EP2207758 - PIEZOCERAMIC MULTI-LAYER ELEMENT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.07.2018 Database last updated on 12.07.2024 | |
Former | The patent has been granted Status updated on 28.07.2017 | ||
Former | Grant of patent is intended Status updated on 06.04.2017 | Most recent event Tooltip | 29.05.2020 | Lapse of the patent in a contracting state New state(s): PT | published on 01.07.2020 [2020/27] | Applicant(s) | For all designated states CeramTec GmbH CeramTec-Platz 1-9 73207 Plochingen / DE | [2010/48] |
Former [2010/29] | For all designated states CeramTec AG Fabrikstrasse 23-29 73207 Plochingen / DE | Inventor(s) | 01 /
BINDIG, Reiner Rosenstrasse 20 95463 Bindlach / DE | 02 /
SCHREINER, Hans-Jürgen Angerstrasse 13 91233 Neunkirchen am Sand-rollhofen / DE | [2010/29] | Representative(s) | Fehrenbacher, Eckhard Anton, et al CeramTec GmbH CeramTec-Platz 1-9 73207 Plochingen / DE | [N/P] |
Former [2010/48] | Uppena, Franz, et al Patente, Marken & Lizenzen c/o Chemetall GmbH Trakehner Straße 3 60487 Frankfurt am Main / DE | ||
Former [2010/29] | Uppena, Franz, et al Chemetall GmbH Patente, Marken & Lizenzen Trakehner Strasse 3 60487 Frankfurt/Main / DE | Application number, filing date | 08839622.1 | 20.10.2008 | [2010/29] | WO2008EP64123 | Priority number, date | DE20071000523 | 18.10.2007 Original published format: DE102007000523 | [2010/29] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2009050299 | Date: | 23.04.2009 | Language: | DE | [2009/17] | Type: | A1 Application with search report | No.: | EP2207758 | Date: | 21.07.2010 | Language: | DE | The application published by WIPO in one of the EPO official languages on 23.04.2009 takes the place of the publication of the European patent application. | [2010/29] | Type: | B1 Patent specification | No.: | EP2207758 | Date: | 30.08.2017 | Language: | DE | [2017/35] | Search report(s) | International search report - published on: | EP | 23.04.2009 | Classification | IPC: | C04B35/491, H01L41/187, H01L41/273, H01L41/43, H01L41/047 | [2017/16] | CPC: |
C04B35/491 (EP,US);
C04B35/462 (US);
C04B35/468 (US);
C04B35/475 (US);
C04B35/6303 (US);
C04B37/001 (US);
C04B37/006 (US);
H10N30/053 (EP,US);
H10N30/097 (EP,US);
H10N30/8554 (EP,US);
H10N30/871 (EP,US);
H10N30/877 (EP,US);
C04B2235/3201 (EP,US);
C04B2235/3213 (EP,US);
C04B2235/3251 (EP,US);
C04B2235/3255 (EP,US);
C04B2235/3272 (EP,US);
C04B2235/447 (EP,US);
C04B2235/5445 (EP,US);
C04B2235/6025 (EP,US);
C04B2235/72 (EP,US);
|
Former IPC [2010/29] | C04B35/491, H01L41/187 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2017/35] |
Former [2010/29] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | PIEZOKERAMISCHES VIELSCHICHTELEMENT | [2010/29] | English: | PIEZOCERAMIC MULTI-LAYER ELEMENT | [2010/29] | French: | ÉLÉMENT MULTICOUCHE PIÉZOCÉRAMIQUE | [2010/29] | Entry into regional phase | 18.05.2010 | National basic fee paid | 18.05.2010 | Designation fee(s) paid | 18.05.2010 | Examination fee paid | Examination procedure | 18.05.2010 | Examination requested [2010/29] | 02.08.2010 | Amendment by applicant (claims and/or description) | 04.08.2011 | Despatch of a communication from the examining division (Time limit: M06) | 09.05.2012 | Reply to a communication from the examining division | 19.12.2012 | Despatch of a communication from the examining division (Time limit: M04) | 05.06.2013 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time | 19.07.2013 | Reply to a communication from the examining division | 19.12.2013 | Despatch of a communication from the examining division (Time limit: M06) | 25.06.2014 | Reply to a communication from the examining division | 12.03.2015 | Despatch of a communication from the examining division (Time limit: M06) | 27.08.2015 | Reply to a communication from the examining division | 04.02.2016 | Despatch of a communication from the examining division (Time limit: M04) | 03.06.2016 | Reply to a communication from the examining division | 13.03.2017 | Cancellation of oral proceeding that was planned for 05.04.2017 | 05.04.2017 | Date of oral proceedings (cancelled) | 07.04.2017 | Communication of intention to grant the patent | 17.07.2017 | Fee for grant paid | 17.07.2017 | Fee for publishing/printing paid | 17.07.