EP2266011 - METHOD FOR MANAGING POWER CONSUMPTION FOR MULTIPROCESSOR SYSTEMS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 15.03.2019 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 06.04.2018 | ||
Former | Grant of patent is intended Status updated on 31.01.2018 | ||
Former | Examination is in progress Status updated on 03.03.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Commissariat à l'Énergie Atomique et aux Énergies Alternatives Bâtiment "Le Ponant D" 25, rue Leblanc 75015 Paris / FR | [2010/52] | Inventor(s) | 01 /
THABET, Farhat 138 avenue du Général Leclerc F-91190 Gif sur Yvette / FR | 02 /
BEN CHEHIDA, Karim 17 rue des Clos Saint Marchel F-92330 Sceaux / FR | 03 /
BLANC, Frédéric 60 avenue Saint Laurent F-91400 Orsay / FR | [2010/52] | Representative(s) | Lucas, Laurent Jacques, et al Marks & Clerk France Conseils en Propriété Industrielle Immeuble Visium 22, Avenue Aristide Briand 94117 Arcueil Cedex / FR | [2018/19] |
Former [2010/52] | Lucas, Laurent Jacques, et al Marks & Clerk France Conseils en Propriété Industrielle Immeuble " Visium " 22, avenue Aristide Briand 94117 Arcueil Cedex / FR | Application number, filing date | 09733105.2 | 15.04.2009 | [2010/52] | WO2009EP54442 | Priority number, date | FR20080002171 | 18.04.2008 Original published format: FR 0802171 | [2010/52] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2009127646 | Date: | 22.10.2009 | Language: | FR | [2009/43] | Type: | A1 Application with search report | No.: | EP2266011 | Date: | 29.12.2010 | Language: | FR | The application published by WIPO in one of the EPO official languages on 22.10.2009 takes the place of the publication of the European patent application. | [2010/52] | Type: | B1 Patent specification | No.: | EP2266011 | Date: | 09.05.2018 | Language: | FR | [2018/19] | Search report(s) | International search report - published on: | EP | 22.10.2009 | Classification | IPC: | G06F1/32 | [2010/52] | CPC: |
G06F1/3203 (EP,US);
Y02D10/00 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2018/19] |
Former [2010/52] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | VERFAHREN ZUR VERWALTUNG DES LEISTUNGSVERBRAUCHS FÜR MEHRPROZESSORSYSTEME | [2010/52] | English: | METHOD FOR MANAGING POWER CONSUMPTION FOR MULTIPROCESSOR SYSTEMS | [2010/52] | French: | PROCEDE DE GESTION DE LA CONSOMMATION D'ENERGIE POUR LES SYSTEMES MULTIPROCESSEURS | [2010/52] | Entry into regional phase | 12.10.2010 | National basic fee paid | 12.10.2010 | Designation fee(s) paid | 12.10.2010 | Examination fee paid | Examination procedure | 10.02.2010 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 12.10.2010 | Examination requested [2010/52] | 22.12.2010 | Amendment by applicant (claims and/or description) | 03.03.2017 | Despatch of a communication from the examining division (Time limit: M06) | 25.08.2017 | Reply to a communication from the examining division | 01.02.2018 | Communication of intention to grant the patent | 06.03.2018 | Fee for grant paid | 06.03.2018 | Fee for publishing/printing paid | 06.03.