Extract from the Register of European Patents

EP About this file: EP2285689

EP2285689 - STRAPPING DEVICE WITH AN ENERGY STORAGE MEANS [Right-click to bookmark this link]
StatusThe application has been refused
Status updated on  23.03.2018
Database last updated on 14.03.2026
Most recent event   Tooltip23.03.2018Refusal of applicationpublished on 25.04.2018  [2018/17]
Applicant(s)For all designated states
Signode International IP Holdings LLC
3650 West Lake Ave
Glenview IL 60026 / US
[2015/52]
Former [2014/47]For all designated states
Premark Packaging LLC
3650 West Lake Avenue
Glenview, IL 60026 / US
Former [2014/39]For all designated states
Illinois Tool Works Inc.
3600 West Lake Avenue
Glenview, IL 60026 / US
Former [2011/08]For all designated states
Orgapack GmbH
Silbernstrasse 14
8953 Dietikon / CH
Inventor(s)01 / NEESER, Mirco
Badstrasse 18b
CH-5408 Ennetbaden / CH
02 / WIDMER, Roland
Itenstrasse 23
CH-5620 Bremgarten / CH
03 / FINZO, Flavio
Büntenstrasse 33
CH-5436 Würenlos / CH
 [2011/08]
Representative(s)Klein, Friedrich Jürgen, et al
Patentanwälte Klein & Klein
Grienbachstrasse 11
6300 Zug / CH
[N/P]
Former [2011/08]Klein, Friedrich Jürgen, et al
Patentanwälte Klein & Klein Grienbachstrasse 11
6300 Zug / CH
Application number, filing date09734679.506.01.2009
[2011/08]
WO2009CH00003
Priority number, dateCH2008006470823.04.2008         Original published format: CH 647082008
[2011/08]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2009129635
Date:29.10.2009
Language:DE
[2009/44]
Type: A1 Application with search report 
No.:EP2285689
Date:23.02.2011
Language:DE
The application published by WIPO in one of the EPO official languages on 29.10.2009 takes the place of the publication of the European patent application.
[2011/08]
Search report(s)International search report - published on:EP29.10.2009
ClassificationIPC:B65B13/02, B65B13/18, B65B13/32
[2011/08]
CPC:
B65B13/18 (EP,US); B65B13/187 (EP,US); B65B13/22 (US);
B65B13/322 (EP,US); B65B13/327 (EP,US)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2011/08]
TitleGerman:UMREIFUNGSVORRICHTUNG MIT EINEM ENERGIESPEICHER[2011/08]
English:STRAPPING DEVICE WITH AN ENERGY STORAGE MEANS[2011/08]
French:DISPOSITIF DE BANDEROLAGE COMPORTANT UN ACCUMULATEUR D'ÉNERGIE[2011/08]
Entry into regional phase23.11.2010National basic fee paid 
23.11.2010Designation fee(s) paid 
23.11.2010Examination fee paid 
Examination procedure23.11.2010Examination requested  [2011/08]
02.02.2011Amendment by applicant (claims and/or description)
28.04.2011Despatch of a communication from the examining division (Time limit: M08)
09.01.2012Reply to a communication from the examining division
10.05.2012Despatch of a communication from the examining division (Time limit: M06)
20.11.2012Reply to a communication from the examining division
06.12.2012Despatch of a communication from the examining division (Time limit: M06)
19.07.2013Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time
30.09.2013Reply to a communication from the examining division
07.10.2014Date of oral proceedings
28.10.2014Despatch of communication that the application is refused, reason: substantive examination [2018/17]
28.10.2014Minutes of oral proceedings despatched
16.01.2018Application refused, date of legal effect [2018/17]
Appeal following examination05.01.2015Appeal received No.  T0642/15
09.03.2015Statement of grounds filed
16.01.2018Result of appeal procedure: appeal of the applicant was rejected
16.01.2018Date of oral proceedings
22.01.2018Minutes of oral proceedings despatched
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  28.04.2011
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the examination report
30.09.2013Request for further processing filed
30.09.2013Full payment received (date of receipt of payment)
Request granted
15.10.2013Decision despatched
Fees paidRenewal fee
25.01.2011Renewal fee patent year 03
25.01.2012Renewal fee patent year 04
25.01.2013Renewal fee patent year 05
27.01.2014Renewal fee patent year 06
27.01.2015Renewal fee patent year 07
27.01.2016Renewal fee patent year 08
27.01.2017Renewal fee patent year 09
29.01.2018Renewal fee patent year 10
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inExaminationEP0744343
 US2003145900
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.