EP2253074 - APPARATUS AND METHOD FOR COMPOSING DIVERSITY SUBCHANNEL IN WIRELESS COMMUNICATION SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 09.07.2021 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 31.07.2020 | ||
Former | Grant of patent is intended Status updated on 30.03.2020 | ||
Former | Examination is in progress Status updated on 16.02.2018 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Samsung Electronics Co., Ltd. 129, Samsung-ro Yeongtong-gu Suwon-si, Gyeonggi-do, 443-742 / KR | [2012/39] |
Former [2010/47] | For all designated states Samsung Electronics Co., Ltd. 416 Maetan-dong Yeongtong-gu Suwon-si, Gyeonggi-do 443-742 / KR | Inventor(s) | 01 /
KIM, Tae-Young 308-103 Kkachi Maeul Sinwon Apt. Gumi-dong Bundang-gu Seongnam-si Gyeonggi-do 463-739 / KR | 02 /
PARK, Jeong-Ho 704 SaeSeoul Apt. 46(31/3) Banpo-dong Seocho-gu Seoul 137-802 / KR | 03 /
PARK, Dong-Seek 107-1802 SK Apt. Seocheon-dong Giheung-gu Yongin-si Gyeonggi-do 446-959 / KR | 04 /
KANG, Hee-Won 201-1801 Hansol Maeul LG Apt. Jeongja-dong Bundang-gu Seongnam-si Gyeonggi-do 463-909 / KR | 05 /
CHOI, Ho-Kyu 113-601 Sibeomdanji Hanshin Apt. Seohyeon-dong Bundang-gu Seongnam-si Gyeonggi-do 463-772 / KR | 06 /
CHO, Jae-Weon 104-1103 Hyundai I-Park Apt. Mangpo-dong Yeongtong-gu Suwon-si Gyeonggi-do 443-770 / KR | 07 /
YU, Hyun-Kyu 325-24 Yulhyeon-dong Gangnam-gu Seoul 135-210 / KR | 08 /
JEONG, Su-Ryong 904-1701 Byeokjeokgol 9 Danji Apt. Yeongtong 2-dong Yeongtong-gu Suwon-si Gyeonggi-do 443-726 / KR | [2020/36] |
Former [2010/47] | 01 /
KIM, Tae-Young 308-103 Kkachi Maeul Sinwon Apt. Gumi-dong Bundang-gu Seongnam-si Gyeonggi-do 463-739 / KR | ||
02 /
PARK, Jeong-Ho 704 SaeSeoul Apt. 46(31/3) Banpo-dong Seocho-gu Seoul 137-802 / KR | |||
03 /
PARK, Dong-Seek 107-1802 SK Apt. Seocheon-dong Giheung-gu Yongin-si Gyeonggi-do 446-959 / KR | |||
04 /
KANG, Hee-Won 201-1801 Hansol Maeul LG Apt. Jeongja-dong Bundang-gu Seongnam-si Gyeonggi-do 463-909 / KR | |||
05 /
CHOI, Ho-Kyu 113-601 Sibeomdanji Hanshin Apt. Seohyeon-dong Bundang-gu Seongnam-si Gyeonggi-do 463-772 / KR | |||
06 /
CHO, Jae-Weon 104-1103 Hyundai I-Park Apt. Mangpo-dong Yeongtong-gu Suwon-si Gyeonggi-do 443-770 / KR | |||
07 /
YU, Hyun-Kyu 325-24 Yulhyeon-dong Gangnam-gu Seoul 135-210 / KR | |||
08 /
JEONG, Su-Ryong 904-1701 Byeokjeokgol 9 Danji Apt. Yeongtong 2-dong Yeongtong-gu Suwon-si Gyeonggi-do 443-726 / KR | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2020/36] |
Former [2010/47] | Grünecker, Kinkeldey, Stockmair & Schwanhäusser Anwaltssozietät Leopoldstrasse 4 80802 München / DE | Application number, filing date | 09720362.4 | 10.03.2009 | [2010/47] | WO2009KR01185 | Priority number, date | KR20080022235 | 10.03.2008 Original published format: KR 20080022235 | KR20080064700 | 04.07.2008 Original published format: KR 20080064700 | KR20080102490 | 20.10.2008 Original published format: KR 20080102490 | KR20080109102 | 04.11.2008 Original published format: KR 20080109102 | KR20080110662 | 07.11.2008 Original published format: KR 20080110662 | KR20080114567 | 18.11.2008 Original published format: KR 20080114567 | KR20080127414 | 15.12.2008 Original published format: KR 20080127414 | KR20090016052 | 25.02.2009 Original published format: