EP2128958 - Current Breaking Method for Rechargeable Battery and Battery Pack Using the Same [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.02.2021 Database last updated on 22.05.2024 | |
Former | The patent has been granted Status updated on 06.03.2020 | ||
Former | Grant of patent is intended Status updated on 18.12.2019 | ||
Former | Examination is in progress Status updated on 15.03.2019 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Samsung SDI Co., Ltd. 673-7, Maetan-dong Yeongtong-gu Suwon-si Gyeonggi-do / KR | [2020/15] |
Former [2009/49] | For all designated states Samsung SDI Co., Ltd. 673-7, Maetan-dong Yeongtong-gu Suwon-si Gyeonggi-do / KR | Inventor(s) | 01 /
Lim, Sungbin c/o Legal & IP team Samsung SDI Co., Ltd. 673-7, Maetan-dong Yeongtong-gu Suwon-si, Gyeonggi-do / KR | [2020/15] |
Former [2009/49] | 01 /
Lim, Sungbin, Samsung SDI co., Ltd. Legal & IP team, 673-7, Maetan-dong, Yeongtong-gu Suwon-si, Gyeonggi-do / KR | Representative(s) | Walaski, Jan Filip, et al Venner Shipley LLP 200 Aldersgate London EC1A 4HD / GB | [2020/15] |
Former [2011/12] | Walaski, Jan Filip, et al Venner Shipley LLP 20 Little Britain London EC1A 7DH / GB | ||
Former [2009/49] | Perkins, Dawn Elizabeth, et al Venner Shipley LLP 20 Little Britain London EC1A 7DH / GB | Application number, filing date | 09158695.8 | 24.04.2009 | [2009/49] | Priority number, date | KR20080038888 | 25.04.2008 Original published format: KR 20080038888 | [2009/49] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2128958 | Date: | 02.12.2009 | Language: | EN | [2009/49] | Type: | A3 Search report | No.: | EP2128958 | Date: | 07.01.2015 | Language: | EN | [2015/02] | Type: | B1 Patent specification | No.: | EP2128958 | Date: | 08.04.2020 | Language: | EN | [2020/15] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 08.12.2014 | Classification | IPC: | H02J7/00, H02H3/087, // H02H3/093 | [2019/51] | CPC: |
H02J7/0031 (EP,KR,US);
H02H3/087 (EP,US);
H02J7/00309 (EP);
H02H3/0935 (EP,US);
H02J7/00304 (EP,KR,US)
|
Former IPC [2009/49] | H02J7/00 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2020/15] |
Former [2009/49] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | Stromabschaltungsverfahren für Akku und Batteriepack damit | [2009/49] | English: | Current Breaking Method for Rechargeable Battery and Battery Pack Using the Same | [2009/49] | French: | Procédé de coupure de courant pour batterie rechargeable et bloc-batterie l'utilisant | [2019/51] |
Former [2009/49] | Procédé de freinage du courant pour batterie rechargeable et bloc-batterie l'utilisant | Examination procedure | 24.04.2009 | Examination requested [2009/49] | 30.06.2015 | Amendment by applicant (claims and/or description) | 20.03.2019 | Despatch of a communication from the examining division (Time limit: M04) | 30.07.2019 | Reply to a communication from the examining division | 19.12.2019 | Communication of intention to grant the patent | 27.02.2020 | Fee for grant paid | 27.02.2020 | Fee for publishing/printing paid | 27.02.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 20.03.2019 | Opposition(s) | 12.01.2021 | No opposition filed within time limit [2021/11] | Fees paid | Renewal fee | 19.04.2011 | Renewal fee patent year 03 | 27.03.2012 | Renewal fee patent year 04 | 17.04.2013 | Renewal fee patent year 05 | 19.03.2014 | Renewal fee patent year 06 | 17.04.2015 | Renewal fee patent year 07 | 31.03.2016 | Renewal fee patent year 08 | 18.04.2017 | Renewal fee patent year 09 | 16.04.2018 | Renewal fee patent year 10 | 16.04.2019 | Renewal fee patent year 11 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 08.04.2020 | CZ | 08.04.2020 | DK | 08.04.2020 | EE | 08.04.2020 | ES | 08.04.2020 | FI | 08.04.2020 | HR | 08.04.2020 | IT | 08.04.2020 | LT | 08.04.2020 | LV | 08.04.2020 | MC | 08.04.2020 | MK | 08.04.2020 | MT | 08.04.2020 | NL | 08.04.2020 | RO | 08.04.2020 | SE | 08.04.2020 | SI | 08.04.2020 | SK | 08.04.2020 | TR | 08.04.2020 | IE | 24.04.2020 | LU | 24.04.2020 | BE | 30.04.2020 | CH | 30.04.2020 | LI | 30.04.2020 | BG | 08.07.2020 | NO | 08.07.2020 | GR | 09.07.2020 | IS | 08.08.2020 | PT | 17.08.2020 | [2022/32] |