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 04.08.2011 | Opposition(s) | 31.05.2018 | No opposition filed within time limit [2018/32] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the examination report | 19.07.2013 | Request for further processing filed | 19.07.2013 | Full payment received (date of receipt of payment) Request granted | 30.07.2013 | Decision despatched | The application is deemed to be withdrawn due to failure to reply to the examination report | 09.05.2012 | Request for further processing filed | 09.05.2012 | Full payment received (date of receipt of payment) Request granted | 22.05.2012 | Decision despatched | Fees paid | Renewal fee | 02.11.2010 | Renewal fee patent year 03 | 31.10.2011 | Renewal fee patent year 04 | 31.10.2012 | Renewal fee patent year 05 | 31.10.2013 | Renewal fee patent year 06 | 31.10.2014 | Renewal fee patent year 07 | 02.11.2015 | Renewal fee patent year 08 | 31.10.2016 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.10.2008 | CY | 30.08.2017 | DK | 30.08.2017 | EE | 30.08.2017 | ES | 30.08.2017 | FI | 30.08.2017 | HR | 30.08.2017 | IT | 30.08.2017 | LT | 30.08.2017 | LV | 30.08.2017 | MC | 30.08.2017 | MT | 30.08.2017 | NL | 30.08.2017 | PL | 30.08.2017 | PT | 30.08.2017 | RO | 30.08.2017 | SE | 30.08.2017 | SK | 30.08.2017 | TR | 30.08.2017 | IE | 20.10.2017 | LU | 20.10.2017 | BE | 31.10.2017 | CH | 31.10.2017 | FR | 31.10.2017 | LI | 31.10.2017 | BG | 30.11.2017 | GB | 30.11.2017 | NO | 30.11.2017 | GR | 01.12.2017 | IS | 30.12.2017 | [2020/27] |
Former [2020/16] | HU | 20.10.2008 | |
CY | 30.08.2017 | ||
DK | 30.08.2017 | ||
EE | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
IT | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
MC | 30.08.2017 | ||
MT | 30.08.2017 | ||
NL | 30.08.2017 | ||
PL | 30.08.2017 | ||
RO | 30.08.2017 | ||
SE | 30.08.2017 | ||
SK | 30.08.2017 | ||
TR | 30.08.2017 | ||
IE | 20.10.2017 | ||
LU | 20.10.2017 | ||
BE | 31.10.2017 | ||
CH | 31.10.2017 | ||
FR | 31.10.2017 | ||
LI | 31.10.2017 | ||
BG | 30.11.2017 | ||
GB | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
Former [2019/46] | HU | 20.10.2008 | |
CY | 30.08.2017 | ||
DK | 30.08.2017 | ||
EE | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
IT | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
MC | 30.08.2017 | ||
MT | 30.08.2017 | ||
NL | 30.08.2017 | ||
PL | 30.08.2017 | ||
RO | 30.08.2017 | ||
SE | 30.08.2017 | ||
SK | 30.08.2017 | ||
IE | 20.10.2017 | ||
LU | 20.10.2017 | ||
BE | 31.10.2017 | ||
CH | 31.10.2017 | ||
FR | 31.10.2017 | ||
LI | 31.10.2017 | ||
BG | 30.11.2017 | ||
GB | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
Former [2019/31] | HU | 20.10.2008 | |
DK | 30.08.2017 | ||
EE | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
IT | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
MC | 30.08.2017 | ||
MT | 30.08.2017 | ||
NL | 30.08.2017 | ||
PL | 30.08.2017 | ||
RO | 30.08.2017 | ||
SE | 30.08.2017 | ||
SK | 30.08.2017 | ||
IE | 20.10.2017 | ||
LU | 20.10.2017 | ||
BE | 31.10.2017 | ||
CH | 31.10.2017 | ||
FR | 31.10.2017 | ||
LI | 31.10.2017 | ||
BG | 30.11.2017 | ||
GB | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
Former [2018/50] | DK | 30.08.2017 | |
EE | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
IT | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
MC | 30.08.2017 | ||
MT | 30.08.2017 | ||
NL | 30.08.2017 | ||
PL | 30.08.2017 | ||
RO | 30.08.2017 | ||
SE | 30.08.2017 | ||
SK | 30.08.2017 | ||
IE | 20.10.2017 | ||
LU | 20.10.2017 | ||
BE | 31.10.2017 | ||
CH | 31.10.2017 | ||
FR | 31.10.2017 | ||
LI | 31.10.2017 | ||
BG | 30.11.2017 | ||
GB | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
Former [2018/45] | DK | 30.08.2017 | |
EE | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
IT | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
MC | 30.08.2017 | ||
MT | 30.08.2017 | ||
NL | 30.08.2017 | ||
PL | 30.08.2017 | ||
RO | 30.08.2017 | ||
SE | 30.08.2017 | ||
SK | 30.08.2017 | ||
IE | 20.10.2017 | ||
LU | 20.10.2017 | ||
BE | 31.10.2017 | ||
CH | 31.10.2017 | ||
FR | 31.10.2017 | ||
LI | 31.10.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
Former [2018/43] | DK | 30.08.2017 | |
EE | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
