EP2113368 - Blow moulding device [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 07.01.2022 Database last updated on 17.05.2024 | |
Former | The patent has been granted Status updated on 29.01.2021 | ||
Former | Grant of patent is intended Status updated on 03.11.2020 | ||
Former | Examination is in progress Status updated on 16.03.2018 | Most recent event Tooltip | 27.04.2024 | Lapse of the patent in a contracting state New state(s): MK | published on 29.05.2024 [2024/22] | Applicant(s) | For all designated states Krones AG Böhmerwaldstraße 5 93073 Neutraubling / DE | [2009/45] | Inventor(s) | 01 /
Detrois, Christian 19 Rue Jaques Brel 88190 Golbey / FR | [2009/45] | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2021/09] |
Former [2009/45] | Grünecker, Kinkeldey, Stockmair & Schwanhäusser Anwaltssozietät Leopoldstrasse 4 80802 München / DE | Application number, filing date | 09004872.9 | 01.04.2009 | [2009/45] | Priority number, date | DE20082005257U | 17.04.2008 Original published format: DE 202008005257 U | [2009/45] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | EP2113368 | Date: | 04.11.2009 | Language: | DE | [2009/45] | Type: | A3 Search report | No.: | EP2113368 | Date: | 09.04.2014 | Language: | DE | [2014/15] | Type: | B1 Patent specification | No.: | EP2113368 | Date: | 03.03.2021 | Language: | DE | [2021/09] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 07.03.2014 | Classification | IPC: | B29C49/64, // B29C49/16, B29C49/36, B29C49/42, B29C49/62, B29C49/78 | [2020/46] | CPC: |
B29C49/64 (EP);
B29C49/6465 (US);
B29C49/16 (EP,US);
B29C49/42845 (US);
B29C2049/6606 (EP);
B29C2049/6692 (EP);
B29C2049/7831 (EP,US);
B29C2049/7832 (EP);
B29C49/36 (EP);
B29C49/4284 (EP);
B29C49/42855 (EP);
B29C49/62 (EP);
|
Former IPC [2009/45] | B29C49/48, B29C49/64, // B29C49/06 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2021/09] |
Former [2009/45] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | Vorrichtung zum Blasformen | [2009/45] | English: | Blow moulding device | [2009/45] | French: | Dispositif de formage par soufflage | [2009/45] | Examination procedure | 06.08.2014 | Amendment by applicant (claims and/or description) | 06.08.2014 | Examination requested [2014/38] | 15.03.2018 | Despatch of a communication from the examining division (Time limit: M06) | 10.08.2018 | Reply to a communication from the examining division | 12.02.2020 | Despatch of a communication from the examining division (Time limit: M04) | 30.04.2020 | Reply to a communication from the examining division | 04.11.2020 | Communication of intention to grant the patent | 20.01.2021 | Fee for grant paid | 20.01.2021 | Fee for publishing/printing paid | 20.01.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | EP18186588.2 / EP3412429 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 15.03.2018 | Opposition(s) | 06.12.2021 | No opposition filed within time limit [2022/06] | Fees paid | Renewal fee | 12.04.2011 | Renewal fee patent year 03 | 28.03.2012 | Renewal fee patent year 04 | 12.04.2013 | Renewal fee patent year 05 | 12.03.2014 | Renewal fee patent year 06 | 10.04.2015 | Renewal fee patent year 07 | 11.04.2016 | Renewal fee patent year 08 | 10.04.2017 | Renewal fee patent year 09 | 11.04.2018 | Renewal fee patent year 10 | 15.04.2019 | Renewal fee patent year 11 | 31.03.2020 | Renewal fee patent year 12 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 01.04.2009 | CY | 03.03.2021 | CZ | 03.03.2021 | DK | 03.03.2021 | EE | 03.03.2021 | ES | 03.03.2021 | FI | 03.03.2021 | HR | 03.03.2021 | LT | 03.03.2021 | LV | 03.03.2021 | MC | 03.03.2021 | MK | 03.03.2021 | NL | 03.03.2021 | PL | 03.03.2021 | RO | 03.03.2021 | SE | 03.03.2021 | SI | 03.03.2021 | SK | 03.03.2021 | AT | 01.04.2021 | IE | 01.04.2021 | LU | 01.04.2021 | BE | 30.04.2021 | CH | 30.04.2021 | LI | 30.04.2021 | BG | 03.06.2021 | GB | 03.06.2021 | NO | 03.06.2021 | GR | 04.06.2021 | IS | 03.07.2021 | PT | 05.07.2021 | [2024/22] |
Former [2023/29] | HU | 01.04.2009 | |
CY | 03.03.2021 | ||
CZ | 03.03.2021 | ||
DK | 03.03.2021 | ||
EE | 03.03.2021 | ||
ES | 03.03.2021 | ||
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
MC | 03.03.2021 | ||
NL | 03.03.2021 | ||
PL | 03.03.2021 | ||
RO | 03.03.2021 | ||
SE | 03.03.2021 | ||
SI | 03.03.2021 | ||
SK | 03.03.2021 | ||
AT | 01.04.2021 | ||
IE | 01.04.2021 | ||
LU | 01.04.2021 | ||
BE | 30.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
BG | 03.06.2021 | ||
GB | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
IS | 03.07.2021 | ||
PT | 05.07.2021 | ||
Former [2023/24] | CY | 03.03.2021 | |
CZ | 03.03.2021 | ||
DK | 03.03.2021 | ||
EE | 03.03.2021 | ||
ES | 03.03.2021 | ||
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
MC | 03.03.2021 | ||
NL | 03.03.2021 | ||
PL | 03.03.2021 | ||
RO | 03.03.2021 | ||
SE | 03.03.2021 | ||
SI | 03.03.2021 | ||
SK | 03.03.2021 | ||
AT | 01.04.2021 | ||
IE | 01.04.2021 | ||
LU | 01.04.2021 | ||
BE | 30.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
BG | 03.06.2021 | ||
GB | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
IS | 03.07.2021 | ||
PT | 05.07.2021 | ||
Former [2022/37] | CZ | 03.03.2021 | |
DK | 03.03.2021 | ||
EE | 03.03.2021 | ||
ES | 03.03.2021 | ||
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
MC | 03.03.2021 | ||
NL | 03.03.2021 | ||
PL | 03.03.2021 | ||
RO | 03.03.2021 | ||
SE | 03.03.2021 | ||
SI | 03.03.2021 | ||
SK | 03.03.2021 | ||
AT | 01.04.2021 | ||
IE | 01.04.2021 | ||
LU | 01.04.2021 | ||
BE | 30.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
BG | 03.06.2021 | ||
GB | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
IS | 03.07.2021 | ||
PT | 05.07.2021 | ||
Former [2022/34] | CZ | 03.03.2021 | |
DK | 03.03.2021 | ||
EE | 03.03.2021 | ||
ES | 03.03.2021 | ||
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
MC | 03.03.2021 | ||
NL | 03.03.2021 | ||
PL | 03.03.2021 | ||
RO | 03.03.2021 | ||
SE | 03.03.2021 | ||
SI | 03.03.2021 | ||
SK | 03.03.2021 | ||
IE | 01.04.2021 | ||
LU | 01.04.2021 | ||
BE | 30.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
BG | 03.06.2021 | ||
GB | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
IS | 03.07.2021 | ||
PT | 05.07.2021 | ||
Former [2022/23] | CZ | 03.03.2021 | |
DK | 03.03.2021 | ||
EE | 03.03.2021 | ||
ES | 03.03.2021 | ||
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
MC | 03.03.2021 | ||
NL | 03.03.2021 | ||
PL | 03.03.2021 | ||
RO | 03.03.2021 | ||
SE | 03.03.2021 | ||
SI | 03.03.2021 | ||