Former [2022/27] | CY | 08.04.2020 | |
CZ | 08.04.2020 | ||
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
MT | 08.04.2020 | ||
NL | 08.04.2020 | ||
RO | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
TR | 08.04.2020 | ||
IE | 24.04.2020 | ||
LU | 24.04.2020 | ||
BE | 30.04.2020 | ||
CH | 30.04.2020 | ||
LI | 30.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2022/26] | CZ | 08.04.2020 | |
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
RO | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
TR | 08.04.2020 | ||
IE | 24.04.2020 | ||
LU | 24.04.2020 | ||
BE | 30.04.2020 | ||
CH | 30.04.2020 | ||
LI | 30.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/24] | CZ | 08.04.2020 | |
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
RO | 08.04.2020 | ||
SE | 08.04.2020 | ||
SI | 08.04.2020 | ||
SK | 08.04.2020 | ||
IE | 24.04.2020 | ||
LU | 24.04.2020 | ||
BE | 30.04.2020 | ||
CH | 30.04.2020 | ||
LI | 30.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/20] | CZ | 08.04.2020 | |
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
RO | 08.04.2020 | ||
SE | 08.04.2020 | ||
SK | 08.04.2020 | ||
IE | 24.04.2020 | ||
LU | 24.04.2020 | ||
BE | 30.04.2020 | ||
CH | 30.04.2020 | ||
LI | 30.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/10] | CZ | 08.04.2020 | |
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
RO | 08.04.2020 | ||
SE | 08.04.2020 | ||
SK | 08.04.2020 | ||
LU | 24.04.2020 | ||
BE | 30.04.2020 | ||
CH | 30.04.2020 | ||
LI | 30.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/09] | CZ | 08.04.2020 | |
DK | 08.04.2020 | ||
EE | 08.04.2020 | ||
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
IT | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
MC | 08.04.2020 | ||
NL | 08.04.2020 | ||
RO | 08.04.2020 | ||
SE | 08.04.2020 | ||
LU | 24.04.2020 | ||
CH | 30.04.2020 | ||
LI | 30.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/08] | DK | 08.04.2020 | |
ES | 08.04.2020 | ||
FI | 08.04.2020 | ||
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
RO | 08.04.2020 | ||
SE | 08.04.2020 | ||
LU | 24.04.2020 | ||
CH | 30.04.2020 | ||
LI | 30.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2021/01] | FI | 08.04.2020 | |
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
SE | 08.04.2020 | ||
BG | 08.07.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/50] | FI | 08.04.2020 | |
HR | 08.04.2020 | ||
LT | 08.04.2020 | ||
LV | 08.04.2020 | ||
NL | 08.04.2020 | ||
SE | 08.04.2020 | ||
NO | 08.07.2020 | ||
GR | 09.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/48] | FI | 08.04.2020 | |
LT | 08.04.2020 | ||
NL | 08.04.2020 | ||
SE | 08.04.2020 | ||
NO | 08.07.2020 | ||
IS | 08.08.2020 | ||
PT | 17.08.2020 | ||
Former [2020/47] | LT | 08.04.2020 | |
NO | 08.07.2020 | ||
IS | 08.08.2020 | ||
Former [2020/46] | IS | 08.08.2020 | Documents cited: | Search | [XI]US5764033 (TAMAI MIKITAKA [JP]) [X] 1,2,5,6,11,12,14 * column 1, lines 35-50 * * column 3, lines 10-45 * * column 4, lines 1-10 * [I] 3,4,7,10,13; | [A]EP0783200 (CHARTEC LAB AS [DK]) [A] 1-15 * the whole document * | Examination | JP2002204534 |