EP2169800 - Power generation system and method for storing electrical energy [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.06.2023 Database last updated on 30.10.2024 | |
Former | The patent has been granted Status updated on 24.06.2022 | ||
Former | Grant of patent is intended Status updated on 27.02.2022 | ||
Former | Examination is in progress Status updated on 16.11.2018 | ||
Former | Request for examination was made Status updated on 16.12.2016 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states General Electric Company 1 River Road Schenectady, NY 12345 / US | [2022/30] |
Former [2010/13] | For all designated states General Electric Company 1 River Road Schenectady, NY 12345 / US | Inventor(s) | 01 /
Altenschulte, Markus Ringstrasse 39 D-48480, Spelle / DE | [2022/30] |
Former [2010/13] | 01 /
Altenschulte, Markus Ringstrasse 39 D-48480, Spelle / DE | Representative(s) | Openshaw & Co. 8 Castle Street Farnham, Surrey GU9 7HR / GB | [2022/30] |
Former [2010/13] | Bedford, Grant Richard GE International Inc. Global Patent Operation - Europe 15 John Adam street London WC2N 6LU / GB | Application number, filing date | 09170915.4 | 22.09.2009 | [2010/13] | Priority number, date | US20080241951 | 30.09.2008 Original published format: US 241951 | [2010/13] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2169800 | Date: | 31.03.2010 | Language: | EN | [2010/13] | Type: | A3 Search report | No.: | EP2169800 | Date: | 08.06.2016 | Language: | EN | [2016/23] | Type: | B1 Patent specification | No.: | EP2169800 | Date: | 27.07.2022 | Language: | EN | [2022/30] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 09.05.2016 | Classification | IPC: | H02J3/38, H02J7/34 | [2010/13] | CPC: |
H02J7/34 (EP,US);
H02J3/381 (EP,US);
H02J2300/28 (EP,US);
Y02E10/72 (US);
Y02E10/76 (US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2017/03] |
Former [2010/13] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR | Title | German: | Stromerzeugungssystem und Verfahren zur Speicherung von elektrischer Energie | [2010/13] | English: | Power generation system and method for storing electrical energy | [2010/13] | French: | Système de génération d'électricité et procédé de stockage d'énergie électrique | [2010/13] | Examination procedure | 22.09.2009 | Date on which the examining division has become responsible | 07.12.2016 | Amendment by applicant (claims and/or description) | 08.12.2016 | Examination requested [2017/03] | 19.11.2018 | Despatch of a communication from the examining division (Time limit: M06) | 17.05.2019 | Reply to a communication from the examining division | 13.10.2020 | Date of oral proceedings | 20.10.2020 | Minutes of oral proceedings despatched | 22.10.2020 | Despatch of a communication from the examining division (Time limit: M06) | 30.04.2021 | Reply to a communication from the examining division | 28.02.2022 | Communication of intention to grant the patent | 17.06.2022 | Fee for grant paid | 17.06.2022 | Fee for publishing/printing paid | 17.06.2022 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 19.11.2018 | Opposition(s) | 02.05.2023 | No opposition filed within time limit [2023/27] | Fees paid | Renewal fee | 30.09.2011 | Renewal fee patent year 03 | 01.10.2012 | Renewal fee patent year 04 | 30.09.2013 | Renewal fee patent year 05 | 30.09.2014 | Renewal fee patent year 06 | 30.09.2015 | Renewal fee patent year 07 | 30.09.2016 | Renewal fee patent year 08 | 02.10.2017 | Renewal fee patent year 09 | 01.10.2018 | Renewal fee patent year 10 | 19.09.2019 | Renewal fee patent year 11 | 17.09.2020 | Renewal fee patent year 12 | 21.09.2021 | Renewal fee patent year 13 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.09.2009 | AT | 27.07.2022 | BG | 27.07.2022 | CY | 27.07.2022 | CZ | 27.07.2022 | DK | 27.07.2022 | EE | 27.07.2022 | FI | 27.07.2022 | HR | 27.07.2022 | IT | 27.07.2022 | LT | 27.07.2022 | LV | 27.07.2022 | MC | 27.07.2022 | MK | 27.07.2022 | MT | 27.07.2022 | NL | 27.07.2022 | PL | 27.07.2022 | RO | 27.07.2022 | SE | 27.07.2022 | SI | 27.07.2022 | SK | 27.07.2022 | SM | 27.07.2022 | TR | 27.07.2022 | LU | 22.09.2022 | BE | 30.09.2022 | CH | 30.09.2022 | LI | 30.09.2022 | NO | 27.10.2022 | GR | 28.10.2022 | IS | 27.11.2022 | PT | 28.11.2022 | [2024/41] |
Former [2024/34] | HU | 22.09.2009 | |
AT | 27.07.2022 | ||
BG | 27.07.2022 | ||
CY | 27.07.2022 | ||
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
IT | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
MC | 27.07.2022 | ||
MK | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
SE | 27.07.2022 | ||
SI | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
TR | 27.07.2022 | ||
LU | 22.09.2022 | ||
BE | 30.09.2022 | ||
CH | 30.09.2022 | ||
LI | 30.09.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2024/29] | HU | 22.09.2009 | |
AT | 27.07.2022 | ||
CY | 27.07.2022 | ||
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
IT | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
MC | 27.07.2022 | ||
MK | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
SE | 27.07.2022 | ||
SI | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
TR | 27.07.2022 | ||
LU | 22.09.2022 | ||
BE | 30.09.2022 | ||
CH | 30.09.2022 | ||
