blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2090698

EP2090698 - Water blockage, flood protection wall [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  23.07.2010
Database last updated on 19.10.2024
Most recent event   Tooltip23.07.2010Application deemed to be withdrawnpublished on 25.08.2010  [2010/34]
Applicant(s)For all designated states
Floecksmühle Energietechnik GmbH
Bachstrasse 62-64
52066 Aachen / DE
[2009/34]
Inventor(s)01 / Kessels, Norbert
Von-Blanckart-Straße 17
52477 Alsdorf / DE
02 / Dumont, Ulrich
Heydenstraße 25
52134 Herzogenrath / DE
 [2009/34]
Representative(s)Bauer, Dirk
Bauer Wagner Pellengahr Sroka
Patent- & Rechtsanwalts PartG mbB
Grüner Weg 1
52070 Aachen / DE
[N/P]
Former [2009/34]Bauer, Dirk
Bauer Wagner Priesmeyer Grüner Weg 1
52070 Aachen / DE
Application number, filing date09152425.610.02.2009
[2009/34]
Priority number, dateDE2008100951915.02.2008         Original published format: DE102008009519
[2009/34]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP2090698
Date:19.08.2009
Language:DE
[2009/34]
Search report(s)(Supplementary) European search report - dispatched on:EP29.05.2009
ClassificationIPC:E02B3/10, E02B7/44
[2009/34]
CPC:
E02B3/102 (EP)
Designated contracting states[2010/17]
Former [2009/34]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:Wasserabsperrung, insbesondere Hochwasserschutzwand[2009/34]
English:Water blockage, flood protection wall[2009/34]
French:Blocage de l'eau, notamment paroi de protection contre les montées d'eaux[2009/34]
Examination procedure20.02.2010Application deemed to be withdrawn, date of legal effect  [2010/34]
30.03.2010Despatch of communication that the application is deemed to be withdrawn, reason: examination fee not paid in time  [2010/34]
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[XY]DE3527100  (MEHLER AG V [DE]) [X] 1-3,5,6,9,14,15 * the whole document * [Y] 4,7,8,11;
 [X]DE2056356  (THESS W) [X] 1,3,5,6,9,11,13,15 * the whole document *;
 [YA]DE720038  (FISCHER ARNO) [Y] 7,8 * the whole document * [A] 12;
 [Y]JPS58199910  (SUMITOMO ELECTRIC INDUSTRIES) [Y] 4 * abstract *;
 [Y]US5222834  (SCHULTZ RICK W [US]) [Y] 7,8,11 * the whole document *;
 [DA]DE3401010  (GEWERK EISENHUETTE WESTFALIA [DE]) [DA] 1 * the whole document *
by applicantDE3001010
 DE3401010
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.