SK | 03.03.2021 | ||
IE | 01.04.2021 | ||
LU | 01.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
BG | 03.06.2021 | ||
GB | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
IS | 03.07.2021 | ||
PT | 05.07.2021 | ||
Former [2022/22] | CZ | 03.03.2021 | |
DK | 03.03.2021 | ||
EE | 03.03.2021 | ||
ES | 03.03.2021 | ||
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
MC | 03.03.2021 | ||
NL | 03.03.2021 | ||
PL | 03.03.2021 | ||
RO | 03.03.2021 | ||
SE | 03.03.2021 | ||
SI | 03.03.2021 | ||
SK | 03.03.2021 | ||
IE | 01.04.2021 | ||
LU | 01.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
BG | 03.06.2021 | ||
GB | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
PT | 05.07.2021 | ||
Former [2022/21] | CZ | 03.03.2021 | |
DK | 03.03.2021 | ||
EE | 03.03.2021 | ||
ES | 03.03.2021 | ||
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
MC | 03.03.2021 | ||
NL | 03.03.2021 | ||
PL | 03.03.2021 | ||
RO | 03.03.2021 | ||
SE | 03.03.2021 | ||
SI | 03.03.2021 | ||
SK | 03.03.2021 | ||
IE | 01.04.2021 | ||
LU | 01.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
PT | 05.07.2021 | ||
Former [2022/11] | CZ | 03.03.2021 | |
DK | 03.03.2021 | ||
EE | 03.03.2021 | ||
ES | 03.03.2021 | ||
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
MC | 03.03.2021 | ||
NL | 03.03.2021 | ||
PL | 03.03.2021 | ||
RO | 03.03.2021 | ||
SE | 03.03.2021 | ||
SI | 03.03.2021 | ||
SK | 03.03.2021 | ||
LU | 01.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
PT | 05.07.2021 | ||
Former [2022/10] | CZ | 03.03.2021 | |
DK | 03.03.2021 | ||
EE | 03.03.2021 | ||
ES | 03.03.2021 | ||
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
MC | 03.03.2021 | ||
NL | 03.03.2021 | ||
PL | 03.03.2021 | ||
RO | 03.03.2021 | ||
SE | 03.03.2021 | ||
SK | 03.03.2021 | ||
LU | 01.04.2021 | ||
CH | 30.04.2021 | ||
LI | 30.04.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
PT | 05.07.2021 | ||
Former [2022/08] | CZ | 03.03.2021 | |
DK | 03.03.2021 | ||
EE | 03.03.2021 | ||
ES | 03.03.2021 | ||
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
MC | 03.03.2021 | ||
NL | 03.03.2021 | ||
PL | 03.03.2021 | ||
RO | 03.03.2021 | ||
SE | 03.03.2021 | ||
SK | 03.03.2021 | ||
LU | 01.04.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
IS | 03.07.2021 | ||
PT | 05.07.2021 | ||
Former [2022/07] | CZ | 03.03.2021 | |
EE | 03.03.2021 | ||
ES | 03.03.2021 | ||
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
MC | 03.03.2021 | ||
NL | 03.03.2021 | ||
PL | 03.03.2021 | ||
RO | 03.03.2021 | ||
SE | 03.03.2021 | ||
SK | 03.03.2021 | ||
LU | 01.04.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
IS | 03.07.2021 | ||
PT | 05.07.2021 | ||
Former [2022/04] | CZ | 03.03.2021 | |
EE | 03.03.2021 | ||
ES | 03.03.2021 | ||
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
NL | 03.03.2021 | ||
PL | 03.03.2021 | ||
RO | 03.03.2021 | ||
SE | 03.03.2021 | ||
SK | 03.03.2021 | ||
LU | 01.04.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
IS | 03.07.2021 | ||
PT | 05.07.2021 | ||
Former [2021/51] | CZ | 03.03.2021 | |
EE | 03.03.2021 | ||
ES | 03.03.2021 | ||
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
NL | 03.03.2021 | ||
PL | 03.03.2021 | ||
RO | 03.03.2021 | ||
SE | 03.03.2021 | ||
