EP2136503 - Method for signaling of resource allocation to adjust granularity in a cellular multi-carrier system [Right-click to bookmark this link] | |||
Former [2009/52] | Method for signaling of resource allocation to adjust granularity in cellular multi-carrier system | ||
[2015/18] | Status | No opposition filed within time limit Status updated on 01.07.2016 Database last updated on 19.10.2024 | Most recent event Tooltip | 17.08.2018 | Lapse of the patent in a contracting state New state(s): BG | published on 19.09.2018 [2018/38] | Applicant(s) | For all designated states LG Electronics Inc. 128 Yeoui-daero Yeongdeungpo-Gu Seoul 150-721 / KR | [2015/35] |
Former [2009/52] | For all designated states LG Electronics Inc. 20 Yeouido-dong Yeongdeungpo-gu Seoul 150-721 / KR | Inventor(s) | 01 /
Seo, Dong Youn LG Institute, Hogye 1(il)-dong, Dongan-gu, Anyang-si 431-749, Gyeonggi-do / KR | 02 /
Lee, Jung Hoon LG Institute, Hogye 1(il)-dong Dongan-gu, Anyang-si 431-749, Gyeonggi-do / KR | 03 /
Kim, Ki Jun LG Institute, Hogye 1(il)-dong, Dongan-gu, Anyang-si 431-749, Gyeonggi-do / KR | 04 /
Ahn, Joon Kui LG Institute, Hogye 1(il)-dong, Dongan-gu, Anyang-si 431-749, Gyeonggi-do / KR | [2015/35] |
Former [2009/52] | 01 /
Seo, Dong Youn LG Institute, Hogye 1(il)-dong, Dongan-gu, Anyang-si 431-749, Gyeonggi-do / KR | ||
02 /
Lee, Jung Hoon LG Institute, Hogye 1(il)-dong Dongan-gu, Anyang-si 431-749, Gyeonggi-do / KR | |||
03 /
Kim, Ki Jun LG Institute, Hogye 1(il)-dong, Dongan-gu, Anyang-si 431-749, Gyeonggi-do / KR | |||
04 /
Ahn, Joon Kui LG Institute, Hogye 1(il)-dong, Dongan-gu, Anyang-si 431-749, Gyeonggi-do / KR | Representative(s) | Plasseraud IP 104 Rue de Richelieu CS92104 75080 Paris Cedex 02 / FR | [N/P] |
Former [2015/35] | Cabinet Plasseraud 52, rue de la Victoire 75440 Paris Cedex 09 / FR | ||
Former [2009/52] | Cabinet Plasseraud 52, rue de la Victoire 75440 Paris Cedex 09 / FR | Application number, filing date | 09157576.1 | 08.04.2009 | [2009/52] | Priority number, date | US20080074131P | 19.06.2008 Original published format: US 74131 P | US20080075010P | 24.06.2008 Original published format: US 75010 P | KR20080136669 | 30.12.2008 Original published format: KR 20080136669 | [2009/52] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2136503 | Date: | 23.12.2009 | Language: | EN | [2009/52] | Type: | A3 Search report | No.: | EP2136503 | Date: | 26.03.2014 | Language: | EN | [2014/13] | Type: | B1 Patent specification | No.: | EP2136503 | Date: | 26.08.2015 | Language: | EN | [2015/35] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 21.02.2014 | Classification | IPC: | H04L5/00, H04W72/04 | [2014/13] | CPC: |
H04L5/0007 (EP,US);
H04W72/04 (KR);
H04W72/23 (EP,US);
H04B7/0665 (US);
H04J11/00 (KR);
H04L5/0039 (EP,US);
H04L5/0092 (US);
H04L5/0094 (EP,US);
H04W16/10 (US);
H04W28/16 (KR);
H04W36/0066 (US);
H04W48/12 (US);
|
Former IPC [2009/52] | H04L5/00 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2015/35] |
Former [2009/52] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | Verfahren zur Signalisierung der Ressourcenzuweisung zur Einstellung der Granularität in einem zellulären Mehrträgersystem | [2009/52] | English: | Method for signaling of resource allocation to adjust granularity in a cellular multi-carrier system | [2015/18] | French: | Procédé pour la signalisation de l'affectation de ressources pour ajuster la granularité dans un système cellulaire multiporteuses | [2009/52] |