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 03.03.2017 | Opposition(s) | 12.02.2019 | No opposition filed within time limit [2019/16] | Fees paid | Renewal fee | 21.04.2011 | Renewal fee patent year 03 | 22.03.2012 | Renewal fee patent year 04 | 21.03.2013 | Renewal fee patent year 05 | 19.03.2014 | Renewal fee patent year 06 | 26.03.2015 | Renewal fee patent year 07 | 29.03.2016 | Renewal fee patent year 08 | 30.03.2017 | Renewal fee patent year 09 | 28.03.2018 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 15.04.2009 | AT | 09.05.2018 | CY | 09.05.2018 | CZ | 09.05.2018 | DK | 09.05.2018 | EE | 09.05.2018 | ES | 09.05.2018 | FI | 09.05.2018 | HR | 09.05.2018 | IT | 09.05.2018 | LT | 09.05.2018 | LV | 09.05.2018 | MC | 09.05.2018 | MK | 09.05.2018 | MT | 09.05.2018 | NL | 09.05.2018 | PL | 09.05.2018 | RO | 09.05.2018 | SE | 09.05.2018 | SI | 09.05.2018 | SK | 09.05.2018 | TR | 09.05.2018 | BG | 09.08.2018 | NO | 09.08.2018 | GR | 10.08.2018 | IS | 09.09.2018 | PT | 10.09.2018 | [2022/31] |
Former [2021/34] | HU | 15.04.2009 | |
AT | 09.05.2018 | ||
CY | 09.05.2018 | ||
CZ | 09.05.2018 | ||
DK | 09.05.2018 | ||
EE | 09.05.2018 | ||
ES | 09.05.2018 | ||
FI | 09.05.2018 | ||
HR | 09.05.2018 | ||
IT | 09.05.2018 | ||
LT | 09.05.2018 | ||
LV | 09.05.2018 | ||
MC | 09.05.2018 | ||
MT | 09.05.2018 | ||
NL | 09.05.2018 | ||
PL | 09.05.2018 | ||
RO | 09.05.2018 | ||
SE | 09.05.2018 | ||
SI | 09.05.2018 | ||
SK | 09.05.2018 | ||
TR | 09.05.2018 | ||
BG | 09.08.2018 | ||
NO | 09.08.2018 | ||
GR | 10.08.2018 | ||
IS | 09.09.2018 | ||
PT | 10.09.2018 | ||
Former [2021/32] | HU | 15.04.2009 | |
AT | 09.05.2018 | ||
CY | 09.05.2018 | ||
CZ | 09.05.2018 | ||
DK | 09.05.2018 | ||
EE | 09.05.2018 | ||
ES | 09.05.2018 | ||
FI | 09.05.2018 | ||
HR | 09.05.2018 | ||
IT | 09.05.2018 | ||
LT | 09.05.2018 | ||
LV | 09.05.2018 | ||
MC | 09.05.2018 | ||
NL | 09.05.2018 | ||
PL | 09.05.2018 | ||
RO | 09.05.2018 | ||
SE | 09.05.2018 | ||
SI | 09.05.2018 | ||
SK | 09.05.2018 | ||
TR | 09.05.2018 | ||
BG | 09.08.2018 | ||
NO | 09.08.2018 | ||
GR | 10.08.2018 | ||
IS | 09.09.2018 | ||
PT | 10.09.2018 | ||
Former [2021/31] | AT | 09.05.2018 | |
CY | 09.05.2018 | ||
CZ | 09.05.2018 | ||
DK | 09.05.2018 | ||
EE | 09.05.2018 | ||
ES | 09.05.2018 | ||
FI | 09.05.2018 | ||
HR | 09.05.2018 | ||
IT | 09.05.2018 | ||
LT | 09.05.2018 | ||
LV | 09.05.2018 | ||
MC | 09.05.2018 | ||
NL | 09.05.2018 | ||
PL | 09.05.2018 | ||
RO | 09.05.2018 | ||
SE | 09.05.2018 | ||
SI | 09.05.2018 | ||
SK | 09.05.2018 | ||
TR | 09.05.2018 | ||
BG | 09.08.2018 | ||
NO | 09.08.2018 | ||
GR | 10.08.2018 | ||
IS | 09.09.2018 | ||
PT | 10.09.2018 | ||
