blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2260062

EP2260062 - ADHESION TO PLASTIC WITH BLOCK COPOLYMERS OBTAINED USING RAFT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  03.07.2020
Database last updated on 06.07.2024
FormerThe patent has been granted
Status updated on  05.07.2019
FormerGrant of patent is intended
Status updated on  27.02.2019
FormerExamination is in progress
Status updated on  03.03.2017
Most recent event   Tooltip02.06.2023Lapse of the patent in a contracting state
New state(s): IT
published on 05.07.2023  [2023/27]
Applicant(s)For all designated states
DSM IP Assets B.V.
Het Overloon 1
6411 TE Heerlen / NL
[N/P]
Former [2010/50]For all designated states
DSM IP Assets B.V.
Het Overloon 1
6411 TE Heerlen / NL
Inventor(s)01 / SCHELLEKENS, Michael Arnoldus Jacobus
Sluisweg 12
NL-5145PE Waalwijk / NL
02 / OVERBEEK, Gerardus Cornelis
Sluisweg 12
NL-5145 PE Waalwijk / NL
03 / NABUURS, Tijs
Sluisweg 12
NL-5145 PE Waalwijk / NL
04 / GEURTS, John
Sluisweg 12
NL-5145 PE Waalwijk / NL
 [2010/50]
Representative(s)dsm-firmenich IP
P.O. Box 4
6100 AA Echt / NL
[N/P]
Former [2019/32]DSM Intellectual Property
P.O. Box 4
6100 AA Echt / NL
Former [2010/50]Kirk, Martin John
DSM Intellectual Property Urmond Office P.O. Box 9
6160 MA Geleen / NL
Application number, filing date09729091.001.04.2009
[2010/50]
WO2009EP53891
Priority number, dateEP2008010328801.04.2008         Original published format: EP 08103288
[2010/50]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2009121911
Date:08.10.2009
Language:EN
[2009/41]
Type: A1 Application with search report 
No.:EP2260062
Date:15.12.2010
Language:EN
The application published by WIPO in one of the EPO official languages on 08.10.2009 takes the place of the publication of the European patent application.
[2010/50]
Type: B1 Patent specification 
No.:EP2260062
Date:07.08.2019
Language:EN
[2019/32]
Search report(s)International search report - published on:EP08.10.2009
ClassificationIPC:C08F2/24, C08F293/00, C08L53/00, C09D153/00
[2010/50]
CPC:
C09D153/00 (EP,US); C08F2/24 (EP,US); C08F287/00 (EP,US);
C08F293/005 (EP,US); C08L53/00 (EP,US); C08L53/005 (EP,US);
Y10T428/31935 (EP,US); Y10T428/31938 (EP,US) (-)
C-Set:
C08L53/005, C08L2666/02 (US,EP);
C08L53/00, C08L2666/02 (EP,US);
C09D153/00, C08L2666/02 (US,EP)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2019/32]
Former [2010/50]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:PLASTIKKLEBSTOFF MIT BLOCKCOPOLYMEREN AUS RAFT[2010/50]
English:ADHESION TO PLASTIC WITH BLOCK COPOLYMERS OBTAINED USING RAFT[2010/50]
French:ADHÉRENCE AU PLASTIQUE AVEC DES COPOLYMÈRES SÉQUENCÉS OBTENUS PAR LE MÉCANISME RAFT[2010/50]
Entry into regional phase06.10.2010National basic fee paid 
06.10.2010Designation fee(s) paid 
06.10.2010Examination fee paid 
Examination procedure06.10.2010Examination requested  [2010/50]
17.12.2010Amendment by applicant (claims and/or description)
01.03.2017Despatch of a communication from the examining division (Time limit: M04)
06.07.2017Reply to a communication from the examining division
10.09.2018Despatch of a communication from the examining division (Time limit: M04)
10.01.2019Reply to a communication from the examining division
