EP2229584 - PROBE AND DEVICE FOR OPTICALLY TESTING MEASURED OBJECTS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 08.03.2019 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 30.03.2018 | ||
Former | Grant of patent is intended Status updated on 31.01.2018 | ||
Former | Examination is in progress Status updated on 09.01.2018 | Most recent event Tooltip | 10.07.2020 | Lapse of the patent in a contracting state New state(s): CY, IS | published on 12.08.2020 [2020/33] | Applicant(s) | For all designated states Robert Bosch GmbH Postfach 30 02 20 70442 Stuttgart / DE | [2010/38] | Inventor(s) | 01 /
GNAUSCH, Tobias Azenbergstr. 55 70192 Stuttgart / DE | [2010/38] | Application number, filing date | 08860697.5 | 28.11.2008 | [2010/38] | WO2008EP66404 | Priority number, date | DE20071059903 | 12.12.2007 Original published format: DE102007059903 | [2010/38] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2009074462 | Date: | 18.06.2009 | Language: | DE | [2009/25] | Type: | A1 Application with search report | No.: | EP2229584 | Date: | 22.09.2010 | Language: | DE | The application published by WIPO in one of the EPO official languages on 18.06.2009 takes the place of the publication of the European patent application. | [2010/38] | Type: | B1 Patent specification | No.: | EP2229584 | Date: | 02.05.2018 | Language: | DE | [2018/18] | Search report(s) | International search report - published on: | EP | 18.06.2009 | Classification | IPC: | G01N21/954, G01B11/24, G01B9/02 | [2018/02] | CPC: |
G01N21/954 (EP,US);
G01B11/24 (EP,US);
G01B9/02028 (EP,US);
G01B9/0205 (EP,US);
G01N2021/9542 (EP,US);
G01N2021/9548 (EP,US)
|
Former IPC [2010/38] | G01N21/95, G01B9/02, G02B23/26 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2018/18] |
Former [2010/38] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | SONDE UND VORRICHTUNG ZUM OPTISCHEN PRÜFEN VON MESSOBJEKTEN | [2010/38] | English: | PROBE AND DEVICE FOR OPTICALLY TESTING MEASURED OBJECTS | [2010/38] | French: | SONDE ET DISPOSITIF POUR LA VÉRIFICATION OPTIQUE D'OBJETS À MESURER | [2010/38] | Entry into regional phase | 12.07.2010 | National basic fee paid | 12.07.2010 | Designation fee(s) paid | 12.07.2010 | Examination fee paid | Examination procedure | 12.07.2010 | Examination requested [2010/38] | 25.08.2010 | Amendment by applicant (claims and/or description) | 25.06.2015 | Despatch of a communication from the examining division (Time limit: M04) | 16.09.2015 | Reply to a communication from the examining division | 01.02.2018 | Communication of intention to grant the patent | 22.03.2018 | Fee for grant paid | 22.03.2018 | Fee for publishing/printing paid | 22.03.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 25.06.2015 | Opposition(s) | 05.02.2019 | No opposition filed within time limit [2019/15] | Fees paid | Renewal fee | 30.11.2010 | Renewal fee patent year 03 | 30.11.2011 | Renewal fee patent year 04 | 30.11.2012 | Renewal fee patent year 05 | 02.12.2013 | Renewal fee patent year 06 | 01.12.2014 | Renewal fee patent year 07 | 30.11.2015 | Renewal fee patent year 08 | 30.11.2016 | Renewal fee patent year 09 | 30.11.2017 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.11.2008 | CY | 02.05.2018 | CZ | 02.05.2018 | DK | 02.05.2018 | EE | 02.05.2018 | ES | 02.05.2018 | FI | 02.05.2018 | HR | 02.05.2018 | IT | 02.05.2018 | LT | 02.05.2018 | LV | 02.05.2018 | MC | 02.05.2018 | MT | 02.05.2018 | NL | 02.05.2018 | PL | 02.05.2018 | RO | 02.05.2018 | SE | 02.05.2018 | SI | 02.05.2018 | SK | 02.05.2018 | TR | 02.05.2018 | BG | 02.08.2018 | NO | 02.08.2018 | GR | 03.08.2018 | IS | 02.09.2018 | PT | 03.09.2018 | AT | 28.11.2018 | GB | 28.11.2018 | IE | 28.11.2018 | LU | 28.11.2018 | BE | 30.11.2018 | CH | 30.11.2018 | FR | 30.11.2018 | LI | 30.11.2018 | [2020/32] |