LI | 30.09.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2024/27] | HU | 22.09.2009 | |
AT | 27.07.2022 | ||
CY | 27.07.2022 | ||
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
IT | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
MC | 27.07.2022 | ||
MK | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
SE | 27.07.2022 | ||
SI | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
LU | 22.09.2022 | ||
BE | 30.09.2022 | ||
CH | 30.09.2022 | ||
LI | 30.09.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2024/26] | HU | 22.09.2009 | |
AT | 27.07.2022 | ||
CY | 27.07.2022 | ||
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
IT | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
MC | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
SE | 27.07.2022 | ||
SI | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
LU | 22.09.2022 | ||
BE | 30.09.2022 | ||
CH | 30.09.2022 | ||
LI | 30.09.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2024/21] | HU | 22.09.2009 | |
AT | 27.07.2022 | ||
CY | 27.07.2022 | ||
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
MC | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
SE | 27.07.2022 | ||
SI | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
LU | 22.09.2022 | ||
BE | 30.09.2022 | ||
CH | 30.09.2022 | ||
LI | 30.09.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2024/18] | HU | 22.09.2009 | |
AT | 27.07.2022 | ||
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
MC | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
SE | 27.07.2022 | ||
SI | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
LU | 22.09.2022 | ||
BE | 30.09.2022 | ||
CH | 30.09.2022 | ||
LI | 30.09.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2023/42] | AT | 27.07.2022 | |
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
MC | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
SE | 27.07.2022 | ||
SI | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
LU | 22.09.2022 | ||
BE | 30.09.2022 | ||
CH | 30.09.2022 | ||
LI | 30.09.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2023/37] | AT | 27.07.2022 | |
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
MC | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
SE | 27.07.2022 | ||
SI | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
LU | 22.09.2022 | ||
CH | 30.09.2022 | ||
LI | 30.09.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2023/35] | AT | 27.07.2022 | |
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
MC | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
SE | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
LU | 22.09.2022 | ||
CH | 30.09.2022 | ||
LI | 30.09.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2023/30] | AT | 27.07.2022 | |
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
MC | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
SE | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
LU | 22.09.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2023/23] | AT | 27.07.2022 | |
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
EE | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
MC | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
SE | 27.07.2022 | ||
SK | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2023/22] | AT | 27.07.2022 | |
CZ | 27.07.2022 | ||
DK | 27.07.2022 | ||
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
MC | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
RO | 27.07.2022 | ||
SE | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2023/21] | DK | 27.07.2022 | |
FI | 27.07.2022 | ||
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
SE | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2023/20] | FI | 27.07.2022 | |
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
SE | 27.07.2022 | ||
SM | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2023/12] | FI | 27.07.2022 | |
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
SE | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
IS | 27.11.2022 | ||
PT | 28.11.2022 | ||
Former [2023/11] | FI | 27.07.2022 | |
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
PL | 27.07.2022 | ||
SE | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
PT | 28.11.2022 | ||
Former [2023/10] | FI | 27.07.2022 | |
HR | 27.07.2022 | ||
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
SE | 27.07.2022 | ||
NO | 27.10.2022 | ||
GR | 28.10.2022 | ||
PT | 28.11.2022 | ||
Former [2023/09] | FI | 27.07.2022 | |
LT | 27.07.2022 | ||
LV | 27.07.2022 | ||
NL | 27.07.2022 | ||
SE | 27.07.2022 | ||
NO | 27.10.2022 | ||
PT | 28.11.2022 | ||
Former [2023/08] | FI | 27.07.2022 | |
LT | 27.07.2022 | ||
NL | 27.07.2022 | ||
SE | 27.07.2022 | ||
NO | 27.10.2022 | ||
Former [2023/06] | NL | 27.07.2022 | Documents cited: | Search | [I]JP2001145396 (MEIDENSHA ELECTRIC MFG CO LTD) [I] 1,9 * abstract * * claim - ** figures 1,4 *; | [I]US6487096 (GILBRETH MARK [US], et al) [I] 1-10 * abstract * * figures 1-4,13,17 * * column 2, line 55 - column 4, line 30 *; | [I]WO03023933 (MADE TECNOLOGIAS RENOVABLES S [ES], et al) [I] 1-10 * abstract * * figure 2 *; | [I]EP1667309 (HONDA MOTOR CO LTD [JP]) [I] 1-10 * abstract * * figures 1,3 * | Examination | WO2004059814 | US2005012339 | EP1772939 |