IT | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
MC | 30.08.2017 | ||
MT | 30.08.2017 | ||
NL | 30.08.2017 | ||
PL | 30.08.2017 | ||
RO | 30.08.2017 | ||
SE | 30.08.2017 | ||
SK | 30.08.2017 | ||
LU | 20.10.2017 | ||
BE | 31.10.2017 | ||
CH | 31.10.2017 | ||
FR | 31.10.2017 | ||
LI | 31.10.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
Former [2018/39] | DK | 30.08.2017 | |
EE | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
IT | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
MC | 30.08.2017 | ||
NL | 30.08.2017 | ||
PL | 30.08.2017 | ||
RO | 30.08.2017 | ||
SE | 30.08.2017 | ||
SK | 30.08.2017 | ||
LU | 20.10.2017 | ||
BE | 31.10.2017 | ||
CH | 31.10.2017 | ||
FR | 31.10.2017 | ||
LI | 31.10.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
Former [2018/36] | DK | 30.08.2017 | |
EE | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
IT | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
MC | 30.08.2017 | ||
NL | 30.08.2017 | ||
PL | 30.08.2017 | ||
RO | 30.08.2017 | ||
SE | 30.08.2017 | ||
SK | 30.08.2017 | ||
LU | 20.10.2017 | ||
BE | 31.10.2017 | ||
CH | 31.10.2017 | ||
LI | 31.10.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
Former [2018/35] | DK | 30.08.2017 | |
EE | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
IT | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
MC | 30.08.2017 | ||
NL | 30.08.2017 | ||
PL | 30.08.2017 | ||
RO | 30.08.2017 | ||
SE | 30.08.2017 | ||
SK | 30.08.2017 | ||
LU | 20.10.2017 | ||
CH | 31.10.2017 | ||
LI | 31.10.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
Former [2018/26] | DK | 30.08.2017 | |
EE | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
IT | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
MC | 30.08.2017 | ||
NL | 30.08.2017 | ||
PL | 30.08.2017 | ||
RO | 30.08.2017 | ||
SE | 30.08.2017 | ||
SK | 30.08.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
Former [2018/25] | DK | 30.08.2017 | |
EE | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
IT | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
NL | 30.08.2017 | ||
PL | 30.08.2017 | ||
RO | 30.08.2017 | ||
SE | 30.08.2017 | ||
SK | 30.08.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
Former [2018/23] | DK | 30.08.2017 | |
EE | 30.08.2017 | ||
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
NL | 30.08.2017 | ||
PL | 30.08.2017 | ||
RO | 30.08.2017 | ||
SE | 30.08.2017 | ||
SK | 30.08.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
Former [2018/21] | DK | 30.08.2017 | |
ES | 30.08.2017 | ||
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
NL | 30.08.2017 | ||
SE | 30.08.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
Former [2018/15] | ES | 30.08.2017 | |
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
NL | 30.08.2017 | ||
SE | 30.08.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
Former [2018/12] | ES | 30.08.2017 | |
FI | 30.08.2017 | ||
HR | 30.08.2017 | ||
LT | 30.08.2017 | ||
LV | 30.08.2017 | ||
SE | 30.08.2017 | ||
BG | 30.11.2017 | ||
NO | 30.11.2017 | ||
GR | 01.12.2017 | ||
IS | 30.12.2017 | ||
Former [2018/10] | FI | 30.08.2017 | |
HR | 30.08.2017 | ||
LT | 30.08.2017 | ||
SE | 30.08.2017 | ||
NO | 30.11.2017 | ||
Former [2018/09] | FI | 30.08.2017 | |
LT | 30.08.2017 | ||
SE | 30.08.2017 | ||
NO | 30.11.2017 | ||
Former [2018/08] | FI | 30.08.2017 | |
LT | 30.08.2017 | ||
NO | 30.11.2017 | ||
Former [2018/07] | LT | 30.08.2017 | |
NO | 30.11.2017 | Cited in | International search | [X]US5792379 (DAI XUNHU [US], et al) [X] 1-20 * abstract *; | [X]EP1124265 (BOSCH GMBH ROBERT [DE]) [X] 23-28* paragraphs [0008] , [0021]; example Ausführungsbeispiel *; | [X]US2004012000 (PONOMAREV YOURI [KR], et al) [X] 1-22 * page 4, paragraph 36; example 2; claim 1 *; | [X]US6808649 (KIM YOUNG MIN [KR]) [X] 1-22 * page 8; example 2; claims 3,4 *; | [X]DE102004031307 (BOSCH GMBH ROBERT [DE]) [X] 1-20 * paragraph [0020]; claims 1,4,5 * | Examination | DE19840488 | JP2004137106 | JP2004161519 | JP2006108546 | DE102006039858 | - TEXIER N ET AL, "Powder process influence on the characteristics of Mn,W,Sb,Ni-doped PZT", JOURNAL OF THE EUROPEAN CERAMIC SOCIETY, ELSEVIER SCIENCE PUBLISHERS, BARKING, ESSEX, GB, vol. 21, no. 10-11, ISSN 0955-2219, (20010101), pages 1499 - 1502, (20010101), XP027557192 |