EP2182671 - System, apparatus and method for replacing a cryptographic key [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 24.01.2020 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 15.02.2019 | ||
Former | Grant of patent is intended Status updated on 26.09.2018 | Most recent event Tooltip | 09.07.2021 | Lapse of the patent in a contracting state New state(s): HU | published on 11.08.2021 [2021/32] | Applicant(s) | For all designated states Qualcomm Incorporated 5775 Morehouse Drive San Diego, CA 92121-1714 / US | [2010/18] | Inventor(s) | 01 /
Rose, Gregory Qualcom Incorporated 575 Morehouse Drive San Diego, California 9212-1714 / US | 02 /
Gantman, Alexander Qualcom Incorporated 5775 Morehouse Drive San Diego, California 9212-1714 / US | 03 /
Noerenberg, John W. Qualcom Incorporated 5775 Morehouse Drive San Diego, California 9212-1714 / US | [2019/12] |
Former [2010/18] | 01 /
Rose, Gregory Qualcom Incorporated 575 Morehouse Drive San Diego, California 9212-1714 / US | ||
02 /
Gantman, Alexander Qualcom Incorporated 5775 Morehouse Drive San Diego, California 9212-1714 / US | |||
03 /
Noerenberg, John W. Qualcom Incorporated 5775 Morehouse Drive San Diego, California 9212-1714 / US | Representative(s) | Dunlop, Hugh Christopher, et al Maucher Jenkins Seventh Floor Offices Artillery House 11-19 Artillery Row London SW1P 1RT / GB | [N/P] |
Former [2019/12] | Dunlop, Hugh Christopher, et al Maucher Jenkins 26 Caxton Street London SW1H 0RJ / GB | ||
Former [2013/51] | Dunlop, Hugh Christopher, et al R.G.C. Jenkins & Co. 26 Caxton Street London SW1H 0RJ / GB | ||
Former [2010/18] | Condon, Neil, et al R.G.C. Jenkins & Co 26 Caxton Street London SW1H 0RJ / GB | Application number, filing date | 09011048.7 | 30.12.2003 | [2010/18] | Priority number, date | US20030438617P | 07.01.2003 Original published format: US 438617 P | [2010/18] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2182671 | Date: | 05.05.2010 | Language: | EN | [2010/18] | Type: | B1 Patent specification | No.: | EP2182671 | Date: | 20.03.2019 | Language: | EN | [2019/12] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 31.03.2010 | Classification | IPC: | H04L9/08, H04L9/32 | [2018/42] | CPC: |
H04L9/0891 (EP,US);
H04L9/14 (KR);
H04K1/00 (KR);
H04L9/00 (KR);
H04L9/32 (KR);
H04L9/3247 (EP,US)
|
Former IPC [2010/18] | H04L9/00, H04K1/00 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IT, LI, LU, MC, NL, PT, RO, SE, SI, SK, TR [2019/12] |
Former [2010/18] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IT, LI, LU, MC, NL, PT, RO, SE, SI, SK, TR | Title | German: | System, Gerät und Verfahren zum Ersetzen eines kryptographischen Schlüssels | [2010/18] | English: | System, apparatus and method for replacing a cryptographic key | [2010/18] | French: | Système, dispositif et procédé pour remplacer une clé cryptographique | [2010/18] | Examination procedure | 29.10.2010 | Examination requested [2010/50] | 26.11.2010 | Despatch of a communication from the examining division (Time limit: M06) | 06.06.2011 | Reply to a communication from the examining division | 13.04.2015 | Despatch of a communication from the examining division (Time limit: M04) | 