EP2128972 - High efficiency multi-source photovoltaic inverter [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 24.05.2019 Database last updated on 26.06.2024 | |
Former | The patent has been granted Status updated on 15.06.2018 | ||
Former | Grant of patent is intended Status updated on 06.03.2018 | ||
Former | Examination is in progress Status updated on 07.04.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states General Electric Company 1 River Road Schenectady, NY 12345 / US | [2018/29] |
Former [2009/49] | For all designated states General Electric Company 1 River Road Schenectady, NY 12345 / US | Inventor(s) | 01 /
De Rooij, Michael Andrew 1814 Eastern Parkway Schenectady, NY 12309 / US | 02 /
Glaser, John Stanley 1361 Wemple Lane Niskayuna, NY 12309 / US | [2018/29] |
Former [2009/49] | 01 /
De Rooij, Michael Andrew 1814 Eastern Parkway Schenectady, NY 12309 / US | ||
02 /
Glaser, John Stanley 1361 Wemple Lane Niskayuna, NY 12309 / US | Representative(s) | Dennemeyer & Associates S.A. Landaubogen 1-3 81373 München / DE | [N/P] |
Former [2018/29] | Brannen, Joseph Waclaw, et al Global Patent Operation - Europe GE International Inc. The Ark 201 Talgarth Road Hammersmith London W6 8BJ / GB | ||
Former [2009/49] | Bedford, Grant Richard GE INTERNATIONAL INC 15 John Adam Street London WC2N 6LU / GB | Application number, filing date | 09160660.8 | 19.05.2009 | [2009/49] | Priority number, date | US20080154745 | 27.05.2008 Original published format: US 154745 | [2009/49] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2128972 | Date: | 02.12.2009 | Language: | EN | [2009/49] | Type: | A3 Search report | No.: | EP2128972 | Date: | 29.07.2015 | Language: | EN | [2015/31] | Type: | B1 Patent specification | No.: | EP2128972 | Date: | 18.07.2018 | Language: | EN | [2018/29] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 25.06.2015 | Classification | IPC: | H02J3/38, H02M1/00, H02M3/158, H02M3/335, H02M7/48 | [2015/31] | CPC: |
H02M7/53871 (EP,US);
H02J3/381 (EP,US);
H02J2300/24 (EP,US);
H02M1/0054 (EP,US);
H02M1/007 (EP,US);
H02M1/0093 (EP,US);
|
Former IPC [2009/49] | H02M7/48 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2016/10] |
Former [2009/49] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | Hocheffizienter Mehrquellen-Photovoltaikumkehrer | [2009/49] | English: | High efficiency multi-source photovoltaic inverter | [2009/49] | French: | Inverseur photovoltaïque multi-source haute efficacité | [2009/49] | Examination procedure | 27.01.2016 | Amendment by applicant (claims and/or description) | 29.01.2016 | Examination requested [2016/10] | 06.04.2017 | Despatch of a communication from the examining division (Time limit: M06) | 16.10.2017 | Reply to a communication from the examining division | 07.03.2018 | Communication of intention to grant the patent | 11.06.2018 | Fee for grant paid | 11.06.2018 | Fee for publishing/printing paid | 11.06.