EP2262632 - METHODS TO PRODUCE STRETCHABLE PRODUCTS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.07.2019 Database last updated on 08.10.2024 | |
Former | The patent has been granted Status updated on 27.07.2018 | ||
Former | Grant of patent is intended Status updated on 22.01.2018 | ||
Former | Examination is in progress Status updated on 31.10.2016 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Tamicare Ltd. Aris House Carns Lane Radcliffe Manchester M25 3SW / GB | [2010/51] | Inventor(s) | 01 /
GILOH, Ehud Aris House Cams Lane Radcliffe Manchester M25 3SW / GB | [2018/35] |
Former [2010/51] | 01 /
GILOH, Ehud Aris House Cams Lane Radcliffe Manchester M25 3SW / GB | Representative(s) | Tomkins & Co 5 Dartmouth Road Dublin 6 / IE | [2018/35] |
Former [2010/51] | Lane, Cathal Michael, et al 5 Dartmouth Road Dublin 6 / IE | Application number, filing date | 09724031.1 | 24.03.2009 | [2010/51] | WO2009IB05465 | Priority number, date | US20080056040 | 26.03.2008 Original published format: US 56040 | [2010/51] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2009118654 | Date: | 01.10.2009 | Language: | EN | [2009/40] | Type: | A1 Application with search report | No.: | EP2262632 | Date: | 22.12.2010 | Language: | EN | The application published by WIPO in one of the EPO official languages on 01.10.2009 takes the place of the publication of the European patent application. | [2010/51] | Type: | B1 Patent specification | No.: | EP2262632 | Date: | 29.08.2018 | Language: | EN | [2018/35] | Search report(s) | International search report - published on: | EP | 01.10.2009 | Classification | IPC: | B29C41/08, B05D1/02 | [2010/51] | CPC: |
B29C41/08 (EP,US);
B29C41/085 (EP,US);
Y10T428/15 (EP,US);
Y10T428/23943 (EP,US);
Y10T428/23979 (EP,US);
Y10T428/24504 (EP,US);
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2018/35] |
Former [2010/51] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | VERFAHREN ZUR HERSTELLUNG DEHNBARER PRODUKTE | [2010/51] | English: | METHODS TO PRODUCE STRETCHABLE PRODUCTS | [2010/51] | French: | PROCÉDÉS DE PRODUCTION DE PRODUITS ÉTIRABLES | [2010/51] | Entry into regional phase | 15.10.2010 | National basic fee paid | 15.10.2010 | Designation fee(s) paid | 15.10.2010 | Examination fee paid | Examination procedure | 15.10.2010 | Examination requested [2010/51] | 02.12.2010 | Amendment by applicant (claims and/or description) | 08.04.2014 | Despatch of a communication from the examining division (Time limit: M04) | 06.08.2014 | Reply to a communication from the examining division | 04.12.2014 | Despatch of a communication from the examining division (Time limit: M04) | 31.03.2015 | Reply to a communication from the examining division | 29.01.2016 | Despatch of a communication from the examining division (Time limit: M04) | 20.05.2016 | Reply to a communication from the examining division | 02.06.2016 | Despatch of a communication from the examining division (Time limit: M06) | 28.10.2016 | Reply to a communication from the examining division | 20.07.2017 | Despatch of a communication from the examining division (Time limit: M04) | 13.11.2017 | Reply to a communication from the examining division | 23.01.2018 | Communication of intention to grant the patent | 21.05.2018 | Receipt of the translation of the claim(s) | 10.07.2018 | Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time | 13.07.2018 | Fee for grant paid | 13.07.2018 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 08.04.2014 | Opposition(s) | 31.05.2019 | No opposition filed within time limit [2019/32] | Request for further processing for: | The application is deemed to be withdrawn due to failure to fulfill actions required for granting the patent | 13.07.2018 | Request for further processing filed | 13.07.2018 | Full payment received (date of receipt of payment) Request granted | 26.07.2018 | Decision despatched | Fees paid | Renewal fee | 28.03.2011 | Renewal fee patent year 03 | 30.03.2012 | Renewal fee patent year 04 | 28.03.2013 | Renewal fee patent year 05 | 14.03.2014 | Renewal fee patent year 06 | 31.03.2015 | Renewal fee patent year 07 | 31.03.2016 | Renewal fee patent year 08 | 30.03.2017 | Renewal fee patent year 09 | 29.03.2018 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 24.03.2009 | AT | 29.08.2018 | CY | 29.08.2018 | CZ | 29.08.2018 | DK | 29.08.2018 | EE | 29.08.2018 | ES | 29.08.2018 | FI | 29.08.2018 | HR | 29.08.2018 | IT | 29.08.2018 | LT | 29.08.2018 | LV | 29.08.2018 | MC | 29.08.2018 | MK | 29.08.2018 | NL | 29.08.2018 | RO | 29.08.2018 | SE | 29.08.2018 | SI | 29.08.2018 | SK | 29.08.2018 | TR | 29.08.2018 | BG | 29.11.2018 | NO | 29.11.2018 | GR | 30.11.2018 | IS | 29.12.2018 | PT | 29.12.2018 | IE | 24.03.2019 | LU | 24.03.2019 | MT | 24.03.2019 | BE | 31.03.2019 | CH | 31.03.2019 | FR | 31.03.2019 | LI | 31.03.2019 | [2022/31] |
Former [2021/32] | HU | 24.03.2009 | |
AT | 29.08.2018 | ||
CY | 29.08.2018 | ||
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
ES | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
NL | 29.08.2018 | ||
RO | 29.08.2018 | ||
SE | 29.08.2018 | ||
SI | 29.08.2018 | ||
SK | 29.08.2018 | ||
TR | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
PT | 29.12.2018 | ||
IE | 24.03.2019 | ||
LU | 24.03.2019 | ||
MT | 24.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