Former [2009/52] | Method for signaling of resource allocation to adjust granularity in cellular multi-carrier system | Examination procedure | 08.04.2009 | Examination requested [2009/52] | 21.05.2014 | Amendment by applicant (claims and/or description) | 22.08.2014 | Despatch of a communication from the examining division (Time limit: M04) | 29.12.2014 | Reply to a communication from the examining division | 02.04.2015 | Communication of intention to grant the patent | 20.07.2015 | Fee for grant paid | 20.07.2015 | Fee for publishing/printing paid | 20.07.2015 | Receipt of the translation of the claim(s) | Divisional application(s) | EP15174145.1 / EP2942898 | EP16164526.2 / EP3079297 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 22.08.2014 | Opposition(s) | 30.05.2016 | No opposition filed within time limit [2016/31] | Fees paid | Renewal fee | 28.03.2011 | Renewal fee patent year 03 | 23.03.2012 | Renewal fee patent year 04 | 22.04.2013 | Renewal fee patent year 05 | 25.03.2014 | Renewal fee patent year 06 | 21.04.2015 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 08.04.2009 | AT | 26.08.2015 | BE | 26.08.2015 | BG | 26.08.2015 | CY | 26.08.2015 | CZ | 26.08.2015 | DK | 26.08.2015 | EE | 26.08.2015 | HR | 26.08.2015 | LT | 26.08.2015 | LV | 26.08.2015 | MC | 26.08.2015 | MK | 26.08.2015 | PL | 26.08.2015 | RO | 26.08.2015 | SI | 26.08.2015 | SK | 26.08.2015 | TR | 26.08.2015 | NO | 26.11.2015 | GR | 27.11.2015 | IS | 26.12.2015 | PT | 28.12.2015 | IE | 08.04.2016 | LU | 08.04.2016 | MT | 30.04.2016 | [2018/38] |
Former [2018/32] | HU | 08.04.2009 | |
AT | 26.08.2015 | ||
BE | 26.08.2015 | ||
CY | 26.08.2015 | ||
CZ | 26.08.2015 | ||
DK | 26.08.2015 | ||
EE | 26.08.2015 | ||
HR | 26.08.2015 | ||
LT | 26.08.2015 | ||
LV | 26.08.2015 | ||
MC | 26.08.2015 | ||
MK | 26.08.2015 | ||
PL | 26.08.2015 | ||
RO | 26.08.2015 | ||
SI | 26.08.2015 | ||
SK | 26.08.2015 | ||
TR | 26.08.2015 | ||
NO | 26.11.2015 | ||
GR | 27.11.2015 | ||
IS | 26.12.2015 | ||
PT | 28.12.2015 | ||
IE | 08.04.2016 | ||
LU | 08.04.2016 | ||
MT | 30.04.2016 | ||
Former [2018/29] | HU | 08.04.2009 | |
AT | 26.08.2015 | ||
BE | 26.08.2015 | ||
CY | 26.08.2015 | ||
CZ | 26.08.2015 | ||
DK | 26.08.2015 | ||
EE | 26.08.2015 | ||
HR | 26.08.2015 | ||
LT | 26.08.2015 | ||
LV | 26.08.2015 | ||
MC | 26.08.2015 | ||
MK | 26.08.2015 | ||
PL | 26.08.2015 | ||
RO | 26.08.2015 | ||
SI | 26.08.2015 | ||
SK | 26.08.2015 | ||
TR | 26.08.2015 | ||
NO | 26.11.2015 | ||
GR | 27.11.2015 | ||
IS | 26.12.2015 | ||
PT | 28.12.2015 | ||
IE | 08.04.2016 | ||
LU | 08.04.2016 | ||
Former [2018/28] | HU | 08.04.2009 | |
AT | 26.08.2015 | ||
BE | 26.08.2015 | ||
CY | 26.08.2015 | ||
CZ | 26.08.2015 | ||
DK | 26.08.2015 | ||
EE | 26.08.2015 | ||
HR | 26.08.2015 | ||
LT | 26.08.2015 | ||
LV | 26.08.2015 | ||
MC | 26.08.2015 | ||
MK | 26.08.2015 | ||
PL | 26.08.2015 | ||
RO | 26.08.2015 | ||
SI | 26.08.2015 | ||
SK | 26.08.2015 | ||
NO | 26.11.2015 | ||
GR | 27.11.2015 | ||
IS | 26.12.2015 | ||
PT | 28.12.2015 | ||
IE | 08.04.2016 | ||
LU | 08.04.2016 | ||
Former [2017/38] | AT | 26.08.2015 | |
BE | 26.08.2015 | ||
CZ | 26.08.2015 | ||
DK | 26.08.2015 | ||
EE | 26.08.2015 | ||
HR | 26.08.2015 | ||
LT | 26.08.2015 | ||
LV | 26.08.2015 | ||
