EP2276187 - Method of dynamically adjusting transmission capacity of a data transmission connection [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.07.2012 Database last updated on 08.10.2024 | Most recent event Tooltip | 18.07.2014 | Lapse of the patent in a contracting state New state(s): HU | published on 20.08.2014 [2014/34] | Applicant(s) | For all designated states Alcatel Lucent 3, avenue Octave Gréard 75007 Paris / FR | [N/P] |
Former [2012/08] | For all designated states Alcatel Lucent 3 avenue Octave Gréard 75007 Paris / FR | ||
Former [2011/03] | For all designated states Alcatel Lucent 54, rue la Boétie 75008 Paris / FR | Inventor(s) | 01 /
Bellato, Alberto Via Cristoforo Colombo 13 20044 Bernareggio (Milano) / IT | 02 /
Gumier, Matteo Via Bileas, 4 21018 Sesto Calende / IT | 03 /
Fogliata, Paolo Via Dalla Chiesa, 19 25032 Chiari / IT | [2011/13] |
Former [2011/03] | 01 /
Bellato, Alberto Via Cristoforo Colombo 13 20044 Bernareggio (Milano) / IT | Representative(s) | Urlichs, Stefan, et al Alcatel Lucent Intellectual Property & Corporate Standards Lorenzstrasse 10 70435 Stuttgart / DE | [N/P] |
Former [2011/03] | Urlichs, Stefan, et al Alcatel Lucent Intellectual Property & Corporate Standards Lorenzstrasse 10 70435 Stuttgart / DE | Application number, filing date | 09305595.2 | 24.06.2009 | [2011/03] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP2276187 | Date: | 19.01.2011 | Language: | EN | [2011/03] | Type: | B1 Patent specification | No.: | EP2276187 | Date: | 07.09.2011 | Language: | EN | [2011/36] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 06.11.2009 | Classification | IPC: | H04J3/16 | [2011/03] | CPC: |
H04J3/1611 (EP,US);
H04L5/22 (KR);
H04J3/16 (KR);
H04J3/1652 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2011/03] | Title | German: | Verfahren zur dynamischen Einstellung der Übertragungskapazität einer Datenübertragungsverbindung | [2011/03] | English: | Method of dynamically adjusting transmission capacity of a data transmission connection | [2011/03] | French: | Procédé pour régler dynamiquement la capacité de transmission d'une connexion de transmission de données | [2011/03] | Examination procedure | 21.04.2010 | Amendment by applicant (claims and/or description) | 21.04.2010 | Examination requested [2011/03] | 07.03.2011 | Communication of intention to grant the patent | 07.06.2011 | Fee for grant paid | 07.06.2011 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 07.03.2011 | Opposition(s) | 11.06.2012 | No opposition filed within time limit [2012/33] | Fees paid | Renewal fee | 22.06.2011 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 24.06.2009 | AT | 07.09.2011 | BE | 07.09.2011 | CY | 07.09.2011 | CZ | 07.09.2011 | DK | 07.09.2011 | EE | 07.09.2011 | FI | 07.09.2011 | HR | 07.09.2011 | IT | 07.09.2011 | LT | 07.09.2011 | LV | 07.09.2011 | MK | 07.09.2011 | MT | 07.09.2011 | NL | 07.09.2011 | PL | 07.09.2011 | RO | 07.09.2011 | SE | 07.09.2011 | SI | 07.09.2011 | SK | 07.09.2011 | TR | 07.09.2011 | BG | 07.12.2011 | NO | 07.12.2011 | GR | 08.12.2011 | ES | 18.12.2011 | IS | 07.01.2012 | PT | 09.01.2012 | [2014/34] |