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 06.04.2017 | Opposition(s) | 23.04.2019 | No opposition filed within time limit [2019/26] | Fees paid | Renewal fee | 31.05.2011 | Renewal fee patent year 03 | 31.05.2012 | Renewal fee patent year 04 | 31.05.2013 | Renewal fee patent year 05 | 12.06.2014 | Renewal fee patent year 06 | 01.06.2015 | Renewal fee patent year 07 | 31.05.2016 | Renewal fee patent year 08 | 31.05.2017 | Renewal fee patent year 09 | 01.06.2018 | Renewal fee patent year 10 | Penalty fee | Additional fee for renewal fee | 18.07.2014 | 06   M02   Fee paid on   30.09.2014 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 19.05.2009 | AT | 18.07.2018 | CY | 18.07.2018 | CZ | 18.07.2018 | DK | 18.07.2018 | EE | 18.07.2018 | FI | 18.07.2018 | HR | 18.07.2018 | LT | 18.07.2018 | LV | 18.07.2018 | MC | 18.07.2018 | MK | 18.07.2018 | MT | 18.07.2018 | NL | 18.07.2018 | PL | 18.07.2018 | RO | 18.07.2018 | SE | 18.07.2018 | SI | 18.07.2018 | SK | 18.07.2018 | BG | 18.10.2018 | NO | 18.10.2018 | GR | 19.10.2018 | IS | 18.11.2018 | PT | 18.11.2018 | [2022/31] |
Former [2021/34] | HU | 19.05.2009 | |
AT | 18.07.2018 | ||
CY | 18.07.2018 | ||
CZ | 18.07.2018 | ||
DK | 18.07.2018 | ||
EE | 18.07.2018 | ||
FI | 18.07.2018 | ||
HR | 18.07.2018 | ||
LT | 18.07.2018 | ||
LV | 18.07.2018 | ||
MC | 18.07.2018 | ||
MT | 18.07.2018 | ||
NL | 18.07.2018 | ||
PL | 18.07.2018 | ||
RO | 18.07.2018 | ||
SE | 18.07.2018 | ||
SI | 18.07.2018 | ||
SK | 18.07.2018 | ||
BG | 18.10.2018 | ||
NO | 18.10.2018 | ||
GR | 19.10.2018 | ||
IS | 18.11.2018 | ||
PT | 18.11.2018 | ||
Former [2021/32] | HU | 19.05.2009 | |
AT | 18.07.2018 | ||
CY | 18.07.2018 | ||
CZ | 18.07.2018 | ||
DK | 18.07.2018 | ||
EE | 18.07.2018 | ||
FI | 18.07.2018 | ||
HR | 18.07.2018 | ||
LT | 18.07.2018 | ||
LV | 18.07.2018 | ||
MC | 18.07.2018 | ||
NL | 18.07.2018 | ||
PL | 18.07.2018 | ||
RO | 18.07.2018 | ||
SE | 18.07.2018 | ||
SI | 18.07.2018 | ||
SK | 18.07.2018 | ||
BG | 18.10.2018 | ||
NO | 18.10.2018 | ||
GR | 19.10.2018 | ||
IS | 18.11.2018 | ||
PT | 18.11.2018 | ||
Former [2021/26] | AT | 18.07.2018 | |
CY | 18.07.2018 | ||
CZ | 18.07.2018 | ||
DK | 18.07.2018 | ||
EE | 18.07.2018 | ||
FI | 18.07.2018 | ||
HR | 18.07.2018 | ||
LT | 18.07.2018 | ||
LV | 18.07.2018 | ||
MC | 18.07.2018 | ||
NL | 18.07.2018 | ||
PL | 18.07.2018 | ||
RO | 18.07.2018 | ||
SE | 18.07.2018 | ||
SI | 18.07.2018 | ||
SK | 18.07.2018 | ||
BG | 18.10.2018 | ||
NO | 18.10.2018 | ||
GR | 19.10.2018 | ||
IS | 18.11.2018 | ||
PT | 18.11.2018 | ||
Former [2020/29] | AT | 18.07.2018 | |
CZ | 18.07.2018 | ||
DK | 18.07.2018 | ||
EE | 18.07.2018 | ||
FI | 18.07.2018 | ||
HR | 18.07.2018 | ||
LT | 18.07.2018 | ||
LV | 18.07.2018 | ||
MC | 18.07.2018 | ||
NL | 18.07.2018 | ||
PL | 18.07.2018 | ||
RO | 18.07.2018 | ||
SE | 18.07.2018 | ||
SI | 18.07.2018 | ||
SK | 18.07.2018 | ||
BG | 18.10.2018 | ||
NO | 18.10.2018 | ||
GR | 19.10.2018 | ||
IS | 18.11.2018 | ||
PT | 18.11.2018 | ||
Former [2020/07] | AT | 18.07.2018 | |
CZ | 18.07.2018 | ||
DK | 18.07.2018 | ||
EE | 18.07.2018 | ||
FI | 18.07.2018 | ||
HR | 18.07.2018 | ||
LT | 18.07.2018 | ||
LV | 18.07.2018 | ||
MC | 18.07.2018 | ||
NL | 18.07.2018 | ||
PL | 18.07.2018 | ||
RO | 18.07.2018 | ||
SE | 18.07.2018 | ||
SI | 18.07.2018 | ||
SK | 18.07.2018 | ||
BG | 18.10.2018 | ||
NO | 18.10.2018 | ||
GR | 19.10.2018 | ||
IS | 18.11.2018 | ||
Former [2019/37] | AT | 18.07.2018 | |
