EP2215529 - METHOD AND DEVICE FOR PRODUCING HOLOGRAMS HAVING AN INDIVIDUALLY EXPOSED WATERMARK-TYPE STRUCTURE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 17.03.2023 Database last updated on 06.07.2024 | |
Former | The patent has been granted Status updated on 08.04.2022 | ||
Former | Grant of patent is intended Status updated on 16.12.2021 | ||
Former | Examination is in progress Status updated on 12.11.2021 | ||
Former | Grant of patent is intended Status updated on 14.07.2021 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Bundesdruckerei GmbH Oranienstrasse 91 10969 Berlin / DE | [2010/32] | Inventor(s) | 01 /
LEOPOLD, André Angermünder Strasse 11 10119 Berlin / DE | 02 /
EHREKE, Jens Peter-Hille-Strasse 107 12587 Berlin / DE | [2010/32] | Representative(s) | Patentanwälte Bressel und Partner mbB Potsdamer Platz 10 10785 Berlin / DE | [2022/19] |
Former [2010/32] | Bressel, Burkhard Bressel und Partner Patentanwälte Park Kolonnaden Potsdamer Platz 10 10785 Berlin / DE | Application number, filing date | 08845306.3 | 31.10.2008 | [2010/32] | WO2008EP09348 | Priority number, date | DE20071052952 | 31.10.2007 Original published format: DE102007052952 | DE20071063504 | 28.12.2007 Original published format: DE102007063504 | [2010/32] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2009056358 | Date: | 07.05.2009 | Language: | DE | [2009/19] | Type: | A1 Application with search report | No.: | EP2215529 | Date: | 11.08.2010 | Language: | DE | The application published by WIPO in one of the EPO official languages on 07.05.2009 takes the place of the publication of the European patent application. | [2010/32] | Type: | B1 Patent specification | No.: | EP2215529 | Date: | 11.05.2022 | Language: | DE | [2022/19] | Search report(s) | International search report - published on: | EP | 07.05.2009 | Classification | IPC: | G03H1/20, B42D25/328 | [2021/32] | CPC: |
G03H1/202 (EP);
G03H1/0011 (EP);
G03H1/0236 (EP);
G03H1/22 (EP);
G07D7/0032 (EP);
B42D25/328 (EP);
G03H1/0256 (EP);
G03H1/265 (EP);
G03H2001/0016 (EP);
G03H2001/205 (EP);
G03H2001/2223 (EP);
G03H2001/2244 (EP);
G03H2210/11 (EP);
G03H2210/54 (EP);
G03H2222/24 (EP);
G03H2223/12 (EP);
G03H2225/11 (EP);
G03H2225/12 (EP);
G03H2225/31 (EP)
(-)
|
Former IPC [2010/32] | G03H1/20, B42D15/10 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2022/19] |
Former [2010/32] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | VERFAHREN UND VORRICHTUNG ZUR HERSTELLUNG VON HOLOGRAMMEN MIT INDIVIDUELL BELICHTETER WASSERZEICHENARTIGER STRUKTUR | [2010/32] | English: | METHOD AND DEVICE FOR PRODUCING HOLOGRAMS HAVING AN INDIVIDUALLY EXPOSED WATERMARK-TYPE STRUCTURE | [2010/32] | French: | PROCÉDÉ ET DISPOSITIF DE PRODUCTION D'HOLOGRAMMES PRÉSENTANT UNE STRUCTURE DE TYPE FILIGRANE EXPOSÉE INDIVIDUELLEMENT | [2010/32] | Entry into regional phase | 20.05.2010 | National basic fee paid | 20.05.2010 | Designation fee(s) paid | 20.05.2010 | Examination fee paid | Examination procedure | 31.08.2009 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 20.05.2010 | Amendment by applicant (claims and/or description) | 20.05.2010 | Examination requested [2010/32] | 16.12.2014 | Despatch of a communication from the examining division (Time limit: M04) | 27.04.2015 | Reply to a communication from the examining division | 13.06.2016 | Despatch of communication that the application is refused, reason: substantive examination {1} | 15.07.2021 | Communication of intention to grant the patent | 10.11.2021 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 17.12.2021 | Communication of intention to grant the patent | 30.03.2022 | Fee for grant paid | 30.03.2022 | Fee for publishing/printing paid | 30.03.2022 | Receipt of the translation of the claim(s) | Appeal following examination | 11.08.2016 | Appeal received No. T2446/16 | 18.10.2016 | Statement of grounds filed | 25.02.2021 | Result of appeal procedure: remittal for grant | 12.05.2021 | Despatch of the decision of the Board of Appeal | 25.02.2021 | Date of oral proceedings | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 16.12.2014 | Opposition(s) | 14.02.2023 | No opposition filed within time limit [2023/16] | Fees paid | Renewal fee | 28.10.2010 | Renewal fee patent year 03 | 27.10.2011 | Renewal fee patent year 04 | 30.10.2012 | Renewal fee patent year 05 | 30.10.2013 | Renewal fee patent year 06 | 30.10.2014 | Renewal fee patent year 07 | 29.10.2015 | Renewal fee patent year 08 | 27.10.2016 | Renewal fee patent year 09 | 26.10.2017 | Renewal fee patent year 10 | 30.10.2018 | Renewal fee patent year 11 | 22.10.2019 | Renewal fee patent year 12 | 22.10.2020 | Renewal fee patent year 13 | 21.10.2021 | Renewal fee patent year 14 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 31.10.2008 | CY | 11.05.2022 | CZ | 11.05.2022 | DK | 11.05.2022 | EE | 11.05.2022 | ES | 11.05.2022 | FI | 11.05.2022 | HR | 11.05.2022 | IT | 11.05.2022 | LT | 11.05.2022 | LV | 11.05.2022 | MC | 11.05.2022 | NL | 11.05.2022 | PL | 11.05.2022 | RO | 11.05.2022 | SE | 11.05.2022 | SI | 11.05.2022 | SK | 11.05.2022 | TR | 11.05.2022 | BG | 11.08.2022 | NO | 11.08.2022 | GR | 12.08.2022 | IS | 11.09.2022 | PT | 12.09.2022 | AT | 31.10.2022 | BE | 31.10.2022 | CH | 31.10.2022 | IE | 31.10.2022 | LI | 31.10.2022 | LU | 31.10.2022 | [2024/29] |