Former [2014/21] | AT | 07.09.2011 | |
BE | 07.09.2011 | ||
CY | 07.09.2011 | ||
CZ | 07.09.2011 | ||
DK | 07.09.2011 | ||
EE | 07.09.2011 | ||
FI | 07.09.2011 | ||
HR | 07.09.2011 | ||
IT | 07.09.2011 | ||
LT | 07.09.2011 | ||
LV | 07.09.2011 | ||
MK | 07.09.2011 | ||
MT | 07.09.2011 | ||
NL | 07.09.2011 | ||
PL | 07.09.2011 | ||
RO | 07.09.2011 | ||
SE | 07.09.2011 | ||
SI | 07.09.2011 | ||
SK | 07.09.2011 | ||
TR | 07.09.2011 | ||
BG | 07.12.2011 | ||
NO | 07.12.2011 | ||
GR | 08.12.2011 | ||
ES | 18.12.2011 | ||
IS | 07.01.2012 | ||
PT | 09.01.2012 | ||
Former [2013/35] | AT | 07.09.2011 | |
BE | 07.09.2011 | ||
CY | 07.09.2011 | ||
CZ | 07.09.2011 | ||
DK | 07.09.2011 | ||
EE | 07.09.2011 | ||
FI | 07.09.2011 | ||
HR | 07.09.2011 | ||
IT | 07.09.2011 | ||
LT | 07.09.2011 | ||
LV | 07.09.2011 | ||
MK | 07.09.2011 | ||
MT | 07.09.2011 | ||
NL | 07.09.2011 | ||
PL | 07.09.2011 | ||
RO | 07.09.2011 | ||
SE | 07.09.2011 | ||
SI | 07.09.2011 | ||
SK | 07.09.2011 | ||
BG | 07.12.2011 | ||
NO | 07.12.2011 | ||
GR | 08.12.2011 | ||
ES | 18.12.2011 | ||
IS | 07.01.2012 | ||
PT | 09.01.2012 | ||
Former [2013/29] | AT | 07.09.2011 | |
BE | 07.09.2011 | ||
CY | 07.09.2011 | ||
CZ | 07.09.2011 | ||
DK | 07.09.2011 | ||
EE | 07.09.2011 | ||
FI | 07.09.2011 | ||
HR | 07.09.2011 | ||
IT | 07.09.2011 | ||
LT | 07.09.2011 | ||
LV | 07.09.2011 | ||
MK | 07.09.2011 | ||
NL | 07.09.2011 | ||
PL | 07.09.2011 | ||
RO | 07.09.2011 | ||
SE | 07.09.2011 | ||
SI | 07.09.2011 | ||
SK | 07.09.2011 | ||
BG | 07.12.2011 | ||
NO | 07.12.2011 | ||
GR | 08.12.2011 | ||
ES | 18.12.2011 | ||
IS | 07.01.2012 | ||
PT | 09.01.2012 | ||
Former [2013/22] | AT | 07.09.2011 | |
BE | 07.09.2011 | ||
CY | 07.09.2011 | ||
CZ | 07.09.2011 | ||
DK | 07.09.2011 | ||
EE | 07.09.2011 | ||
FI | 07.09.2011 | ||
HR | 07.09.2011 | ||
IT | 07.09.2011 | ||
LT | 07.09.2011 | ||
LV | 07.09.2011 | ||
MK | 07.09.2011 | ||
NL | 07.09.2011 | ||
PL | 07.09.2011 | ||
RO | 07.09.2011 | ||
SE | 07.09.2011 | ||
SI | 07.09.2011 | ||
SK | 07.09.2011 | ||
NO | 07.12.2011 | ||
GR | 08.12.2011 | ||
ES | 18.12.2011 | ||
IS | 07.01.2012 | ||
PT | 09.01.2012 | ||
Former [2013/12] | AT | 07.09.2011 | |
BE | 07.09.2011 | ||
CY | 07.09.2011 | ||
CZ | 07.09.2011 | ||
DK | 07.09.2011 | ||
EE | 07.09.2011 | ||
FI | 07.09.2011 | ||
HR | 07.09.2011 | ||
IT | 07.09.2011 | ||
LT | 07.09.2011 | ||
LV | 07.09.2011 | ||
MK | 07.09.2011 | ||
NL | 07.09.2011 | ||
PL | 07.09.2011 | ||
RO | 07.09.2011 | ||
SE | 07.09.2011 | ||
SI | 07.09.2011 | ||
SK | 07.09.2011 | ||
NO | 07.12.2011 | ||