Former [2020/30] | HU | 28.11.2008 | |
CZ | 02.05.2018 | ||
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
MC | 02.05.2018 | ||
MT | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SI | 02.05.2018 | ||
SK | 02.05.2018 | ||
TR | 02.05.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
AT | 28.11.2018 | ||
GB | 28.11.2018 | ||
IE | 28.11.2018 | ||
LU | 28.11.2018 | ||
BE | 30.11.2018 | ||
CH | 30.11.2018 | ||
FR | 30.11.2018 | ||
LI | 30.11.2018 | ||
Former [2020/16] | CZ | 02.05.2018 | |
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
MC | 02.05.2018 | ||
MT | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SI | 02.05.2018 | ||
SK | 02.05.2018 | ||
TR | 02.05.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
AT | 28.11.2018 | ||
GB | 28.11.2018 | ||
IE | 28.11.2018 | ||
LU | 28.11.2018 | ||
BE | 30.11.2018 | ||
CH | 30.11.2018 | ||
FR | 30.11.2018 | ||
LI | 30.11.2018 | ||
Former [2020/11] | CZ | 02.05.2018 | |
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
MC | 02.05.2018 | ||
MT | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SI | 02.05.2018 | ||
SK | 02.05.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
AT | 28.11.2018 | ||
GB | 28.11.2018 | ||
IE | 28.11.2018 | ||
LU | 28.11.2018 | ||
BE | 30.11.2018 | ||
CH | 30.11.2018 | ||
FR | 30.11.2018 | ||
LI | 30.11.2018 | ||
Former [2020/08] | CZ | 02.05.2018 | |
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
MC | 02.05.2018 | ||
MT | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SI | 02.05.2018 | ||
SK | 02.05.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
GB | 28.11.2018 | ||
IE | 28.11.2018 | ||
LU | 28.11.2018 | ||
BE | 30.11.2018 | ||
CH | 30.11.2018 | ||
FR | 30.11.2018 | ||
LI | 30.11.2018 | ||
Former [2020/03] | CZ | 02.05.2018 | |
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
MC | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SI | 02.05.2018 | ||
SK | 02.05.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
GB | 28.11.2018 | ||
IE | 28.11.2018 | ||
LU | 28.11.2018 | ||
BE | 30.11.2018 | ||
CH | 30.11.2018 | ||
FR | 30.11.2018 | ||
LI | 30.11.2018 | ||
Former [2019/51] | CZ | 02.05.2018 | |
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
MC | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SI | 02.05.2018 | ||
SK | 02.05.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
IE | 28.11.2018 | ||
LU | 28.11.2018 | ||
BE | 30.11.2018 | ||
CH | 30.11.2018 | ||
FR | 30.11.2018 | ||
LI | 30.11.2018 | ||
Former [2019/49] | CZ | 02.05.2018 | |
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
MC | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SI | 02.05.2018 | ||
SK | 02.05.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
IE | 28.11.2018 | ||
LU | 28.11.2018 | ||
CH | 30.11.2018 | ||
FR | 30.11.2018 | ||
LI | 30.11.2018 | ||
Former [2019/48] | CZ | 02.05.2018 | |
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
MC | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SI | 02.05.2018 | ||
SK | 02.05.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
IE | 28.11.2018 | ||
LU | 28.11.2018 | ||
CH | 30.11.2018 | ||
LI | 30.11.2018 | ||
Former [2019/40] | CZ | 02.05.2018 | |
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