FR | 31.03.2019 | ||
LI | 31.03.2019 | ||
Former [2021/26] | AT | 29.08.2018 | |
CY | 29.08.2018 | ||
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
ES | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
NL | 29.08.2018 | ||
RO | 29.08.2018 | ||
SE | 29.08.2018 | ||
SI | 29.08.2018 | ||
SK | 29.08.2018 | ||
TR | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
PT | 29.12.2018 | ||
IE | 24.03.2019 | ||
LU | 24.03.2019 | ||
MT | 24.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
FR | 31.03.2019 | ||
LI | 31.03.2019 | ||
Former [2020/29] | AT | 29.08.2018 | |
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
ES | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
NL | 29.08.2018 | ||
RO | 29.08.2018 | ||
SE | 29.08.2018 | ||
SI | 29.08.2018 | ||
SK | 29.08.2018 | ||
TR | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
PT | 29.12.2018 | ||
IE | 24.03.2019 | ||
LU | 24.03.2019 | ||
MT | 24.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
FR | 31.03.2019 | ||
LI | 31.03.2019 | ||
Former [2020/17] | AT | 29.08.2018 | |
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
ES | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
NL | 29.08.2018 | ||
RO | 29.08.2018 | ||
SE | 29.08.2018 | ||
SI | 29.08.2018 | ||
SK | 29.08.2018 | ||
TR | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
IE | 24.03.2019 | ||
LU | 24.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
FR | 31.03.2019 | ||
LI | 31.03.2019 | ||
Former [2020/11] | AT | 29.08.2018 | |
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
ES | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
NL | 29.08.2018 | ||
RO | 29.08.2018 | ||
SE | 29.08.2018 | ||
SI | 29.08.2018 | ||
SK | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
IE | 24.03.2019 | ||
LU | 24.03.2019 | ||
BE | 31.03.2019 | ||
CH | 31.03.2019 | ||
FR | 31.03.2019 | ||
LI | 31.03.2019 | ||
Former [2020/09] | AT | 29.08.2018 | |
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
ES | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
NL | 29.08.2018 | ||
RO | 29.08.2018 | ||
SE | 29.08.2018 | ||
SI | 29.08.2018 | ||
SK | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
IE | 24.03.2019 | ||
LU | 24.03.2019 | ||
Former [2020/01] | AT | 29.08.2018 | |
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
ES | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
NL | 29.08.2018 | ||
RO | 29.08.2018 | ||
SE | 29.08.2018 | ||
SI | 29.08.2018 | ||
SK | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
LU | 24.03.2019 | ||
Former [2019/46] | AT | 29.08.2018 | |
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
ES | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
MC | 29.08.2018 | ||
NL | 29.08.2018 | ||
RO | 29.08.2018 | ||
SE | 29.08.2018 | ||
SI | 29.08.2018 | ||
SK | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/37] | AT | 29.08.2018 | |
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
ES | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
NL | 29.08.2018 | ||
RO | 29.08.2018 | ||
SE | 29.08.2018 | ||
SI | 29.08.2018 | ||
SK | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/26] | AT | 29.08.2018 | |
CZ | 29.08.2018 | ||
DK | 29.08.2018 | ||
EE | 29.08.2018 | ||
ES | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
NL | 29.08.2018 | ||
RO | 29.08.2018 | ||
SE | 29.08.2018 | ||
SK | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/23] | AT | 29.08.2018 | |
CZ | 29.08.2018 | ||
EE | 29.08.2018 | ||
ES | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
NL | 29.08.2018 | ||
RO | 29.08.2018 | ||
SE | 29.08.2018 | ||
SK | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/22] | CZ | 29.08.2018 | |
ES | 29.08.2018 | ||
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
NL | 29.08.2018 | ||
RO | 29.08.2018 | ||
SE | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/21] | ES | 29.08.2018 | |
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
IT | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
NL | 29.08.2018 | ||
SE | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/12] | ES | 29.08.2018 | |
FI | 29.08.2018 | ||
HR | 29.08.2018 | ||
LT | 29.08.2018 | ||
LV | 29.08.2018 | ||
NL | 29.08.2018 | ||
SE | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/11] | FI | 29.08.2018 | |
HR | 29.08.2018 | ||
LT | 29.08.2018 | ||
NL | 29.08.2018 | ||
SE | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/10] | FI | 29.08.2018 | |
LT | 29.08.2018 | ||
NL | 29.08.2018 | ||
SE | 29.08.2018 | ||
BG | 29.11.2018 | ||
NO | 29.11.2018 | ||
GR | 30.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/09] | FI | 29.08.2018 | |
LT | 29.08.2018 | ||
NL | 29.08.2018 | ||
NO | 29.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/08] | FI | 29.08.2018 | |
LT | 29.08.2018 | ||
NO | 29.11.2018 | ||
IS | 29.12.2018 | ||
Former [2019/07] | LT | 29.08.2018 | Cited in | International search | [A]JPS54143453 (MATSUSHITA ELECTRIC WORKS LTD) [A] 1 * abstract *; | [A]JPS6193866 (TAKASHIMAYA NIPPATSU KOGYO) [A] 1 * abstract *; | [A]JPH0399900 (I B HAATSU KK) [A] 1 * abstract *; | [A]JPH0440260 (KAWAGUCHI GOUSEI KK) [A] 1 * abstract *; | [A]JPH07171844 (SEKISUI CHEMICAL CO LTD, et al) [A] 1* abstract *; | [A]US2006113714 (GILOH EHUD [GB], et al) [A] 1 * claims 101,108-110 *; | [A]WO2006092666 (TAMICARE LTD [GB], et al) [A] 1 * claims 1,20 * |