhagsvägen 7 S-135 52 Tyresö / SE | 03 /
HILTUNEN, Kimmo Renbackavägen 2B 32 FI-02750 Esbo / FI | [2011/37] | Representative(s) | Kühn, Friedrich Heinrich Ericsson AB Patent Unit LTE Torshamnsgatan 23 164 80 Stockholm / SE | [N/P] |
Former [2011/37] | Kühn, Friedrich Heinrich Ericsson AB Patent Unit LTE Torshamnsgatan 23 164 80 Stockholm / SE | Application number, filing date | 08813612.2 | 02.10.2008 | WO2008SE51116 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2010039072 | Date: | 08.04.2010 | Language: | EN | [2010/14] | Type: | A1 Application with search report | No.: | EP2364571 | Date: | 14.09.2011 | Language: | EN | The application published by WIPO in one of the EPO official languages on 08.04.2010 takes the place of the publication of the European patent application. | [2011/37] | Type: | B1 Patent specification | No.: | EP2364571 | Date: | 22.08.2012 | Language: | EN | [2012/34] | Search report(s) | International search report - published on: | EP | 08.04.2010 | Classification | IPC: | H04W72/08 | [2011/37] | CPC: |
H04B7/0608 (EP,US);
H04W72/541 (EP,US);
H04B7/0805 (EP,US);
H04W36/0088 (EP,US);
H04W72/21 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2012/34] | Title | German: | DRAHTLOSES KOMMUNIKATIONSSYSTEM UND VERFAHREN ZUM VERGEBEN EINES KANALS IN DEM DRAHTLOSEN KOMMUNIKATIONSSYSTEM | [2011/37] | English: | WIRELESS COMMUNICATION SYSTEM AND METHOD FOR ASSIGNING A CHANNEL IN SAID WIRELESS COMMUNICATION SYSTEM | [2011/37] | French: | SYSTÈME DE COMMUNICATION SANS FIL ET PROCÉDÉ D'AFFECTATION D'UN CANAL DANS CELUI-CI | [2011/37] | Entry into regional phase | 21.02.2011 | National basic fee paid | 21.02.2011 | Designation fee(s) paid | 21.02.2011 | Examination fee paid | Examination procedure | 06.07.2010 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 21.02.2011 | Examination requested [2011/37] | 10.10.2011 | Amendment by applicant (claims and/or description) | 19.03.2012 | Communication of intention to grant the patent | 25.06.2012 | Fee for grant paid | 25.06.2012 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 19.03.2012 | Opposition(s) | 23.05.2013 | No opposition filed within time limit [2013/31] | Fees paid | Renewal fee | 29.03.2011 | Renewal fee patent year 03 | 25.10.2011 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 02.10.2008 | AT | 22.08.2012 | BE | 22.08.2012 | CY | 22.08.2012 | CZ | 22.08.2012 | DK | 22.08.2012 | EE | 22.08.2012 | FI | 22.08.2012 | HR | 22.08.2012 | IT | 22.08.2012 | LT | 22.08.2012 | LV | 22.08.2012 | MT | 22.08.2012 | PL | 22.08.2012 | RO | 22.08.2012 | SE | 22.08.2012 | SI | 22.08.2012 | SK | 22.08.2012 | TR | 22.08.2012 | IE | 02.10.2012 | LU | 02.10.2012 | CH | 31.10.2012 | FR | 31.10.2012 | LI | 31.10.2012 | MC | 31.10.2012 | BG | 22.11.2012 | NO | 22.11.2012 | GR | 23.11.2012 | ES | 03.12.2012 | IS | 22.12.2012 | PT | 24.12.2012 | [2014/34] |