28.02.2019Communication of intention to grant the patent
27.06.2019Fee for grant paid
27.06.2019Fee for publishing/printing paid
27.06.2019Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  01.03.2017
Opposition(s)03.06.2020No opposition filed within time limit [2020/32]
Fees paidRenewal fee
25.04.2011Renewal fee patent year 03
28.03.2012Renewal fee patent year 04
12.04.2013Renewal fee patent year 05
25.03.2014Renewal fee patent year 06
10.04.2015Renewal fee patent year 07
11.04.2016Renewal fee patent year 08
10.04.2017Renewal fee patent year 09
11.04.2018Renewal fee patent year 10
15.04.2019Renewal fee patent year 11
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU01.04.2009
AT07.08.2019
CY07.08.2019
CZ07.08.2019
DK07.08.2019
EE07.08.2019
ES07.08.2019
FI07.08.2019
HR07.08.2019
LT07.08.2019
LV07.08.2019
MC07.08.2019
MK07.08.2019
MT07.08.2019
PL07.08.2019
RO07.08.2019
SI07.08.2019
SK07.08.2019
TR07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
IS07.12.2019
PT09.12.2019
IE01.04.2020
IT01.04.2020
LU01.04.2020
CH30.04.2020
LI30.04.2020
[2023/27]
Former [2022/32]HU01.04.2009
AT07.08.2019
CY07.08.2019
CZ07.08.2019
DK07.08.2019
EE07.08.2019
ES07.08.2019
FI07.08.2019
HR07.08.2019
LT07.08.2019
LV07.08.2019
MC07.08.2019
MK07.08.2019
MT07.08.2019
PL07.08.2019
RO07.08.2019
SI07.08.2019
SK07.08.2019
TR07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
IS07.12.2019
PT09.12.2019
IE01.04.2020
LU01.04.2020
CH30.04.2020
LI30.04.2020
Former [2022/27]HU01.04.2009
AT07.08.2019
CY07.08.2019
CZ07.08.2019
DK07.08.2019
EE07.08.2019
ES07.08.2019
FI07.08.2019
HR07.08.2019
LT07.08.2019
LV07.08.2019
MC07.08.2019
MT07.08.2019
PL07.08.2019
RO07.08.2019
SI07.08.2019
SK07.08.2019
TR07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
IS07.12.2019
PT09.12.2019
IE01.04.2020
LU01.04.2020
CH30.04.2020
LI30.04.2020
Former [2022/23]AT07.08.2019
CZ07.08.2019
DK07.08.2019
EE07.08.2019
ES07.08.2019
FI07.08.2019
HR07.08.2019
LT07.08.2019
LV07.08.2019
MC07.08.2019
PL07.08.2019
RO07.08.2019
SI07.08.2019
SK07.08.2019
TR07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
IS07.12.2019
PT09.12.2019
IE01.04.2020
LU01.04.2020
CH30.04.2020
LI30.04.2020
Former [2022/12]AT07.08.2019
CZ07.08.2019
DK07.08.2019
EE07.08.2019
ES07.08.2019
FI07.08.2019
HR07.08.2019
LT07.08.2019
LV07.08.2019
MC07.08.2019
PL07.08.2019
RO07.08.2019
SI07.08.2019
SK07.08.2019
TR07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
IS07.12.2019
PT09.12.2019
IE01.04.2020
IT01.04.2020
LU01.04.2020
CH30.04.2020
LI30.04.2020
Former [2021/20]AT07.08.2019
CZ07.08.2019
DK07.08.2019
EE07.08.2019
ES07.08.2019
FI07.08.2019
HR07.08.2019
LT07.08.2019
LV07.08.2019
MC07.08.2019
PL07.08.2019
RO07.08.2019
SI07.08.2019
SK07.08.2019
TR07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
IS07.12.2019
PT09.12.2019
IE01.04.2020
LU01.04.2020
CH30.04.2020
LI30.04.2020
Former [2021/08]AT07.08.2019
CZ07.08.2019
DK07.08.2019
EE07.08.2019
ES07.08.2019
FI07.08.2019
HR07.08.2019
LT07.08.2019
LV07.08.2019
MC07.08.2019
PL07.08.2019
RO07.08.2019
SI07.08.2019
SK07.08.2019
TR07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
IS07.12.2019
PT09.12.2019
LU01.04.2020
CH30.04.2020
LI30.04.2020
Former [2020/52]AT07.08.2019
CZ07.08.2019
DK07.08.2019
EE07.08.2019