PL | 26.08.2015 | ||
RO | 26.08.2015 | ||
SI | 26.08.2015 | ||
SK | 26.08.2015 | ||
NO | 26.11.2015 | ||
GR | 27.11.2015 | ||
IS | 26.12.2015 | ||
PT | 28.12.2015 | ||
IE | 08.04.2016 | ||
LU | 08.04.2016 | ||
Former [2017/04] | AT | 26.08.2015 | |
BE | 26.08.2015 | ||
CZ | 26.08.2015 | ||
DK | 26.08.2015 | ||
EE | 26.08.2015 | ||
HR | 26.08.2015 | ||
LT | 26.08.2015 | ||
LV | 26.08.2015 | ||
PL | 26.08.2015 | ||
RO | 26.08.2015 | ||
SI | 26.08.2015 | ||
SK | 26.08.2015 | ||
NO | 26.11.2015 | ||
GR | 27.11.2015 | ||
IS | 26.12.2015 | ||
PT | 28.12.2015 | ||
LU | 08.04.2016 | ||
Former [2017/03] | AT | 26.08.2015 | |
BE | 26.08.2015 | ||
CZ | 26.08.2015 | ||
DK | 26.08.2015 | ||
EE | 26.08.2015 | ||
HR | 26.08.2015 | ||
LT | 26.08.2015 | ||
LV | 26.08.2015 | ||
PL | 26.08.2015 | ||
RO | 26.08.2015 | ||
SI | 26.08.2015 | ||
SK | 26.08.2015 | ||
NO | 26.11.2015 | ||
GR | 27.11.2015 | ||
IS | 26.12.2015 | ||
PT | 28.12.2015 | ||
Former [2016/36] | AT | 26.08.2015 | |
CZ | 26.08.2015 | ||
DK | 26.08.2015 | ||
EE | 26.08.2015 | ||
HR | 26.08.2015 | ||
LT | 26.08.2015 | ||
LV | 26.08.2015 | ||
PL | 26.08.2015 | ||
RO | 26.08.2015 | ||
SI | 26.08.2015 | ||
SK | 26.08.2015 | ||
NO | 26.11.2015 | ||
GR | 27.11.2015 | ||
IS | 26.12.2015 | ||
PT | 28.12.2015 | ||
BE | 30.04.2016 | ||
Former [2016/23] | AT | 26.08.2015 | |
CZ | 26.08.2015 | ||
DK | 26.08.2015 | ||
EE | 26.08.2015 | ||
HR | 26.08.2015 | ||
LT | 26.08.2015 | ||
LV | 26.08.2015 | ||
PL | 26.08.2015 | ||
RO | 26.08.2015 | ||
SK | 26.08.2015 | ||
NO | 26.11.2015 | ||
GR | 27.11.2015 | ||
IS | 26.12.2015 | ||
PT | 28.12.2015 | ||
Former [2016/22] | AT | 26.08.2015 | |
CZ | 26.08.2015 | ||
DK | 26.08.2015 | ||
EE | 26.08.2015 | ||
HR | 26.08.2015 | ||
LT | 26.08.2015 | ||
LV | 26.08.2015 | ||
PL | 26.08.2015 | ||
NO | 26.11.2015 | ||
GR | 27.11.2015 | ||
IS | 26.12.2015 | ||
PT | 28.12.2015 | ||
Former [2016/20] | AT | 26.08.2015 | |
DK | 26.08.2015 | ||
HR | 26.08.2015 | ||
LT | 26.08.2015 | ||
LV | 26.08.2015 | ||
PL | 26.08.2015 | ||
NO | 26.11.2015 | ||
GR | 27.11.2015 | ||
IS | 26.12.2015 | ||
PT | 28.12.2015 | ||
Former [2016/11] | AT | 26.08.2015 | |
HR | 26.08.2015 | ||
LT | 26.08.2015 | ||
LV | 26.08.2015 | ||
PL | 26.08.2015 | ||
NO | 26.11.2015 | ||
GR | 27.11.2015 | ||
IS | 26.12.2015 | ||
PT | 28.12.2015 | ||
Former [2016/10] | HR | 26.08.2015 | |
LT | 26.08.2015 | ||
LV | 26.08.2015 | ||
PL | 26.08.2015 | ||
NO | 26.11.2015 | ||
GR | 27.11.2015 | ||
IS | 26.12.2015 | ||
PT | 28.12.2015 | ||
Former [2016/09] | LT | 26.08.2015 | |
LV | 26.08.2015 | ||
NO | 26.11.2015 | ||
GR | 27.11.2015 | ||
Former [2016/08] | LT | 26.08.2015 | |
NO | 26.11.2015 | ||
Former [2016/07] | LT | 26.08.2015 | Documents cited: | Search | [A]WO2006137708 (SAMSUNG ELECTRONICS CO LTD [KR]) [A] 1-10 * abstract * * page 8, line 1 - line 8 * * paragraph [0067] - paragraph [0070] * * paragraph [0076] - paragraph [0079] * * figures 6, 8 *; | [A]WO2008054157 (LG ELECTRONICS INC [KR], et al) [A] 1-10 * abstract * * page 8, line 1 - line 8 * * page 32, line 14 - page 38, line 4 ** figures 10, 11 *; | [ID] - 3RD PARTNERSHIP PROJECT, "TS36.213 V8.3.0 E-UTRA Physical layer procedures", 3RD GENERATION PARTNERSHIP PROJECT (3GPP); TECHNICALSPECIFICATION (TS), XX, XX, (20080501), no. TS 36.213 V8.3.0, pages 1 - 45, XP002553984 [ID] 1-10 * paragraphs 7.1.6.3, 8.1 * |