blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2283565

EP2283565 - ELECTRICAL MACHINE INCLUDING AXIAL CONNECTOR ASSEMBLIES AND RELATED METHODS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  20.05.2016
Database last updated on 03.08.2024
Most recent event   Tooltip17.08.2018Lapse of the patent in a contracting state
New state(s): BG
published on 19.09.2018  [2018/38]
Applicant(s)For all designated states
Siemens Energy, Inc.
4400 Alafaya Trail
Orlando, FL 32826-2399 / US
[2011/07]
Inventor(s)01 / TEKAWADE, Avinash, M.
1237 W. Double Eagle Court
Hernando FL 34442 / US
 [2015/29]
Former [2011/14]01 / TEKAWADE, Avinash, M.
1611 Valley Brooke Ct.
Wexford PA 15090 / US
Former [2011/07]01 / TEKAWADE, Avinash, M.
2704 Hunters Point Dr.
Wexford PA 15090 / US
Representative(s)Maier, Daniel Oliver, et al
Siemens AG
Postfach 22 16 34
80506 München / DE
[N/P]
Former [2014/35]Maier, Daniel Oliver, et al
Siemens AG
Postfach 22 16 34
80506 München / DE
Former [2014/19]McGowan, Nigel George, et al
Siemens AG
Postfach 22 16 34
80506 München / DE
Former [2011/07]Brocklehurst, Adam Jeffrey
Siemens AG Postfach 22 16 34
80506 München / DE
Application number, filing date09734822.131.03.2009
[2011/07]
WO2009US02001
Priority number, dateUS2008010638621.04.2008         Original published format: US 106386
[2011/07]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report
No.:WO2009131618
Date:29.10.2009
Language:EN
[2009/44]
Type: A2 Application without search report 
No.:EP2283565
Date:16.02.2011
Language:EN
The application published by WIPO in one of the EPO official languages on 29.10.2009 takes the place of the publication of the European patent application.
[2011/07]
Type: B1 Patent specification 
No.:EP2283565
Date:15.07.2015
Language:EN
[2015/29]
Search report(s)International search report - published on:EP25.03.2010
ClassificationIPC:H02K3/24, H02K3/12, H02K9/00, H02K3/50
[2015/01]
CPC:
H02K3/12 (EP,US); H02K9/00 (EP,US); H02K3/24 (EP,US);
H02K3/505 (EP,US); Y10T29/49009 (EP,US); Y10T29/49826 (EP,US)
Former IPC [2011/07]H02K15/00, H02K3/50
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2015/29]
Former [2011/07]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:ELEKTRISCHE MASCHINE MIT AXIALER VERBINDER UND ZUGEHÖRIGE VERFAHREN[2015/01]
English:ELECTRICAL MACHINE INCLUDING AXIAL CONNECTOR ASSEMBLIES AND RELATED METHODS[2011/07]
French:MACHINE ÉLECTRIQUE COMPRENANT DES ENSEMBLES RACCORDS AXIAUX ET PROCÉDÉS ASSOCIÉS[2011/07]
Former [2011/07]ELEKTRISCHE MASCHINE MIT AXIALVERBINDERBAUGRUPPEN UND DIESBEZÜGLICHE VERFAHREN
Entry into regional phase17.11.2010National basic fee paid 
17.11.2010Designation fee(s) paid 
17.11.2010Examination fee paid 
Examination procedure16.11.2010Amendment by applicant (claims and/or description)
17.11.2010Examination requested  [2011/07]
04.11.2013Despatch of a communication from the examining division (Time limit: M06)
11.06.2014Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time
08.07.2014Reply to a communication from the examining division
06.02.2015Communication of intention to grant the patent
25.03.2015Receipt of the translation of the claim(s)
03.06.2015Fee for grant paid
03.06.2015Fee for publishing/printing paid
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  04.11.2013
Opposition(s)18.04.2016No opposition filed within time limit [2016/25]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the examination report
08.07.2014Request for further processing filed
08.07.2014Full payment received (date of receipt of payment)
Request granted
16.07.2014Decision despatched
Fees paidRenewal fee
21.03.2011Renewal fee patent year 03
19.03.2012Renewal fee patent year 04
19.03.2013Renewal fee patent year 05
20.03.2014Renewal fee patent year 06
20.03.2015Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU31.03.2009
AT15.07.2015
BE15.07.2015
BG15.07.2015
CY15.07.2015
