EP2040176 - Dynamic Resource Allocation [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 16.08.2013 Database last updated on 19.10.2024 | Most recent event Tooltip | 17.07.2015 | Lapse of the patent in a contracting state New state(s): HU | published on 19.08.2015 [2015/34] | Applicant(s) | For all designated states Solarflare Communications Inc 7505 Irvine Center Drive, Suite 100 Irvine, CA 92618 / US | [2012/33] |
Former [2009/13] | For all designated states Solarflare Communications Incorporated 9501 Jeronimo Road, Suite 250 Irvine, CA 92618 / US | Inventor(s) | 01 /
Riddoch, David 68 Tenison Road Cambridge, CB1 2DW / GB | 02 /
Pope, Steven 25 Grenville Raod Cambridge, Cambridgeshire CB1 3QL / GB | [2009/13] | Representative(s) | Driver, Virginia Rozanne, et al Page White & Farrer Limited Bedford House 21A John Street London WC1N 2BF / GB | [N/P] |
Former [2013/33] | Driver, Virginia Rozanne, et al Page White & Farrer Bedford House John Street London WC1N 2BF / GB | ||
Former [2012/41] | Slingsby, Philip Roy Page White & Farrer Bedford House John Street London, WC1N 2BF / GB | ||
Former [2009/13] | Slingsby, Philip Roy Page White & Farrer Bedford House John Street London, WC1N 2BF / GB | Application number, filing date | 09150007.4 | 02.09.2005 | [2009/13] | Priority number, date | GB20040020057 | 09.09.2004 Original published format: GB 0420057 | [2009/13] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2040176 | Date: | 25.03.2009 | Language: | EN | [2009/13] | Type: | B1 Patent specification | No.: | EP2040176 | Date: | 10.10.2012 | Language: | EN | [2012/41] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 23.02.2009 | Classification | IPC: | G06F13/42, G06F21/00 | [2009/13] | CPC: |
G06F13/4221 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR [2009/13] | Title | German: | Dynamische betriebsmittelzuteilung | [2009/13] | English: | Dynamic Resource Allocation | [2009/13] | French: | Affectation de ressources dynamiques | [2009/13] | Examination procedure | 17.09.2009 | Examination requested [2009/44] | 09.10.2009 | Despatch of a communication from the examining division (Time limit: M04) | 13.01.2010 | Reply to a communication from the examining division | 14.09.2011 | Date of oral proceedings | 24.10.2011 | Minutes of oral proceedings despatched | 03.11.2011 | Communication of intention to grant the patent | 30.01.2012 | Fee for grant paid | 30.01.2012 | Fee for publishing/printing paid | 10.05.2012 | Despatch of a communication from the examining division (Time limit: M04) | 29.08.2012 | Reply to a communication from the examining division | Parent application(s) Tooltip | EP05774309.8 / EP1787207 | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued (EP20050774309) is 04.10.2007 | Opposition(s) | 11.07.2013 | No opposition filed within time limit [2013/38] | Fees paid | Renewal fee | 02.01.2009 | Renewal fee patent year 03 | 02.01.2009 | Renewal fee patent year 04 | 04.08.2009 | Renewal fee patent year 05 | 01.09.2010 | Renewal fee patent year 06 | 05.09.2011 | Renewal fee patent year 07 | 31.07.2012 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 02.09.2005 | AT | 10.10.2012 | BE | 10.10.2012 | CY | 10.10.2012 | CZ | 10.10.2012 | DK | 10.10.2012 | EE | 10.10.2012 | FI | 10.10.2012 | IT | 10.10.2012 | LT | 10.10.2012 | LV | 10.10.2012 | MC | 10.10.2012 | NL | 10.10.2012 | PL | 10.10.2012 | RO | 10.10.2012 | SE | 10.10.2012 | SI | 10.10.2012 | SK | 10.10.2012 | TR | 10.10.2012 | BG | 10.01.2013 | GR | 11.01.2013 | ES | 21.01.2013 | IS | 10.02.2013 | PT | 11.02.2013 | [2015/34] |
Former [2015/32] | AT | 10.10.2012 | |
BE | 10.10.2012 | ||
CY | 10.10.2012 | ||
CZ | 10.10.2012 | ||
DK | 10.10.2012 | ||
EE | 10.10.2012 | ||
FI | 10.10.2012 | ||
IT | 10.10.2012 | ||
LT | 10.10.2012 | ||
LV | 10.10.2012 | ||
MC | 10.10.2012 | ||
NL | 10.10.2012 | ||
PL | 10.10.2012 | ||
RO | 10.10.2012 | ||
SE | 10.10.2012 | ||
SI | 10.10.2012 | ||
SK | 10.10.2012 | ||
TR | 10.10.2012 | ||
BG | 10.01.2013 | ||
GR | 11.01.2013 | ||