ES07.08.2019
FI07.08.2019
HR07.08.2019
LT07.08.2019
LV07.08.2019
MC07.08.2019
PL07.08.2019
RO07.08.2019
SI07.08.2019
SK07.08.2019
TR07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
IS07.12.2019
PT09.12.2019
Former [2020/37]AT07.08.2019
CZ07.08.2019
DK07.08.2019
EE07.08.2019
ES07.08.2019
FI07.08.2019
HR07.08.2019
LT07.08.2019
LV07.08.2019
PL07.08.2019
RO07.08.2019
SI07.08.2019
SK07.08.2019
TR07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
IS07.12.2019
PT09.12.2019
Former [2020/36]AT07.08.2019
CZ07.08.2019
DK07.08.2019
EE07.08.2019
ES07.08.2019
FI07.08.2019
HR07.08.2019
LT07.08.2019
LV07.08.2019
PL07.08.2019
RO07.08.2019
SK07.08.2019
TR07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
IS07.12.2019
PT09.12.2019
Former [2020/25]AT07.08.2019
CZ07.08.2019
DK07.08.2019
EE07.08.2019
ES07.08.2019
FI07.08.2019
HR07.08.2019
LT07.08.2019
LV07.08.2019
PL07.08.2019
RO07.08.2019
SK07.08.2019
TR07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
PT09.12.2019
IS24.02.2020
Former [2020/24]AT07.08.2019
DK07.08.2019
EE07.08.2019
ES07.08.2019
FI07.08.2019
HR07.08.2019
LT07.08.2019
LV07.08.2019
PL07.08.2019
RO07.08.2019
TR07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
PT09.12.2019
IS24.02.2020
Former [2020/23]AT07.08.2019
DK07.08.2019
EE07.08.2019
ES07.08.2019
FI07.08.2019
HR07.08.2019
LT07.08.2019
LV07.08.2019
PL07.08.2019
RO07.08.2019
TR07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
IS07.12.2019
PT09.12.2019
Former [2020/22]DK07.08.2019
EE07.08.2019
ES07.08.2019
FI07.08.2019
HR07.08.2019
LT07.08.2019
LV07.08.2019
TR07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
IS07.12.2019
PT09.12.2019
Former [2020/17]ES07.08.2019
FI07.08.2019
HR07.08.2019
LT07.08.2019
LV07.08.2019
TR07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
IS07.12.2019
PT09.12.2019
Former [2020/12]ES07.08.2019
FI07.08.2019
HR07.08.2019
LT07.08.2019
LV07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
IS07.12.2019
PT09.12.2019
Former [2020/11]ES07.08.2019
FI07.08.2019
HR07.08.2019
LT07.08.2019
LV07.08.2019
BG07.11.2019
NO07.11.2019
GR08.11.2019
PT09.12.2019
Former [2020/10]FI07.08.2019
LT07.08.2019
BG07.11.2019
NO07.11.2019
PT09.12.2019
Former [2020/09]FI07.08.2019
LT07.08.2019
NO07.11.2019
Former [2020/08]LT07.08.2019
NO07.11.2019
Cited inInternational search[X]WO02090392  (RHODIA CHIMIE SA [FR], et al) [X] 1-5,7-14,16,18,19 * claims 1-12,20 * * example 7 * * page 8, lines 3-27 * * page 2, line 25 - page 3, line 24 * * page 9, line 25 - page 10, line 17 * * page 12, lines 2-13 *;
 [A]US6503975  (HUYBRECHTS JOSEF [BE]) [A] 1-22 * example 17 * * the whole document *;
 [A]US2003114548  (BETT WILLIAM [FR], et al) [A] 1-22 * example 2.2 ** the whole document *;
 [A]WO03068827  (RHODIA CHIMIE SA [FR]) [A] 1-9 * the whole document *;
 [A]US2004071871  (QUEVAL LIONEL [FR], et al) [A] 1-9 * paragraphs [0001] - [0003] - [0014] , [0024] , [0025] , [0115]; example 2 * * abstract *;
 [A]US2004082494  (QUEVAL LIONEL [FR], et al) [A] 1-9 * paragraphs [0001] - [0011]; example 2 * * abstract *;
 [A]WO2006037161  (UNIV SYDNEY [AU], et al) [A] 1-22 * example 3 * * examples 3,20 * * the whole document *
ExaminationUS2001044498
 US2004082494
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.