Former [2024/21] | HU | 31.10.2008 | |
CY | 11.05.2022 | ||
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
IT | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
AT | 31.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
IE | 31.10.2022 | ||
LI | 31.10.2022 | ||
LU | 31.10.2022 | ||
Former [2024/18] | HU | 31.10.2008 | |
CZ | 11.05.2022 | ||
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
IT | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
AT | 31.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
IE | 31.10.2022 | ||
LI | 31.10.2022 | ||
LU | 31.10.2022 | ||
Former [2024/11] | CZ | 11.05.2022 | |
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
IT | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
AT | 31.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
IE | 31.10.2022 | ||
LI | 31.10.2022 | ||
LU | 31.10.2022 | ||
Former [2024/09] | CZ | 11.05.2022 | |
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
AT | 31.10.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
IE | 31.10.2022 | ||
LI | 31.10.2022 | ||
LU | 31.10.2022 | ||
Former [2023/48] | CZ | 11.05.2022 | |
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
IE | 31.10.2022 | ||
LI | 31.10.2022 | ||
LU | 31.10.2022 | ||
Former [2023/42] | CZ | 11.05.2022 | |
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
BE | 31.10.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
LU | 31.10.2022 | ||
Former [2023/35] | CZ | 11.05.2022 | |
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
CH | 31.10.2022 | ||
LI | 31.10.2022 | ||
LU | 31.10.2022 | ||
Former [2023/30] | CZ | 11.05.2022 | |
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
LU | 31.10.2022 | ||
Former [2023/25] | CZ | 11.05.2022 | |
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
MC | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
SE | 11.05.2022 | ||
SI | 11.05.2022 | ||
SK | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2023/09] | CZ | 11.05.2022 | |
DK | 11.05.2022 | ||
EE | 11.05.2022 | ||
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
RO | 11.05.2022 | ||
SE | 11.05.2022 | ||
SK | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2023/07] | DK | 11.05.2022 | |
ES | 11.05.2022 | ||
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
SE | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2022/51] | ES | 11.05.2022 | |
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
SE | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
IS | 11.09.2022 | ||
PT | 12.09.2022 | ||
Former [2022/50] | ES | 11.05.2022 | |
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
NL | 11.05.2022 | ||
PL | 11.05.2022 | ||
SE | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
PT | 12.09.2022 | ||
Former [2022/49] | ES | 11.05.2022 | |
FI | 11.05.2022 | ||
HR | 11.05.2022 | ||
LT | 11.05.2022 | ||
LV | 11.05.2022 | ||
NL | 11.05.2022 | ||
SE | 11.05.2022 | ||
BG | 11.08.2022 | ||
NO | 11.08.2022 | ||
GR | 12.08.2022 | ||
PT | 12.09.2022 | ||
Former [2022/48] | ES | 11.05.2022 | |
FI | 11.05.2022 | ||
LT | 11.05.2022 | ||
NL | 11.05.2022 | ||
SE | 11.05.2022 | ||
NO | 11.08.2022 | ||
PT | 12.09.2022 | ||
Former [2022/47] | ES | 11.05.2022 | |
FI | 11.05.2022 | ||
LT | 11.05.2022 | ||
SE | 11.05.2022 | ||
NO | 11.08.2022 | ||
PT | 12.09.2022 | Cited in | International search | [XYI]JPH08123307 (TOPPAN PRINTING CO LTD) [X] 1-5,13-17,25-29 * paragraph [0007] - paragraph [0016]; figures 1-5 * [Y] 9,21,33 [I] 6-8,10-12,18-20,22-24,30-32,34,35; | [XYI]US2006289114 (GUIONNET SEBASTIEN [FR], et al) [X] 1,10,11,13,22,23,25,34,35 * paragraphs [0013] , [0020]; figure 1 * [Y] 9,21,33 [I] 2-8,12,14-20,24,26-32; | [Y] - SCHILLING A ET AL, "Achromatic features for optically variable devices", PROCEEDINGS OF THE SPIE - THE INTERNATIONAL SOCIETY FOR OPTICAL ENGINEERING SPIE-INT. SOC. OPT. ENG USA, (2002), vol. 4677, ISSN 0277-786X, pages 238 - 246, XP002515545 [Y] 9,21,33 * Abschnitte 2.1 und 22 mit;; figures 4,6,7,9,10 * DOI: http://dx.doi.org/10.1117/12.462715 |