SK | 03.03.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
IS | 03.07.2021 | ||
PT | 05.07.2021 | ||
Former [2021/50] | CZ | 03.03.2021 | |
EE | 03.03.2021 | ||
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
NL | 03.03.2021 | ||
PL | 03.03.2021 | ||
RO | 03.03.2021 | ||
SE | 03.03.2021 | ||
SK | 03.03.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
PT | 05.07.2021 | ||
Former [2021/48] | CZ | 03.03.2021 | |
EE | 03.03.2021 | ||
FI | 03.03.2021 | ||
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
NL | 03.03.2021 | ||
PL | 03.03.2021 | ||
SE | 03.03.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
Former [2021/43] | FI | 03.03.2021 | |
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
NL | 03.03.2021 | ||
PL | 03.03.2021 | ||
SE | 03.03.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
Former [2021/39] | FI | 03.03.2021 | |
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
PL | 03.03.2021 | ||
SE | 03.03.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
Former [2021/38] | FI | 03.03.2021 | |
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
SE | 03.03.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
Former [2021/37] | FI | 03.03.2021 | |
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
LV | 03.03.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
Former [2021/36] | FI | 03.03.2021 | |
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
BG | 03.06.2021 | ||
NO | 03.06.2021 | ||
GR | 04.06.2021 | ||
Former [2021/35] | FI | 03.03.2021 | |
HR | 03.03.2021 | ||
LT | 03.03.2021 | ||
NO | 03.06.2021 | ||
Former [2021/33] | FI | 03.03.2021 | |
LT | 03.03.2021 | ||
NO | 03.06.2021 | Documents cited: | Search | [A]DE3111925 (BOSCH GMBH ROBERT [DE]) [A] 1-8 * figures 1,2; claims 1-9 *; | [I]EP0409388 (GRAHAM ENG CORP [US]) [I] 1,2 * figures 1-3 * * column 1, line 27 - column 2, line 1 *; | [IY]US5229043 (LEE RON C [US]) [I] 1,2 * figure 1 * * column 3, lines 4-55 * * column 4, lines 6-31 * * column 4, line 46 - column 6, line 19 * * column 6, lines 35-38 * [Y] 3-8; | [IY]DE4325559 (AIR PROD GMBH [DE]) [I] 1,2 * figures 1,2 * * column 4, line 45 - column 6, line 23 * [Y] 3-8; | [A]WO9625285 (PROCONTROL AG [CH], et al) [A] 1-8 * figures 1-4 * * column 6, line 10 - column 7, line 21 *; | [I]US6423253 (BUNEL CHRISTOPHE [FR], et al) [I] 1,2 * figures 1,2 * * column 3, line 53 - column 4, line 42 * * column 5, lines 1-34 *; | [A]US2004173949 (STORIONE SAVINO [CH], et al) [A] 1-8* paragraphs [0041] - [0047]; figures 1-5; claims 1,7,10 *; | [YD]DE102004014653 (KRONES AG [DE]) [YD] 1-8 * paragraphs [0035] , [0036] , [0038] , [0040] - [0043] - [0045] , [0046]; figures 1-4 *; | [XY]DE102004018146 (SIG TECHNOLOGY LTD [CH]) [X] 1-3 * paragraphs [0016] , [0017] , [0019] , [0020] , [0025] , [0030] , [0033] , [0037] , [0039] , [0040] , [0059] , [0061] , [0077] - [0080] - [0082] , [0084] - [0095]; figures 1,6,7,9-11 * * paragraphs [0098] , [0099]; figures 1,6,7,9-11 * [Y] 1-8; | [YD]DE202007008120U (KRONES AG [DE]) [YD] 1,2,5 * paragraphs [0021] , [0023] , [0026] , [0028] , [0029]; figures 1-3 *; | [I]WO2008006347 (SIG TECHNOLOGY AG [CH], et al) [I] 1,2 * figure 8 * * page 17, lines 6-16 * * page 20, line 7 - page 21, line 30 * | by applicant | DE102004014653 | DE202007008120U |