Former [2014/27] | AT | 22.08.2012 | |
BE | 22.08.2012 | ||
CY | 22.08.2012 | ||
CZ | 22.08.2012 | ||
DK | 22.08.2012 | ||
EE | 22.08.2012 | ||
FI | 22.08.2012 | ||
HR | 22.08.2012 | ||
IT | 22.08.2012 | ||
LT | 22.08.2012 | ||
LV | 22.08.2012 | ||
MT | 22.08.2012 | ||
PL | 22.08.2012 | ||
RO | 22.08.2012 | ||
SE | 22.08.2012 | ||
SI | 22.08.2012 | ||
SK | 22.08.2012 | ||
TR | 22.08.2012 | ||
IE | 02.10.2012 | ||
LU | 02.10.2012 | ||
CH | 31.10.2012 | ||
FR | 31.10.2012 | ||
LI | 31.10.2012 | ||
MC | 31.10.2012 | ||
BG | 22.11.2012 | ||
NO | 22.11.2012 | ||
GR | 23.11.2012 | ||
ES | 03.12.2012 | ||
IS | 22.12.2012 | ||
PT | 24.12.2012 | ||
Former [2014/21] | AT | 22.08.2012 | |
BE | 22.08.2012 | ||
CY | 22.08.2012 | ||
CZ | 22.08.2012 | ||
DK | 22.08.2012 | ||
EE | 22.08.2012 | ||
FI | 22.08.2012 | ||
HR | 22.08.2012 | ||
IT | 22.08.2012 | ||
LT | 22.08.2012 | ||
LV | 22.08.2012 | ||
MT | 22.08.2012 | ||
PL | 22.08.2012 | ||
RO | 22.08.2012 | ||
SE | 22.08.2012 | ||
SI | 22.08.2012 | ||
SK | 22.08.2012 | ||
TR | 22.08.2012 | ||
IE | 02.10.2012 | ||
CH | 31.10.2012 | ||
FR | 31.10.2012 | ||
LI | 31.10.2012 | ||
MC | 31.10.2012 | ||
BG | 22.11.2012 | ||
NO | 22.11.2012 | ||
GR | 23.11.2012 | ||
ES | 03.12.2012 | ||
IS | 22.12.2012 | ||
PT | 24.12.2012 | ||
Former [2013/52] | AT | 22.08.2012 | |
BE | 22.08.2012 | ||
CY | 22.08.2012 | ||
CZ | 22.08.2012 | ||
DK | 22.08.2012 | ||
EE | 22.08.2012 | ||
FI | 22.08.2012 | ||
HR | 22.08.2012 | ||
IT | 22.08.2012 | ||
LT | 22.08.2012 | ||
LV | 22.08.2012 | ||
MT | 22.08.2012 | ||
PL | 22.08.2012 | ||
RO | 22.08.2012 | ||
SE | 22.08.2012 | ||
SI | 22.08.2012 | ||
SK | 22.08.2012 | ||
IE | 02.10.2012 | ||
CH | 31.10.2012 | ||
FR | 31.10.2012 | ||
LI | 31.10.2012 | ||
MC | 31.10.2012 | ||
BG | 22.11.2012 | ||
NO | 22.11.2012 | ||
GR | 23.11.2012 | ||
ES | 03.12.2012 | ||
IS | 22.12.2012 | ||
PT | 24.12.2012 | ||
Former [2013/51] | AT | 22.08.2012 | |
BE | 22.08.2012 | ||
CZ | 22.08.2012 | ||
DK | 22.08.2012 | ||
EE | 22.08.2012 | ||
FI | 22.08.2012 | ||
HR | 22.08.2012 | ||
IT | 22.08.2012 | ||
LT | 22.08.2012 | ||
LV | 22.08.2012 | ||
MT | 22.08.2012 | ||
PL | 22.08.2012 | ||
RO | 22.08.2012 | ||
SE | 22.08.2012 | ||
SI | 22.08.2012 | ||
SK | 22.08.2012 | ||
IE | 02.10.2012 | ||
CH | 31.10.2012 | ||
FR | 31.10.2012 | ||
LI | 31.10.2012 | ||
MC | 31.10.2012 | ||
BG | 22.11.2012 | ||
NO | 22.11.2012 | ||
GR | 23.11.2012 | ||
ES | 03.12.2012 | ||
IS | 22.12.2012 | ||
PT | 24.12.2012 | ||
Former [2013/46] | AT | 22.08.2012 | |
BE | 22.08.2012 | ||
CZ | 22.08.2012 | ||
DK | 22.08.2012 | ||
EE | 22.08.2012 | ||
FI | 22.08.2012 | ||
