EP2146232 - Connector for an optical connection [Right-click to bookmark this link] | |||
Former [2010/03] | Plug-in element for an optical plug connector | ||
[2018/36] | Status | No opposition filed within time limit Status updated on 01.11.2019 Database last updated on 13.07.2024 | |
Former | The patent has been granted Status updated on 23.11.2018 | ||
Former | Grant of patent is intended Status updated on 03.09.2018 | ||
Former | Examination is in progress Status updated on 07.02.2018 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Neutrik AG Im alten Riet 143 9494 Schaan / LI | [2018/34] |
Former [2010/03] | For all designated states Neutrik Aktiengesellschaft Im alten Riet 143 9494 Schaan / LI | Inventor(s) | 01 /
Dobler, Oliver Fichtenweg 10 6774 Tschagguns / AT | [2010/03] | Representative(s) | Hofmann, Ralf U., et al Hofmann & Fechner Patentanwälte Hörnlingerstrasse 3 Postfach 5 6830 Rankweil / AT | [2018/52] |
Former [2010/03] | Hofmann, Ralf U., et al Egelseestrasse 65a Postfach 61 6806 Feldkirch / AT | Application number, filing date | 09008787.5 | 04.07.2009 | [2010/03] | Priority number, date | DE20081033232 | 15.07.2008 Original published format: DE102008033232 | [2010/03] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | EP2146232 | Date: | 20.01.2010 | Language: | DE | [2010/03] | Type: | B1 Patent specification | No.: | EP2146232 | Date: | 26.12.2018 | Language: | DE | [2018/52] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 21.09.2009 | Classification | IPC: | G02B6/38, // G02B6/42 | [2018/36] | CPC: |
G02B6/3849 (EP,US);
G02B2006/4297 (EP,US);
G02B6/3879 (EP,US)
|
Former IPC [2010/03] | G02B6/38 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2018/52] |
Former [2010/03] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR | Title | German: | Steckerteil für eine optische Steckverbindung | [2010/03] | English: | Connector for an optical connection | [2018/36] | French: | Connecteur pour un raccordement optique | [2018/36] |
Former [2010/03] | Plug-in element for an optical plug connector | ||
Former [2010/03] | Fiche mâle pour une fiche de raccordement optique | Examination procedure | 23.04.2010 | Examination requested [2010/22] | 07.06.2010 | Despatch of a communication from the examining division (Time limit: M04) | 04.10.2010 | Reply to a communication from the examining division | 01.03.2012 | Despatch of a communication from the examining division (Time limit: M04) | 20.04.2012 | Reply to a communication from the examining division | 29.01.2018 | Despatch of a communication from the examining division (Time limit: M02) | 05.03.2018 | Reply to a communication from the examining division | 04.09.2018 | Communication of intention to grant the patent | 08.11.2018 | Fee for grant paid | 08.11.2018 | Fee for publishing/printing paid | 08.11.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 07.06.2010 | Opposition(s) | 27.09.2019 | No opposition filed within time limit [2019/49] | Fees paid | Renewal fee | 07.06.2011 | Renewal fee patent year 03 | 13.06.2012 | Renewal fee patent year 04 | 06.06.2013 | Renewal fee patent year 05 | 27.05.2014 | Renewal fee patent year 06 | 17.06.2015 | Renewal fee patent year 07 | 07.06.2016 | Renewal fee patent year 08 | 21.06.2017 | Renewal fee patent year 09 | 18.06.2018 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 04.07.2009 | CY | 26.12.2018 | CZ | 26.12.2018 | DK | 26.12.2018 | EE | 26.12.2018 | ES | 26.12.2018 | FI | 26.12.2018 | HR | 26.12.2018 | IT | 26.12.2018 | LT | 26.12.2018 | LV | 26.12.2018 | MC | 26.12.2018 | MK | 26.12.2018 | MT | 26.12.2018 | NL | 26.12.2018 | PL | 26.12.2018 | RO | 26.12.2018 | SE | 26.12.2018 | SI | 26.12.2018 | SK | 26.12.2018 | SM | 26.12.2018 | BG | 26.03.2019 | NO | 26.03.2019 | GR | 27.03.2019 | IS | 26.04.2019 | PT | 26.04.2019 | IE | 04.07.2019 | LU | 04.07.2019 | BE | 31.07.2019 | [2022/31] |
Former [2021/34] | HU | 04.07.2009 | |
CY | 26.12.2018 | ||
CZ | 26.12.2018 | ||
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
MC | 26.12.2018 | ||
MT | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
SE | 26.12.2018 | ||
SI | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
IE | 04.07.2019 | ||