MC | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SI | 02.05.2018 | ||
SK | 02.05.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
LU | 28.11.2018 | ||
CH | 30.11.2018 | ||
LI | 30.11.2018 | ||
Former [2019/34] | CZ | 02.05.2018 | |
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
MC | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SI | 02.05.2018 | ||
SK | 02.05.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
LU | 28.11.2018 | ||
Former [2019/33] | CZ | 02.05.2018 | |
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
MC | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SI | 02.05.2018 | ||
SK | 02.05.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
Former [2019/26] | CZ | 02.05.2018 | |
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SI | 02.05.2018 | ||
SK | 02.05.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
Former [2019/11] | CZ | 02.05.2018 | |
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
IT | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SK | 02.05.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
Former [2019/10] | CZ | 02.05.2018 | |
DK | 02.05.2018 | ||
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
NL | 02.05.2018 | ||
PL | 02.05.2018 | ||
RO | 02.05.2018 | ||
SE | 02.05.2018 | ||
SK | 02.05.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
Former [2019/09] | DK | 02.05.2018 | |
EE | 02.05.2018 | ||
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
NL | 02.05.2018 | ||
SE | 02.05.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
Former [2019/08] | DK | 02.05.2018 | |
ES | 02.05.2018 | ||
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
NL | 02.05.2018 | ||
SE | 02.05.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
Former [2019/03] | ES | 02.05.2018 | |
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
NL | 02.05.2018 | ||
SE | 02.05.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
PT | 03.09.2018 | ||
Former [2018/52] | ES | 02.05.2018 | |
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
NL | 02.05.2018 | ||
SE | 02.05.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
GR | 03.08.2018 | ||
Former [2018/51] | ES | 02.05.2018 | |
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
LT | 02.05.2018 | ||
LV | 02.05.2018 | ||
SE | 02.05.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
Former [2018/50] | ES | 02.05.2018 | |
FI | 02.05.2018 | ||
HR | 02.05.2018 | ||
LT | 02.05.2018 | ||
SE | 02.05.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
Former [2018/49] | ES | 02.05.2018 | |
FI | 02.05.2018 | ||
LT | 02.05.2018 | ||
SE | 02.05.2018 | ||
BG | 02.08.2018 | ||
NO | 02.08.2018 | ||
Former [2018/47] | ES | 02.05.2018 | |
FI | 02.05.2018 | ||
LT | 02.05.2018 | ||
NO | 02.08.2018 | Cited in | International search | [Y]EP0216694 (COMMISSARIAT ENERGIE ATOMIQUE [FR]) [Y] 4-6 * figure 2 *; | [Y]US4799754 (GOLDENBERG TSVI [US]) [Y] 4-6* figures 1,3 *; | [Y]US5989243 (GOLDENBERG TSVI [US]) [Y] 4-6 * figure 1 *; | [A]DE19819762 (BOSCH GMBH ROBERT [DE]) [A] 1-3,7-10 * column 4, line 14 - column 5, line 59; figure 2 *; | [A]WO2005019768 (BOSCH GMBH ROBERT [DE], et al) [A] 1-3,7,8,10 * figures 1,2 *; | [XY]WO2005082225 (OPTISCAN PTY LTD [AU], et al) [X] 1-3,7-10 * page 1, lines 9-18 * * page 24, line 9 - page 27, line 24 * * page 32, line 36 - page 34, line 34 * * figures 12,13A,13B,17A,17B * [Y] 4-6; | [A]WO2006032561 (BOSCH GMBH ROBERT [DE], et al) [A] 1-3,7,8,10 * figures 1-3 *; | [A]DE102005030210 (BOSCH GMBH ROBERT [DE]) [A] 1-3,7,8 * figures 1,2 * |