Former [2021/26] | AT | 09.05.2018 | |
CY | 09.05.2018 | ||
CZ | 09.05.2018 | ||
DK | 09.05.2018 | ||
EE | 09.05.2018 | ||
ES | 09.05.2018 | ||
FI | 09.05.2018 | ||
HR | 09.05.2018 | ||
IT | 09.05.2018 | ||
LT | 09.05.2018 | ||
LV | 09.05.2018 | ||
MC | 09.05.2018 | ||
NL | 09.05.2018 | ||
PL | 09.05.2018 | ||
RO | 09.05.2018 | ||
SE | 09.05.2018 | ||
SI | 09.05.2018 | ||
SK | 09.05.2018 | ||
TR | 09.05.2018 | ||
BG | 09.08.2018 | ||
NO | 09.08.2018 | ||
GR | 10.08.2018 | ||
PT | 10.09.2018 | ||
Former [2020/29] | AT | 09.05.2018 | |
CZ | 09.05.2018 | ||
DK | 09.05.2018 | ||
EE | 09.05.2018 | ||
ES | 09.05.2018 | ||
FI | 09.05.2018 | ||
HR | 09.05.2018 | ||
IT | 09.05.2018 | ||
LT | 09.05.2018 | ||
LV | 09.05.2018 | ||
MC | 09.05.2018 | ||
NL | 09.05.2018 | ||
PL | 09.05.2018 | ||
RO | 09.05.2018 | ||
SE | 09.05.2018 | ||
SI | 09.05.2018 | ||
SK | 09.05.2018 | ||
TR | 09.05.2018 | ||
BG | 09.08.2018 | ||
NO | 09.08.2018 | ||
GR | 10.08.2018 | ||
PT | 10.09.2018 | ||
Former [2020/16] | AT | 09.05.2018 | |
CZ | 09.05.2018 | ||
DK | 09.05.2018 | ||
EE | 09.05.2018 | ||
ES | 09.05.2018 | ||
FI | 09.05.2018 | ||
HR | 09.05.2018 | ||
IT | 09.05.2018 | ||
LT | 09.05.2018 | ||
LV | 09.05.2018 | ||
MC | 09.05.2018 | ||
NL | 09.05.2018 | ||
PL | 09.05.2018 | ||
RO | 09.05.2018 | ||
SE | 09.05.2018 | ||
SI | 09.05.2018 | ||
SK | 09.05.2018 | ||
TR | 09.05.2018 | ||
BG | 09.08.2018 | ||
NO | 09.08.2018 | ||
GR | 10.08.2018 | ||
Former [2020/02] | AT | 09.05.2018 | |
CZ | 09.05.2018 | ||
DK | 09.05.2018 | ||
EE | 09.05.2018 | ||
ES | 09.05.2018 | ||
FI | 09.05.2018 | ||
HR | 09.05.2018 | ||
IT | 09.05.2018 | ||
LT | 09.05.2018 | ||
LV | 09.05.2018 | ||
MC | 09.05.2018 | ||
NL | 09.05.2018 | ||
PL | 09.05.2018 | ||
RO | 09.05.2018 | ||
SE | 09.05.2018 | ||
SI | 09.05.2018 | ||
SK | 09.05.2018 | ||
BG | 09.08.2018 | ||
NO | 09.08.2018 | ||
GR | 10.08.2018 | ||
Former [2019/26] | AT | 09.05.2018 | |
CZ | 09.05.2018 | ||
DK | 09.05.2018 | ||
EE | 09.05.2018 | ||
ES | 09.05.2018 | ||
FI | 09.05.2018 | ||
HR | 09.05.2018 | ||
IT | 09.05.2018 | ||
LT | 09.05.2018 | ||
LV | 09.05.2018 | ||
NL | 09.05.2018 | ||
PL | 09.05.2018 | ||
RO | 09.05.2018 | ||
SE | 09.05.2018 | ||
SI | 09.05.2018 | ||
SK | 09.05.2018 | ||
BG | 09.08.2018 | ||
NO | 09.08.2018 | ||
GR | 10.08.2018 | ||
Former [2019/11] | AT | 09.05.2018 | |
CZ | 09.05.2018 | ||
DK | 09.05.2018 | ||
EE | 09.05.2018 | ||
ES | 09.05.2018 | ||
FI | 09.05.2018 | ||
HR | 09.05.2018 | ||
IT | 09.05.2018 | ||
LT | 09.05.2018 | ||
LV | 09.05.2018 | ||
NL | 09.05.2018 | ||
PL | 09.05.2018 | ||
RO | 09.05.2018 | ||
SE | 09.05.2018 | ||
SK | 09.05.2018 | ||
BG | 09.08.2018 | ||
NO | 09.08.2018 | ||
GR | 10.08.2018 | ||
Former [2019/10] | AT | 09.05.2018 | |
CZ | 09.05.2018 | ||
DK | 09.05.2018 | ||
EE | 09.05.2018 | ||
ES | 09.05.2018 | ||
FI | 09.05.2018 | ||
HR | 09.05.2018 | ||