LU | 04.07.2019 | ||
BE | 31.07.2019 | ||
Former [2021/32] | HU | 04.07.2009 | |
CY | 26.12.2018 | ||
CZ | 26.12.2018 | ||
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
MC | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
SE | 26.12.2018 | ||
SI | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
IE | 04.07.2019 | ||
LU | 04.07.2019 | ||
BE | 31.07.2019 | ||
Former [2021/26] | CY | 26.12.2018 | |
CZ | 26.12.2018 | ||
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
MC | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
SE | 26.12.2018 | ||
SI | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
IE | 04.07.2019 | ||
LU | 04.07.2019 | ||
BE | 31.07.2019 | ||
Former [2020/36] | CZ | 26.12.2018 | |
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
MC | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
SE | 26.12.2018 | ||
SI | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
IE | 04.07.2019 | ||
LU | 04.07.2019 | ||
BE | 31.07.2019 | ||
Former [2020/26] | CZ | 26.12.2018 | |
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
MC | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
SE | 26.12.2018 | ||
SI | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
LU | 04.07.2019 | ||
BE | 31.07.2019 | ||
Former [2020/14] | CZ | 26.12.2018 | |
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
MC | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
SE | 26.12.2018 | ||
SI | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2020/13] | CZ | 26.12.2018 | |
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
SE | 26.12.2018 | ||
SI | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2019/48] | CZ | 26.12.2018 | |
DK | 26.12.2018 | ||
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
SE | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2019/39] | CZ | 26.12.2018 | |
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
SE | 26.12.2018 | ||
SK | 26.12.2018 | ||
SM | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
IS | 26.04.2019 | ||
PT | 26.04.2019 | ||
Former [2019/37] | CZ | 26.12.2018 | |
EE | 26.12.2018 | ||
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
RO | 26.12.2018 | ||
SE | 26.12.2018 | ||
SM | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
PT | 26.04.2019 | ||
Former [2019/35] | CZ | 26.12.2018 | |
ES | 26.12.2018 | ||
FI | 26.12.2018 | ||
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
PL | 26.12.2018 | ||
SE | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
PT | 26.04.2019 | ||
Former [2019/34] | FI | 26.12.2018 | |
HR | 26.12.2018 | ||
IT | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
SE | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
PT | 26.04.2019 | ||
Former [2019/33] | FI | 26.12.2018 | |
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
SE | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
PT | 26.04.2019 | ||
Former [2019/30] | FI | 26.12.2018 | |
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
NL | 26.12.2018 | ||
SE | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
Former [2019/24] | FI | 26.12.2018 | |
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
SE | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
GR | 27.03.2019 | ||
Former [2019/23] | FI | 26.12.2018 | |
HR | 26.12.2018 | ||
LT | 26.12.2018 | ||
LV | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
Former [2019/22] | FI | 26.12.2018 | |
LT | 26.12.2018 | ||
BG | 26.03.2019 | ||
NO | 26.03.2019 | ||
Former [2019/21] | FI | 26.12.2018 | |
LT | 26.12.2018 | ||
NO | 26.03.2019 | ||
Former [2019/20] | LT | 26.12.2018 | |
NO | 26.03.2019 | Documents cited: | Search | [A]US6004147 (DON-YEHIYA YEHUDA [IL]) [A] 7 * column 4, line 37 - column 5, line 57; figures 1,3-6 *; | [A]EP1271204 (DIAMOND SA [CH]) [A] 1,14* figure 12 *; | [DX]EP1598685 (NEUTRIK AG [LI]) [DX] 1-9,12,15 * paragraph [0026] - paragraph [0035]; figures 9,12-14 * * paragraphs [0041] , [0042] *; | [X]EP1662286 (SEIKO GIKEN KK [JP]) [X] 1,2,6,7,9,12,15 * paragraphs [0018] , [0072]; figure 4 *; | [X]EP1936415 (HONDA TSUSHIN KOGYO CO LTD [JP]) [X] 1,2,6,7,9-15 * paragraph [0016] - paragraph [0018] * * paragraph [0025] - paragraph [0031]; figures 1A,3A,3B * | by applicant | DE102004025512 |