14.08.2015 | Reply to a communication from the examining division | 13.09.2018 | Cancellation of oral proceeding that was planned for 25.09.2018 | 25.09.2018 | Date of oral proceedings (cancelled) | 27.09.2018 | Communication of intention to grant the patent | 06.02.2019 | Fee for grant paid | 06.02.2019 | Fee for publishing/printing paid | 06.02.2019 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP03800318.2 / EP1582024 | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued (EP20030800318) is 02.11.2006 | Opposition(s) | 02.01.2020 | No opposition filed within time limit [2020/09] | Fees paid | Renewal fee | 24.09.2009 | Renewal fee patent year 03 | 24.09.2009 | Renewal fee patent year 04 | 24.09.2009 | Renewal fee patent year 05 | 24.09.2009 | Renewal fee patent year 06 | 24.09.2009 | Renewal fee patent year 07 | 22.11.2010 | Renewal fee patent year 08 | 07.12.2011 | Renewal fee patent year 09 | 07.12.2012 | Renewal fee patent year 10 | 06.12.2013 | Renewal fee patent year 11 | 05.12.2014 | Renewal fee patent year 12 | 07.12.2015 | Renewal fee patent year 13 | 08.12.2016 | Renewal fee patent year 14 | 07.12.2017 | Renewal fee patent year 15 | 07.12.2018 | Renewal fee patent year 16 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 30.12.2003 | AT | 20.03.2019 | CY | 20.03.2019 | CZ | 20.03.2019 | DK | 20.03.2019 | EE | 20.03.2019 | ES | 20.03.2019 | FI | 20.03.2019 | IT | 20.03.2019 | MC | 20.03.2019 | NL | 20.03.2019 | RO | 20.03.2019 | SE | 20.03.2019 | SI | 20.03.2019 | SK | 20.03.2019 | TR | 20.03.2019 | BG | 20.06.2019 | GR | 21.06.2019 | PT | 20.07.2019 | IE | 30.12.2019 | LU | 30.12.2019 | BE | 31.12.2019 | CH | 31.12.2019 | LI | 31.12.2019 | [2021/32] |
Former [2021/26] | AT | 20.03.2019 | |
CY | 20.03.2019 | ||
CZ | 20.03.2019 | ||
DK | 20.03.2019 | ||
EE | 20.03.2019 | ||
ES | 20.03.2019 | ||
FI | 20.03.2019 | ||
IT | 20.03.2019 | ||
MC | 20.03.2019 | ||
NL | 20.03.2019 | ||
RO | 20.03.2019 | ||
SE | 20.03.2019 | ||
SI | 20.03.2019 | ||
SK | 20.03.2019 | ||
TR | 20.03.2019 | ||
BG | 20.06.2019 | ||
GR | 21.06.2019 | ||
PT | 20.07.2019 | ||
IE | 30.12.2019 | ||
LU | 30.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
LI | 31.12.2019 | ||
Former [2020/51] | AT | 20.03.2019 | |
CZ | 20.03.2019 | ||
DK | 20.03.2019 | ||
EE | 20.03.2019 | ||
ES | 20.03.2019 | ||
FI | 20.03.2019 | ||
IT | 20.03.2019 | ||
MC | 20.03.2019 | ||
NL | 20.03.2019 | ||
RO | 20.03.2019 | ||
SE | 20.03.2019 | ||
SI | 20.03.2019 | ||
SK | 20.03.2019 | ||
TR | 20.03.2019 | ||
BG | 20.06.2019 | ||
GR | 21.06.2019 | ||
PT | 20.07.2019 | ||
IE | 30.12.2019 | ||
LU | 30.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
LI | 31.12.2019 | ||
Former [2020/46] | AT | 20.03.2019 | |
CZ | 20.03.2019 | ||
DK | 20.03.2019 | ||
EE | 20.03.2019 | ||
ES | 20.03.2019 | ||
FI | 20.03.2019 | ||
IT | 20.03.2019 | ||
MC | 20.03.2019 | ||
NL | 20.03.2019 | ||
RO | 20.03.2019 | ||
SE | 20.03.2019 | ||
SI | 20.03.2019 | ||
SK | 20.03.2019 | ||
TR | 20.03.2019 | ||
BG | 20.06.2019 | ||
GR | 21.06.2019 | ||
PT | 20.07.2019 | ||
IE | 30.12.2019 | ||
LU | 30.12.2019 | ||
Former [2020/39] | AT | 20.03.2019 | |
CZ | 20.03.2019 | ||
DK | 20.03.2019 | ||