ES | 21.01.2013 | ||
IS | 10.02.2013 | ||
PT | 11.02.2013 | ||
Former [2014/20] | AT | 10.10.2012 | |
BE | 10.10.2012 | ||
CY | 10.10.2012 | ||
CZ | 10.10.2012 | ||
DK | 10.10.2012 | ||
EE | 10.10.2012 | ||
FI | 10.10.2012 | ||
IT | 10.10.2012 | ||
LT | 10.10.2012 | ||
LV | 10.10.2012 | ||
MC | 10.10.2012 | ||
NL | 10.10.2012 | ||
PL | 10.10.2012 | ||
RO | 10.10.2012 | ||
SE | 10.10.2012 | ||
SI | 10.10.2012 | ||
SK | 10.10.2012 | ||
BG | 10.01.2013 | ||
GR | 11.01.2013 | ||
ES | 21.01.2013 | ||
IS | 10.02.2013 | ||
PT | 11.02.2013 | ||
Former [2013/37] | AT | 10.10.2012 | |
BE | 10.10.2012 | ||
CY | 10.10.2012 | ||
CZ | 10.10.2012 | ||
DK | 10.10.2012 | ||
EE | 10.10.2012 | ||
FI | 10.10.2012 | ||
IT | 10.10.2012 | ||
LT | 10.10.2012 | ||
LV | 10.10.2012 | ||
NL | 10.10.2012 | ||
PL | 10.10.2012 | ||
RO | 10.10.2012 | ||
SE | 10.10.2012 | ||
SI | 10.10.2012 | ||
SK | 10.10.2012 | ||
BG | 10.01.2013 | ||
GR | 11.01.2013 | ||
ES | 21.01.2013 | ||
IS | 10.02.2013 | ||
PT | 11.02.2013 | ||
Former [2013/35] | AT | 10.10.2012 | |
BE | 10.10.2012 | ||
CY | 10.10.2012 | ||
CZ | 10.10.2012 | ||
DK | 10.10.2012 | ||
EE | 10.10.2012 | ||
FI | 10.10.2012 | ||
LT | 10.10.2012 | ||
LV | 10.10.2012 | ||
NL | 10.10.2012 | ||
PL | 10.10.2012 | ||
SE | 10.10.2012 | ||
SI | 10.10.2012 | ||
SK | 10.10.2012 | ||
BG | 10.01.2013 | ||
GR | 11.01.2013 | ||
ES | 21.01.2013 | ||
IS | 10.02.2013 | ||
PT | 11.02.2013 | ||
Former [2013/34] | AT | 10.10.2012 | |
BE | 10.10.2012 | ||
CY | 10.10.2012 | ||
DK | 10.10.2012 | ||
FI | 10.10.2012 | ||
LT | 10.10.2012 | ||
LV | 10.10.2012 | ||
NL | 10.10.2012 | ||
PL | 10.10.2012 | ||
SE | 10.10.2012 | ||
SI | 10.10.2012 | ||
BG | 10.01.2013 | ||
GR | 11.01.2013 | ||
ES | 21.01.2013 | ||
IS | 10.02.2013 | ||
PT | 11.02.2013 | ||
Former [2013/31] | AT | 10.10.2012 | |
BE | 10.10.2012 | ||
CY | 10.10.2012 | ||
FI | 10.10.2012 | ||
LT | 10.10.2012 | ||
LV | 10.10.2012 | ||
NL | 10.10.2012 | ||
PL | 10.10.2012 | ||
SE | 10.10.2012 | ||
SI | 10.10.2012 | ||
GR | 11.01.2013 | ||
ES | 21.01.2013 | ||
IS | 10.02.2013 | ||
PT | 11.02.2013 | ||
Former [2013/28] | BE | 10.10.2012 | |
CY | 10.10.2012 | ||
FI | 10.10.2012 | ||
LT | 10.10.2012 | ||
LV | 10.10.2012 | ||
NL | 10.10.2012 | ||
PL | 10.10.2012 | ||
SE | 10.10.2012 | ||
SI | 10.10.2012 | ||
GR | 11.01.2013 | ||
ES | 21.01.2013 | ||
IS | 10.02.2013 | ||
PT | 11.02.2013 | ||
Former [2013/24] | BE | 10.10.2012 | |
CY | 10.10.2012 | ||
FI | 10.10.2012 | ||
LT | 10.10.2012 | ||
LV | 10.10.2012 | ||
NL | 10.10.2012 | ||
PL | 10.10.2012 | ||
SE | 10.10.2012 | ||
SI | 10.10.2012 | ||
GR | 11.01.2013 | ||
ES | 21.01.2013 | ||
IS | 10.02.2013 | ||
Former [2013/23] | CY | 10.10.2012 | |
FI | 10.10.2012 | ||
LT | 10.10.2012 | ||
LV | 10.10.2012 | ||
NL | 10.10.2012 | ||
PL | 10.10.2012 | ||
SE | 10.10.2012 | ||
SI | 10.10.2012 | ||
ES | 21.01.2013 | ||
IS | 10.02.2013 | ||
Former [2013/22] | FI | 10.10.2012 | |
LT | 10.10.2012 | ||
NL | 10.10.2012 | ||
SE | 10.10.2012 | ||
SI | 10.10.2012 | ||
ES | 21.01.2013 | ||
IS | 10.02.2013 | ||
Former [2013/21] | LT | 10.10.2012 | |
SE | 10.10.2012 | ||
SI | 10.10.2012 | ||
Former [2013/20] | LT | 10.10.2012 | |
SI | 10.10.2012 | ||
Former [2013/11] | SI | 10.10.2012 | Documents cited: | Search | [A]US2003065847 (GOODRUM ALAN L [US], et al) [A] 1-6* the whole document *; | [A]US2003225990 (BROWN MARK L [US], et al) [A] 6 * paragraph [0016]; figure 1 * * paragraph [0027]; figures 3-5 * * paragraph [0044] * * paragraph [0047] *; | [AD]WO2004025477 (LEVEL 5 NETWORKS LTD [GB], et al) [AD] 1-6 * the whole document *; | [X]EP1435557 (IBM [US]) [X] 1-3 * figure 1 * * figure 4 * * paragraph [0012] - paragraph [0014] * * paragraph [0017] - paragraph [0021] *; | [A] - TOM SHANLEY - DON ANDERSON, PCI System Architecture (p. 309-323, 378-385), ADDISON-WESLEY, (200002), ISBN 0-201-30974-2, XP002356946 [A] 1-6 * page 310, line 6 - line 20 * * page 320; figures 18-1 * * page 378, line 1 - page 379, line 15 * | Examination | US5987557 | by applicant | US5987557 | EP1435557 |