HR | 22.08.2012 | ||
IT | 22.08.2012 | ||
LT | 22.08.2012 | ||
LV | 22.08.2012 | ||
PL | 22.08.2012 | ||
RO | 22.08.2012 | ||
SE | 22.08.2012 | ||
SI | 22.08.2012 | ||
SK | 22.08.2012 | ||
IE | 02.10.2012 | ||
CH | 31.10.2012 | ||
FR | 31.10.2012 | ||
LI | 31.10.2012 | ||
MC | 31.10.2012 | ||
BG | 22.11.2012 | ||
NO | 22.11.2012 | ||
GR | 23.11.2012 | ||
ES | 03.12.2012 | ||
IS | 22.12.2012 | ||
PT | 24.12.2012 | ||
Former [2013/40] | AT | 22.08.2012 | |
BE | 22.08.2012 | ||
CZ | 22.08.2012 | ||
DK | 22.08.2012 | ||
EE | 22.08.2012 | ||
FI | 22.08.2012 | ||
HR | 22.08.2012 | ||
IT | 22.08.2012 | ||
LT | 22.08.2012 | ||
LV | 22.08.2012 | ||
PL | 22.08.2012 | ||
RO | 22.08.2012 | ||
SE | 22.08.2012 | ||
SI | 22.08.2012 | ||
SK | 22.08.2012 | ||
IE | 02.10.2012 | ||
CH | 31.10.2012 | ||
FR | 31.10.2012 | ||
LI | 31.10.2012 | ||
MC | 31.10.2012 | ||
BG | 22.11.2012 | ||
NO | 22.11.2012 | ||
GR | 23.11.2012 | ||
IS | 22.12.2012 | ||
PT | 24.12.2012 | ||
Former [2013/34] | AT | 22.08.2012 | |
BE | 22.08.2012 | ||
CZ | 22.08.2012 | ||
DK | 22.08.2012 | ||
EE | 22.08.2012 | ||
FI | 22.08.2012 | ||
HR | 22.08.2012 | ||
IT | 22.08.2012 | ||
LT | 22.08.2012 | ||
LV | 22.08.2012 | ||
PL | 22.08.2012 | ||
RO | 22.08.2012 | ||
SE | 22.08.2012 | ||
SI | 22.08.2012 | ||
SK | 22.08.2012 | ||
IE | 02.10.2012 | ||
CH | 31.10.2012 | ||
LI | 31.10.2012 | ||
MC | 31.10.2012 | ||
BG | 22.11.2012 | ||
NO | 22.11.2012 | ||
GR | 23.11.2012 | ||
IS | 22.12.2012 | ||
PT | 24.12.2012 | ||
Former [2013/33] | AT | 22.08.2012 | |
BE | 22.08.2012 | ||
CZ | 22.08.2012 | ||
DK | 22.08.2012 | ||
EE | 22.08.2012 | ||
FI | 22.08.2012 | ||
HR | 22.08.2012 | ||
IT | 22.08.2012 | ||
LT | 22.08.2012 | ||
LV | 22.08.2012 | ||
PL | 22.08.2012 | ||
RO | 22.08.2012 | ||
SE | 22.08.2012 | ||
SI | 22.08.2012 | ||
SK | 22.08.2012 | ||
IE | 02.10.2012 | ||
CH | 31.10.2012 | ||
LI | 31.10.2012 | ||
MC | 31.10.2012 | ||
NO | 22.11.2012 | ||
GR | 23.11.2012 | ||
IS | 22.12.2012 | ||
PT | 24.12.2012 | ||
Former [2013/24] | AT | 22.08.2012 | |
BE | 22.08.2012 | ||
CZ | 22.08.2012 | ||
DK | 22.08.2012 | ||
EE | 22.08.2012 | ||
FI | 22.08.2012 | ||
HR | 22.08.2012 | ||
IT | 22.08.2012 | ||
LT | 22.08.2012 | ||
LV | 22.08.2012 | ||
PL | 22.08.2012 | ||
RO | 22.08.2012 | ||
SE | 22.08.2012 | ||
SI | 22.08.2012 | ||
SK | 22.08.2012 | ||
MC | 31.10.2012 | ||
NO | 22.11.2012 | ||
GR | 23.11.2012 | ||
IS | 22.12.2012 | ||
PT | 24.12.2012 | ||
Former [2013/23] | AT | 22.08.2012 | |
BE | 22.08.2012 | ||
CZ | 22.08.2012 | ||
DK | 22.08.2012 | ||
EE | 22.08.2012 | ||
FI | 22.08.2012 | ||
HR | 22.08.2012 | ||
IT | 22.08.2012 | ||
LT | 22.08.2012 | ||
LV | 22.08.2012 | ||
PL | 22.08.2012 | ||
RO | 22.08.2012 | ||
SE | 22.08.2012 | ||
SI | 22.08.2012 | ||
SK | 22.08.2012 | ||