KR 20090016052 | KR20090020007 | 09.03.2009 Original published format: KR 20090020007 | [2010/47] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2009113796 | Date: | 17.09.2009 | Language: | EN | [2009/38] | Type: | A2 Application without search report | No.: | EP2253074 | Date: | 24.11.2010 | Language: | EN | The application published by WIPO in one of the EPO official languages on 17.09.2009 takes the place of the publication of the European patent application. | [2010/47] | Type: | B1 Patent specification | No.: | EP2253074 | Date: | 02.09.2020 | Language: | EN | [2020/36] | Search report(s) | International search report - published on: | KR | 17.12.2009 | (Supplementary) European search report - dispatched on: | EP | 07.06.2016 | Classification | IPC: | H04B7/02, H04L27/26, H04B7/26, H04L5/00, H04B7/12, // H04W72/04 | [2016/27] | CPC: |
H04B7/12 (EP,KR,US);
H04L27/2602 (EP,KR,US);
H04L5/0039 (EP,US);
H04L5/0041 (EP,US);
H04L5/0044 (EP,KR,US);
H04W72/0453 (KR);
H04W72/04 (EP,US)
(-)
|
Former IPC [2010/47] | H04B7/02, H04L27/26, H04B7/26 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2020/36] |
Former [2010/47] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | VORRICHTUNG UND VERFAHREN ZUR ZUSAMMENSTELLUNG EINES DIVERSITÄTS-UNTERKANALS IN EINEM DRAHTLOSEN KOMMUNIKATIONSSYSTEM | [2010/47] | English: | APPARATUS AND METHOD FOR COMPOSING DIVERSITY SUBCHANNEL IN WIRELESS COMMUNICATION SYSTEM | [2010/47] | French: | APPAREIL ET PROCÉDÉ POUR COMPOSER UN SOUS-CANAL DE DIVERSITÉ DANS UN SYSTÈME DE COMMUNICATION SANS FIL | [2010/47] | Entry into regional phase | 02.09.2010 | National basic fee paid | 02.09.2010 | Search fee paid | 02.09.2010 | Designation fee(s) paid | 02.09.2010 | Examination fee paid | Examination procedure | 02.09.2010 | Examination requested [2010/47] | 20.12.2016 | Amendment by applicant (claims and/or description) | 19.02.2018 | Despatch of a communication from the examining division (Time limit: M04) | 27.06.2018 | Reply to a communication from the examining division | 02.11.2018 | Despatch of a communication from the examining division (Time limit: M04) | 06.03.2019 | Reply to a communication from the examining division | 11.03.2020 | Cancellation of oral proceeding that was planned for 12.03.2020 | 12.03.2020 | Date of oral proceedings (cancelled) | 31.03.2020 | Communication of intention to grant the patent | 23.07.2020 | Fee for grant paid | 23.07.2020 | Fee for publishing/printing paid | 23.07.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 19.02.2018 | Opposition(s) | 03.06.2021 | No opposition filed within time limit [2021/32] | Fees paid | Renewal fee | 30.03.2011 | Renewal fee patent year 03 | 28.03.2012 | Renewal fee patent year 04 | 26.03.2013 | Renewal fee patent year 05 | 27.03.2014 | Renewal fee patent year 06 | 27.03.2015 | Renewal fee patent year 07 | 29.03.2016 | Renewal fee patent year 08 | 27.03.2017 | Renewal fee patent year 09 | 23.03.2018 | Renewal fee patent year 10 | 22.03.2019 | Renewal fee patent year 11 | 24.03.2020 | Renewal fee patent year 12 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.03.2009 | AT | 02.09.2020 | CY | 02.09.2020 | CZ | 02.09.2020 | DK | 02.09.2020 | EE | 02.09.2020 | ES | 02.09.2020 | FI | 02.09.2020 | HR | 02.09.2020 | IT | 02.09.2020 | LT | 02.09.2020 | LV | 02.09.2020 | MC | 02.09.2020 | MK | 02.09.2020 | MT | 02.09.2020 | NL | 02.09.2020 | PL | 02.09.2020 | RO | 02.09.2020 | SE | 02.09.2020 | SI | 02.09.2020 | SK | 02.09.2020 | TR | 02.09.2020 | BG | 02.12.2020 | NO | 02.12.2020 | GR | 03.12.2020 | IS | 02.01.2021 | PT | 04.01.2021 | IE | 10.03.2021 | LU | 10.03.2021 | BE | 31.03.2021 | CH | 31.03.2021 | FR | 31.03.2021 | LI | 31.03.2021 | [2024/41] |