EE | 20.03.2019 | ||
ES | 20.03.2019 | ||
FI | 20.03.2019 | ||
IT | 20.03.2019 | ||
MC | 20.03.2019 | ||
NL | 20.03.2019 | ||
RO | 20.03.2019 | ||
SE | 20.03.2019 | ||
SI | 20.03.2019 | ||
SK | 20.03.2019 | ||
TR | 20.03.2019 | ||
BG | 20.06.2019 | ||
GR | 21.06.2019 | ||
PT | 20.07.2019 | ||
Former [2020/17] | AT | 20.03.2019 | |
CZ | 20.03.2019 | ||
DK | 20.03.2019 | ||
EE | 20.03.2019 | ||
ES | 20.03.2019 | ||
FI | 20.03.2019 | ||
IT | 20.03.2019 | ||
NL | 20.03.2019 | ||
RO | 20.03.2019 | ||
SE | 20.03.2019 | ||
SI | 20.03.2019 | ||
SK | 20.03.2019 | ||
TR | 20.03.2019 | ||
BG | 20.06.2019 | ||
GR | 21.06.2019 | ||
PT | 20.07.2019 | ||
Former [2020/13] | AT | 20.03.2019 | |
CZ | 20.03.2019 | ||
DK | 20.03.2019 | ||
EE | 20.03.2019 | ||
ES | 20.03.2019 | ||
FI | 20.03.2019 | ||
IT | 20.03.2019 | ||
NL | 20.03.2019 | ||
RO | 20.03.2019 | ||
SE | 20.03.2019 | ||
SI | 20.03.2019 | ||
SK | 20.03.2019 | ||
BG | 20.06.2019 | ||
GR | 21.06.2019 | ||
PT | 20.07.2019 | ||
Former [2020/09] | AT | 20.03.2019 | |
CZ | 20.03.2019 | ||
DK | 20.03.2019 | ||
EE | 20.03.2019 | ||
ES | 20.03.2019 | ||
FI | 20.03.2019 | ||
IT | 20.03.2019 | ||
NL | 20.03.2019 | ||
RO | 20.03.2019 | ||
SE | 20.03.2019 | ||
SK | 20.03.2019 | ||
BG | 20.06.2019 | ||
GR | 21.06.2019 | ||
PT | 20.07.2019 | ||
Former [2020/03] | AT | 20.03.2019 | |
CZ | 20.03.2019 | ||
EE | 20.03.2019 | ||
ES | 20.03.2019 | ||
FI | 20.03.2019 | ||
IT | 20.03.2019 | ||
NL | 20.03.2019 | ||
RO | 20.03.2019 | ||
SE | 20.03.2019 | ||
SK | 20.03.2019 | ||
BG | 20.06.2019 | ||
GR | 21.06.2019 | ||
PT | 20.07.2019 | ||
Former [2019/49] | CZ | 20.03.2019 | |
EE | 20.03.2019 | ||
ES | 20.03.2019 | ||
FI | 20.03.2019 | ||
IT | 20.03.2019 | ||
NL | 20.03.2019 | ||
RO | 20.03.2019 | ||
SE | 20.03.2019 | ||
SK | 20.03.2019 | ||
BG | 20.06.2019 | ||
GR | 21.06.2019 | ||
PT | 20.07.2019 | ||
Former [2019/48] | ES | 20.03.2019 | |
FI | 20.03.2019 | ||
IT | 20.03.2019 | ||
NL | 20.03.2019 | ||
SE | 20.03.2019 | ||
BG | 20.06.2019 | ||
GR | 21.06.2019 | ||
PT | 20.07.2019 | ||
Former [2019/47] | ES | 20.03.2019 | |
FI | 20.03.2019 | ||
IT | 20.03.2019 | ||
NL | 20.03.2019 | ||
SE | 20.03.2019 | ||
BG | 20.06.2019 | ||
GR | 21.06.2019 | ||
Former [2019/46] | FI | 20.03.2019 | |
IT | 20.03.2019 | ||
NL | 20.03.2019 | ||
SE | 20.03.2019 | ||
BG | 20.06.2019 | ||
GR | 21.06.2019 | ||
Former [2019/40] | FI | 20.03.2019 | |
NL | 20.03.2019 | ||
SE | 20.03.2019 | ||
BG | 20.06.2019 | ||
GR | 21.06.2019 | ||
Former [2019/38] | FI | 20.03.2019 | |
SE | 20.03.2019 | ||
BG | 20.06.2019 | ||
GR | 21.06.2019 | ||
Former [2019/37] | FI | 20.03.2019 | |
SE | 20.03.2019 | ||
GR | 21.06.2019 | ||
Former [2019/34] | FI | 20.03.2019 | |
SE | 20.03.2019 | ||
Former [2019/33] | FI | 20.03.2019 | Documents cited: | Search | [A]US5201000 (MATYAS STEPHEN M [US], et al) [A] 1-20 * abstract *; | [A]US5675649 (BRENNAN J J [US], et al) [A] 1-20* column 1, lines 18-21, 44-56 *; | [X]US5761306 (LEWIS TONY [US]) [X] 1,11,13,18,20 * column 5, line 33 - column 8, line 34; figures 1,2 *; | [A]WO0205475 (BALTIMORE TECHNOLOGIES INC [CA], et al) [A] 1-20 * abstract *; | [A]EP1249964 (MATSUSHITA ELECTRIC IND CO LTD [JP]) [A] 1-20 * abstract * |