NO | 22.11.2012 | ||
GR | 23.11.2012 | ||
IS | 22.12.2012 | ||
PT | 24.12.2012 | ||
Former [2013/22] | AT | 22.08.2012 | |
BE | 22.08.2012 | ||
CZ | 22.08.2012 | ||
DK | 22.08.2012 | ||
EE | 22.08.2012 | ||
FI | 22.08.2012 | ||
HR | 22.08.2012 | ||
LT | 22.08.2012 | ||
LV | 22.08.2012 | ||
SE | 22.08.2012 | ||
SI | 22.08.2012 | ||
NO | 22.11.2012 | ||
GR | 23.11.2012 | ||
IS | 22.12.2012 | ||
PT | 24.12.2012 | ||
Former [2013/21] | AT | 22.08.2012 | |
BE | 22.08.2012 | ||
DK | 22.08.2012 | ||
FI | 22.08.2012 | ||
HR | 22.08.2012 | ||
LT | 22.08.2012 | ||
LV | 22.08.2012 | ||
SE | 22.08.2012 | ||
SI | 22.08.2012 | ||
NO | 22.11.2012 | ||
GR | 23.11.2012 | ||
IS | 22.12.2012 | ||
PT | 24.12.2012 | ||
Former [2013/13] | AT | 22.08.2012 | |
BE | 22.08.2012 | ||
FI | 22.08.2012 | ||
HR | 22.08.2012 | ||
LT | 22.08.2012 | ||
LV | 22.08.2012 | ||
SE | 22.08.2012 | ||
SI | 22.08.2012 | ||
NO | 22.11.2012 | ||
GR | 23.11.2012 | ||
IS | 22.12.2012 | ||
PT | 24.12.2012 | ||
Former [2013/12] | AT | 22.08.2012 | |
BE | 22.08.2012 | ||
FI | 22.08.2012 | ||
HR | 22.08.2012 | ||
LT | 22.08.2012 | ||
LV | 22.08.2012 | ||
SE | 22.08.2012 | ||
SI | 22.08.2012 | ||
NO | 22.11.2012 | ||
GR | 23.11.2012 | ||
IS | 22.12.2012 | ||
Former [2013/11] | AT | 22.08.2012 | |
FI | 22.08.2012 | ||
HR | 22.08.2012 | ||
LT | 22.08.2012 | ||
LV | 22.08.2012 | ||
SI | 22.08.2012 | ||
NO | 22.11.2012 | ||
GR | 23.11.2012 | ||
IS | 22.12.2012 | ||
Former [2013/10] | AT | 22.08.2012 | |
FI | 22.08.2012 | ||
HR | 22.08.2012 | ||
LT | 22.08.2012 | ||
NO | 22.11.2012 | ||
IS | 22.12.2012 | ||
Former [2013/09] | AT | 22.08.2012 | |
FI | 22.08.2012 | ||
LT | 22.08.2012 | ||
NO | 22.11.2012 | ||
Former [2013/08] | AT | 22.08.2012 | |
LT | 22.08.2012 | ||
NO | 22.11.2012 | ||
Former [2013/07] | AT | 22.08.2012 | Cited in | International search | [XY] - ERICSSON, "A discussion on some technology components for LTE-Advanced", 3GPP DRAFT; R1-082024 {LTE-ADVANCED TECHNOLOGY COMPONENTS}, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20080430), vol. RAN WG1, no. Kansas City, USA; 20080505, XP050110365 [X] 1 * paragraph [0001] * * paragraph [02.3] - paragraph [02.4] * [Y] 2-10,12-18 | [Y] - LIN DAI, SHIDONG ZHOU, YAN YAO, "Capacity Analysis in CDMA Distributed Antenna Systems", IEEE TRANSACTIONS ON WIRELESS COMMUNICATIONS, (200511), vol. 4, no. 6, pages 2613 - 2620, XP002538153 [Y] 2-10,12-18 * paragraph [00II] * * paragraph [00IV] * DOI: http://dx.doi.org/10.1109/TWC.2005.858011 | [X] - "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Physical channels and mapping of transport channels onto physical channels (FDD) (Release 8)", 3GPP TS 25.211 V.8.2.0, (20080924), pages 1 - 56, XP002538154 [X] 11 * paragraph [5.3.3.1] - paragraph [5.3.3.2] * |