Former [2024/29] | HU | 10.03.2009 | |
AT | 02.09.2020 | ||
CY | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
MK | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
TR | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
IE | 10.03.2021 | ||
LU | 10.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
FR | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2024/22] | HU | 10.03.2009 | |
AT | 02.09.2020 | ||
CY | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
MK | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
IE | 10.03.2021 | ||
LU | 10.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
FR | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2023/27] | HU | 10.03.2009 | |
AT | 02.09.2020 | ||
CY | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
IE | 10.03.2021 | ||
LU | 10.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
FR | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2023/24] | AT | 02.09.2020 | |
CY | 02.09.2020 | ||
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
IE | 10.03.2021 | ||
LU | 10.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
FR | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2022/34] | AT | 02.09.2020 | |
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
IE | 10.03.2021 | ||
LU | 10.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
FR | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2022/11] | AT | 02.09.2020 | |
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
IE | 10.03.2021 | ||
LU | 10.03.2021 | ||
CH | 31.03.2021 | ||
FR | 31.03.2021 | ||
LI | 31.03.2021 | ||
Former [2022/08] | AT | 02.09.2020 | |
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
IE | 10.03.2021 | ||
LU | 10.03.2021 | ||
FR | 31.03.2021 | ||
Former [2022/07] | AT | 02.09.2020 | |
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
IE | 10.03.2021 | ||
Former [2021/48] | AT | 02.09.2020 | |
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
IT | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/45] | AT | 02.09.2020 | |
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
MC | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/37] | AT | 02.09.2020 | |
CZ | 02.09.2020 | ||
DK | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/36] | AT | 02.09.2020 | |
CZ | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
SE | 02.09.2020 | ||
SI | 02.09.2020 | ||
SK | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/28] | AT | 02.09.2020 | |
CZ | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
SE | 02.09.2020 | ||
SK | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/25] | AT | 02.09.2020 | |
CZ | 02.09.2020 | ||
EE | 02.09.2020 | ||
ES | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
IS | 02.01.2021 | ||
PT | 04.01.2021 | ||