LT | 09.05.2018 | ||
LV | 09.05.2018 | ||
NL | 09.05.2018 | ||
PL | 09.05.2018 | ||
RO | 09.05.2018 | ||
SE | 09.05.2018 | ||
SK | 09.05.2018 | ||
BG | 09.08.2018 | ||
NO | 09.08.2018 | ||
GR | 10.08.2018 | ||
Former [2019/09] | DK | 09.05.2018 | |
EE | 09.05.2018 | ||
ES | 09.05.2018 | ||
FI | 09.05.2018 | ||
HR | 09.05.2018 | ||
LT | 09.05.2018 | ||
LV | 09.05.2018 | ||
NL | 09.05.2018 | ||
SE | 09.05.2018 | ||
BG | 09.08.2018 | ||
NO | 09.08.2018 | ||
GR | 10.08.2018 | ||
Former [2019/08] | DK | 09.05.2018 | |
ES | 09.05.2018 | ||
FI | 09.05.2018 | ||
HR | 09.05.2018 | ||
LT | 09.05.2018 | ||
LV | 09.05.2018 | ||
NL | 09.05.2018 | ||
SE | 09.05.2018 | ||
BG | 09.08.2018 | ||
NO | 09.08.2018 | ||
GR | 10.08.2018 | ||
Former [2018/52] | ES | 09.05.2018 | |
FI | 09.05.2018 | ||
HR | 09.05.2018 | ||
LT | 09.05.2018 | ||
LV | 09.05.2018 | ||
NL | 09.05.2018 | ||
SE | 09.05.2018 | ||
BG | 09.08.2018 | ||
NO | 09.08.2018 | ||
GR | 10.08.2018 | ||
Former [2018/51] | ES | 09.05.2018 | |
FI | 09.05.2018 | ||
HR | 09.05.2018 | ||
LT | 09.05.2018 | ||
LV | 09.05.2018 | ||
SE | 09.05.2018 | ||
BG | 09.08.2018 | ||
NO | 09.08.2018 | ||
Former [2018/50] | ES | 09.05.2018 | |
FI | 09.05.2018 | ||
HR | 09.05.2018 | ||
LT | 09.05.2018 | ||
SE | 09.05.2018 | ||
BG | 09.08.2018 | ||
NO | 09.08.2018 | ||
Former [2018/49] | ES | 09.05.2018 | |
FI | 09.05.2018 | ||
LT | 09.05.2018 | ||
SE | 09.05.2018 | ||
BG | 09.08.2018 | ||
NO | 09.08.2018 | ||
Former [2018/47] | ES | 09.05.2018 | |
FI | 09.05.2018 | ||
LT | 09.05.2018 | ||
NO | 09.08.2018 | Cited in | International search | [X]EP1117031 (TEXAS INSTRUMENTS FRANCE [FR], et al) [X] 1-11 * paragraphs [0015] - [0027] * * paragraphs [0048] - [0100] * * figures 4-18 *; | [XA]WO03090055 (IBM [US], et al) [X] 1 * page 10, line 11 - page 20, line 5 * * figures 3-5 * [A] 4,6; | [XA]WO2004034251 (KONINKL PHILIPS ELECTRONICS NV [NL], et al) [X] 1 * page 3, line 20 - page 7, line 31 * * figure 1 * [A] 4,6; | [X]US6307281 (HOUSTON THEODORE W [US]) [X] 1 * column 3, line 57 - column 10, line 34 * * figures 1-6 * | Examination | US6112023 | - CHILDERS B R ET AL, "Scheduling with dynamic voltage/speed adjustment using slack reclamation in multiprocessor real-time systems", IEEE TRANSACTIONS ON PARALLEL AND DISTRIBUTED SYSTEMS, IEEE SERVICE CENTER, LOS ALAMITOS, CA, US, (20030701), vol. 14, no. 7, doi:10.1109/TPDS.2003.1214320, ISSN 1045-9219, pages 686 - 700, XP011098805 DOI: http://dx.doi.org/10.1109/TPDS.2003.1214320 | - JEJURIKAR R ET AL, "Dynamic slack reclamation with procrastination scheduling in real-time embedded systems", DESIGN AUTOMATION CONFERENCE, 2005. PROCEEDINGS. 42ND ANAHEIM, CA, USA 13-17 JUNE 2005, PISCATAWAY, NJ, USA,IEEE, US, (20050613), doi:10.1109/DAC.2005.193783, ISBN 978-1-59593-058-3, pages 111 - 116, XP010837187 DOI: http://dx.doi.org/10.1109/DAC.2005.193783 |