CZ | 18.07.2018 | ||
DK | 18.07.2018 | ||
EE | 18.07.2018 | ||
FI | 18.07.2018 | ||
HR | 18.07.2018 | ||
LT | 18.07.2018 | ||
LV | 18.07.2018 | ||
NL | 18.07.2018 | ||
PL | 18.07.2018 | ||
RO | 18.07.2018 | ||
SE | 18.07.2018 | ||
SI | 18.07.2018 | ||
SK | 18.07.2018 | ||
BG | 18.10.2018 | ||
NO | 18.10.2018 | ||
GR | 19.10.2018 | ||
IS | 18.11.2018 | ||
Former [2019/26] | AT | 18.07.2018 | |
CZ | 18.07.2018 | ||
DK | 18.07.2018 | ||
EE | 18.07.2018 | ||
FI | 18.07.2018 | ||
HR | 18.07.2018 | ||
LT | 18.07.2018 | ||
LV | 18.07.2018 | ||
NL | 18.07.2018 | ||
PL | 18.07.2018 | ||
RO | 18.07.2018 | ||
SE | 18.07.2018 | ||
SK | 18.07.2018 | ||
BG | 18.10.2018 | ||
NO | 18.10.2018 | ||
GR | 19.10.2018 | ||
IS | 18.11.2018 | ||
Former [2019/24] | AT | 18.07.2018 | |
CZ | 18.07.2018 | ||
EE | 18.07.2018 | ||
FI | 18.07.2018 | ||
HR | 18.07.2018 | ||
LT | 18.07.2018 | ||
LV | 18.07.2018 | ||
NL | 18.07.2018 | ||
PL | 18.07.2018 | ||
RO | 18.07.2018 | ||
SE | 18.07.2018 | ||
SK | 18.07.2018 | ||
BG | 18.10.2018 | ||
NO | 18.10.2018 | ||
GR | 19.10.2018 | ||
IS | 18.11.2018 | ||
Former [2019/22] | AT | 18.07.2018 | |
CZ | 18.07.2018 | ||
FI | 18.07.2018 | ||
HR | 18.07.2018 | ||
LT | 18.07.2018 | ||
LV | 18.07.2018 | ||
NL | 18.07.2018 | ||
PL | 18.07.2018 | ||
RO | 18.07.2018 | ||
SE | 18.07.2018 | ||
BG | 18.10.2018 | ||
NO | 18.10.2018 | ||
GR | 19.10.2018 | ||
IS | 18.11.2018 | ||
Former [2019/12] | AT | 18.07.2018 | |
FI | 18.07.2018 | ||
HR | 18.07.2018 | ||
LT | 18.07.2018 | ||
LV | 18.07.2018 | ||
NL | 18.07.2018 | ||
PL | 18.07.2018 | ||
SE | 18.07.2018 | ||
BG | 18.10.2018 | ||
NO | 18.10.2018 | ||
GR | 19.10.2018 | ||
IS | 18.11.2018 | ||
Former [2019/11] | AT | 18.07.2018 | |
FI | 18.07.2018 | ||
HR | 18.07.2018 | ||
LT | 18.07.2018 | ||
NL | 18.07.2018 | ||
PL | 18.07.2018 | ||
SE | 18.07.2018 | ||
BG | 18.10.2018 | ||
NO | 18.10.2018 | ||
GR | 19.10.2018 | ||
IS | 18.11.2018 | ||
Former [2019/10] | AT | 18.07.2018 | |
FI | 18.07.2018 | ||
LT | 18.07.2018 | ||
NL | 18.07.2018 | ||
PL | 18.07.2018 | ||
SE | 18.07.2018 | ||
BG | 18.10.2018 | ||
NO | 18.10.2018 | ||
GR | 19.10.2018 | ||
IS | 18.11.2018 | ||
Former [2019/08] | FI | 18.07.2018 | |
LT | 18.07.2018 | ||
NL | 18.07.2018 | ||
NO | 18.10.2018 | ||
IS | 18.11.2018 | ||
Former [2019/07] | LT | 18.07.2018 | |
NL | 18.07.2018 | ||
Former [2019/04] | NL | 18.07.2018 | Documents cited: | Search | [A]US5786990 (MARRERO JOSEPH [US]) [A] 1-10 * abstract * * column 13, line 38 - column 16, line 7; figures 6,7 *; | [I]JP2004104963 (MATSUSHITA ELECTRIC IND CO LTD) [I] 1-10 * abstract * * paragraphs [0001] , [0 14] , [0 18] , [0 23] - [0028]; figures 1-7 *; | [A]WO2006032694 (SIEMENS AG OESTERREICH [AT], et al) [A] 1-10 * the whole document *; | [A] - SCHUTTEN M J ET AL, "Ripple current cancellation circuit", APEC 2003. 18TH. ANNUAL IEEE APPLIED POWER ELECTRONICS CONFERENCE AND EXPOSITION. MIAMI BEACH, FL, FEB. 9 - 13, 2003; [ANNUAL APPLIED POWER ELECTRONICS CONFERENCE], NEW YORK, NY : IEEE, US, (20030209), doi:10.1109/APEC.2003.1179254, ISBN 978-0-7803-7768-4, pages 464 - 470vol.1, XP032155940 [A] 1-10 * the whole document * DOI: http://dx.doi.org/10.1109/APEC.2003.1179254 |