Former [2021/24] | AT | 02.09.2020 | |
CZ | 02.09.2020 | ||
EE | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
Former [2021/22] | CZ | 02.09.2020 | |
EE | 02.09.2020 | ||
FI | 02.09.2020 | ||
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
RO | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
Former [2021/21] | FI | 02.09.2020 | |
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
PT | 04.01.2021 | ||
Former [2021/18] | FI | 02.09.2020 | |
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
NL | 02.09.2020 | ||
PL | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
Former [2021/10] | FI | 02.09.2020 | |
HR | 02.09.2020 | ||
LT | 02.09.2020 | ||
LV | 02.09.2020 | ||
PL | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
Former [2021/09] | FI | 02.09.2020 | |
LT | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
GR | 03.12.2020 | ||
Former [2021/08] | FI | 02.09.2020 | |
LT | 02.09.2020 | ||
SE | 02.09.2020 | ||
BG | 02.12.2020 | ||
NO | 02.12.2020 | ||
Former [2021/07] | FI | 02.09.2020 | |
LT | 02.09.2020 | ||
NO | 02.12.2020 | Documents cited: | Search | [Y]EP1571795 (SAMSUNG ELECTRONICS CO LTD [KR]) [Y] 3,4,13-15 * paragraphs [0035] , [ 0036] *; | [A]EP1763191 (SAMSUNG ELECTRONICS CO LTD [KR]) [A] 1-15* paragraphs [0020] - [0023] *; | [E]WO2009072842 (LG ELECTRONICS INC [KR], et al) [E] 1,5-8 * paragraphs [0053] - [0057] * * figures 4,5 *; | [E]WO2010047510 (LG ELECTRONICS INC [KR], et al) [E] 1,2,5-7,9-12 * figures 4,8,9 *; | [E]WO2010047511 (LG ELECTRONICS INC [KR], et al) [E] 1,2,5-7,9-12 * figures 4,8,9 *; | [E]WO2010047537 (LG ELECTRONICS INC [KR], et al) [E] 1-15 * figures 2,3,5,8 * * paragraphs [0057] - [0059] *; | [XPYI] - TAEYOUNG KIM ET AL, "Design of Resource Allocation Unit Structure for IEEE 802.16m ; C80216m-08_188r3", IEEE DRAFT; C80216M-08_188R3, IEEE-SA, PISCATAWAY, NJ USA, (20080317), vol. 802.16m, no. r3, pages 1 - 19, XP068000736 [XP] 1,5-8 * Slide 10 * [Y] 3,4,13-15 [I] 2-4,9-15 | [IP] - YUVAL LOMNITZ YUVAL LOMNITZIOTANTEL COM, "Requirements, concept and design of downlink symbol structure for 802.16m ; S80216m-08_120", IEEE DRAFT; S80216M-08_120, IEEE-SA, PISCATAWAY, NJ USA, (20080310), vol. 802.16m, pages 1 - 67, XP068101494 [IP] 1,5,8 * Slide 20 * | [XP] - JEONGHO PARK ET AL, "Proposed Text of UL Subchannelization Section for the IEEE 802.16m Amendment ; C80216m-08_1457r2", IEEE DRAFT; C80216M-08_1457R2, IEEE-SA, PISCATAWAY, NJ USA, (20081103), vol. 802.16m, no. r2, pages 1 - 11, XP017797158 [XP] 1-15 * figures 1,2 * * page 4 * | [A] - MYUNG-SUN SONG GWANG-ZEEN KO, "[Mixed Resource Composition] ; 22-07-0140-00-0000_ETRI_Mixed_Resource_Composition", IEEE DRAFT; 22-07-0140-00-0000_ETRI_MIXED_RESOURCE_COMPOSITION, IEEE-SA, PISCATAWAY, NJ USA, (20070315), vol. 802.22, pages 1 - 11, XP017742081 [A] 1-15 * Slides 7 and 8 * | International search | [A]KR20060134853 (SAMSUNG ELECTRONICS CO LTD [KR]); | [A]US2007263735 (TONG WEN [CA], et al); | [Y]KR20070116436 (KOREA ELECTRONICS TELECOMM [KR], et al); | [Y] - C.LENGOUMBI ET AL., "Subchannelization Performance for the Downlink of a Multi-cell OFDMA System", Proceedings of Third IEEE International Conference on Wireless and Mobile Computing, Networking and Communications, (200710), XP031338290 |