GR | 08.12.2011 | ||
IS | 07.01.2012 | ||
PT | 09.01.2012 | ||
Former [2012/35] | AT | 07.09.2011 | |
BE | 07.09.2011 | ||
CY | 07.09.2011 | ||
CZ | 07.09.2011 | ||
DK | 07.09.2011 | ||
EE | 07.09.2011 | ||
FI | 07.09.2011 | ||
HR | 07.09.2011 | ||
IT | 07.09.2011 | ||
LT | 07.09.2011 | ||
LV | 07.09.2011 | ||
NL | 07.09.2011 | ||
PL | 07.09.2011 | ||
RO | 07.09.2011 | ||
SE | 07.09.2011 | ||
SI | 07.09.2011 | ||
SK | 07.09.2011 | ||
NO | 07.12.2011 | ||
GR | 08.12.2011 | ||
IS | 07.01.2012 | ||
PT | 09.01.2012 | ||
Former [2012/26] | AT | 07.09.2011 | |
BE | 07.09.2011 | ||
CY | 07.09.2011 | ||
CZ | 07.09.2011 | ||
EE | 07.09.2011 | ||
FI | 07.09.2011 | ||
HR | 07.09.2011 | ||
IT | 07.09.2011 | ||
LT | 07.09.2011 | ||
LV | 07.09.2011 | ||
NL | 07.09.2011 | ||
PL | 07.09.2011 | ||
RO | 07.09.2011 | ||
SE | 07.09.2011 | ||
SI | 07.09.2011 | ||
SK | 07.09.2011 | ||
NO | 07.12.2011 | ||
GR | 08.12.2011 | ||
IS | 07.01.2012 | ||
PT | 09.01.2012 | ||
Former [2012/23] | AT | 07.09.2011 | |
BE | 07.09.2011 | ||
CY | 07.09.2011 | ||
CZ | 07.09.2011 | ||
EE | 07.09.2011 | ||
FI | 07.09.2011 | ||
HR | 07.09.2011 | ||
IT | 07.09.2011 | ||
LT | 07.09.2011 | ||
LV | 07.09.2011 | ||
NL | 07.09.2011 | ||
RO | 07.09.2011 | ||
SE | 07.09.2011 | ||
SI | 07.09.2011 | ||
SK | 07.09.2011 | ||
NO | 07.12.2011 | ||
GR | 08.12.2011 | ||
IS | 07.01.2012 | ||
PT | 09.01.2012 | ||
Former [2012/21] | AT | 07.09.2011 | |
BE | 07.09.2011 | ||
CY | 07.09.2011 | ||
CZ | 07.09.2011 | ||
FI | 07.09.2011 | ||
HR | 07.09.2011 | ||
LT | 07.09.2011 | ||
LV | 07.09.2011 | ||
SE | 07.09.2011 | ||
SI | 07.09.2011 | ||
NO | 07.12.2011 | ||
GR | 08.12.2011 | ||
IS | 07.01.2012 | ||
Former [2012/18] | AT | 07.09.2011 | |
BE | 07.09.2011 | ||
CY | 07.09.2011 | ||
FI | 07.09.2011 | ||
HR | 07.09.2011 | ||
LT | 07.09.2011 | ||
LV | 07.09.2011 | ||
SE | 07.09.2011 | ||
SI | 07.09.2011 | ||
NO | 07.12.2011 | ||
GR | 08.12.2011 | ||
Former [2012/14] | AT | 07.09.2011 | |
CY | 07.09.2011 | ||
FI | 07.09.2011 | ||
HR | 07.09.2011 | ||
LT | 07.09.2011 | ||
LV | 07.09.2011 | ||
SE | 07.09.2011 | ||
SI | 07.09.2011 | ||
NO | 07.12.2011 | ||
GR | 08.12.2011 | Documents cited: | Search | [A]WO0173988 (CORIOLIS NETWORKS INC [US], et al) [A] 1-6 * abstract * * page 5 * * page 9, line 33 - page 13 * * page 15, line 1 - line 14 * * figures 4-6 *; | [X]US2006018324 (NISAR BHA V [US], et al) [X] 1-6 * abstract * * paragraph [0001] - paragraph [0039] * * figures 1-3 *; | [A]WO2007045448 (ERICSSON TELEFON AB L M [SE], et al) [A] 1-6 * abstract * * figures 1-3 * * page 1 - page 11 *; | [A] - "Link capacity adjustment scheme (LCAS) for virtual concatenated signals; G.7042/Y.1305 (03/06)", ITU-T DRAFT STUDY PERIOD 2005-2008, INTERNATIONAL TELECOMMUNICATION UNION, GENEVA ; CH, (20060329), no. G.7042/Y.1305 (03/06, XP017404580 [A] 1-6 * the whole document * |