CZ15.07.2015
DK15.07.2015
EE15.07.2015
ES15.07.2015
FI15.07.2015
HR15.07.2015
IS15.07.2015
LT15.07.2015
LV15.07.2015
MC15.07.2015
MK15.07.2015
MT15.07.2015
NL15.07.2015
PL15.07.2015
RO15.07.2015
SE15.07.2015
SI15.07.2015
SK15.07.2015
TR15.07.2015
NO15.10.2015
GR16.10.2015
PT16.11.2015
CH31.03.2016
IE31.03.2016
LI31.03.2016
LU31.03.2016
[2018/38]
Former [2018/30]HU31.03.2009
AT15.07.2015
BE15.07.2015
CY15.07.2015
CZ15.07.2015
DK15.07.2015
EE15.07.2015
ES15.07.2015
FI15.07.2015
HR15.07.2015
IS15.07.2015
LT15.07.2015
LV15.07.2015
MC15.07.2015
MK15.07.2015
MT15.07.2015
NL15.07.2015
PL15.07.2015
RO15.07.2015
SE15.07.2015
SI15.07.2015
SK15.07.2015
TR15.07.2015
NO15.10.2015
GR16.10.2015
PT16.11.2015
CH31.03.2016
IE31.03.2016
LI31.03.2016
LU31.03.2016
Former [2018/28]HU31.03.2009
AT15.07.2015
BE15.07.2015
CY15.07.2015
CZ15.07.2015
DK15.07.2015
EE15.07.2015
ES15.07.2015
FI15.07.2015
HR15.07.2015
IS15.07.2015
LT15.07.2015
LV15.07.2015
MC15.07.2015
MK15.07.2015
MT15.07.2015
NL15.07.2015
PL15.07.2015
RO15.07.2015
SE15.07.2015
SI15.07.2015
SK15.07.2015
NO15.10.2015
GR16.10.2015
PT16.11.2015
CH31.03.2016
IE31.03.2016
LI31.03.2016
LU31.03.2016
Former [2017/40]AT15.07.2015
BE15.07.2015
CZ15.07.2015
DK15.07.2015
EE15.07.2015
ES15.07.2015
FI15.07.2015
HR15.07.2015
IS15.07.2015
LT15.07.2015
LV15.07.2015
MC15.07.2015
MT15.07.2015
NL15.07.2015
PL15.07.2015
RO15.07.2015
SE15.07.2015
SI15.07.2015
SK15.07.2015
NO15.10.2015
GR16.10.2015
PT16.11.2015
CH31.03.2016
IE31.03.2016
LI31.03.2016
LU31.03.2016
Former [2017/07]AT15.07.2015
BE15.07.2015
CZ15.07.2015
DK15.07.2015
EE15.07.2015
ES15.07.2015
FI15.07.2015
HR15.07.2015
IS15.07.2015
LT15.07.2015
LV15.07.2015
MC15.07.2015
PL15.07.2015
RO15.07.2015
SE15.07.2015
SI15.07.2015
SK15.07.2015
NO15.10.2015
GR16.10.2015
PT16.11.2015
CH31.03.2016
IE31.03.2016
LI31.03.2016
LU31.03.2016
Former [2017/03]AT15.07.2015
BE15.07.2015
CZ15.07.2015
DK15.07.2015
EE15.07.2015
ES15.07.2015
FI15.07.2015
HR15.07.2015
IS15.07.2015
LT15.07.2015
LV15.07.2015
MC15.07.2015
PL15.07.2015
RO15.07.2015
SE15.07.2015
SI15.07.2015
SK15.07.2015
NO15.10.2015
GR16.10.2015
PT16.11.2015
LU31.03.2016
Former [2016/49]AT15.07.2015
CZ15.07.2015
DK15.07.2015
EE15.07.2015
ES15.07.2015
FI15.07.2015
HR15.07.2015
IS15.07.2015
LT15.07.2015
LV15.07.2015
MC15.07.2015
PL15.07.2015
RO15.07.2015
SE15.07.2015
SI15.07.2015
SK15.07.2015
NO15.10.2015
GR16.10.2015
PT16.11.2015
BE31.03.2016
LU31.03.2016
Former [2016/47]AT15.07.2015
CZ15.07.2015
DK15.07.2015
EE15.07.2015
ES15.07.2015
FI15.07.2015
HR15.07.2015
IS15.07.2015
LT15.07.2015
LV15.07.2015
PL15.07.2015
RO15.07.2015
SE15.07.2015
SI15.07.2015
SK15.07.2015
NO15.10.2015
GR16.10.2015
PT16.11.2015
BE31.03.2016
LU31.03.2016
Former [2016/36]AT15.07.2015
CZ15.07.2015
DK15.07.2015
EE15.07.2015
ES15.07.2015
FI15.07.2015
HR15.07.2015
IS15.07.2015
LT15.07.2015
LV15.07.2015
PL15.07.2015
RO15.07.2015
SE15.07.2015
SI15.07.2015
SK15.07.2015
NO15.10.2015
GR16.10.2015
PT16.11.2015
BE31.03.2016
Former [2016/31]AT15.07.2015
CZ15.07.2015
DK15.07.2015
EE15.07.2015
ES15.07.2015
FI15.07.2015
HR15.07.2015
IS15.07.2015
LT15.07.2015
LV15.07.2015
PL15.07.2015
RO15.07.2015
SE15.07.2015
SK15.07.2015
NO15.10.2015
GR16.10.2015
PT16.11.2015
Former [2016/23]AT15.07.2015
CZ15.07.2015
DK15.07.2015
EE15.07.2015
ES15.07.2015
FI15.07.2015
HR15.07.2015
LT15.07.2015
LV15.07.2015
PL15.07.2015
RO15.07.2015
SE15.07.2015
SK15.07.2015
NO15.10.2015
GR16.10.2015
PT16.11.2015
Former [2016/22]AT15.07.2015
CZ15.07.2015
DK15.07.2015
EE15.07.2015
ES15.07.2015
FI15.07.2015
HR15.07.2015
LT15.07.2015
LV15.07.2015
PL15.07.2015
SE15.07.2015
NO15.10.2015
GR16.10.2015
PT16.11.2015
Former [2016/20]AT15.07.2015
DK15.07.2015
ES15.07.2015
FI15.07.2015
HR15.07.2015
LT15.07.2015
LV15.07.2015
PL15.07.2015
SE15.07.2015
NO15.10.2015
GR16.10.2015
PT16.11.2015
Former [2016/11]AT15.07.2015
ES15.07.2015
FI15.07.2015
HR15.07.2015
LT15.07.2015
LV15.07.2015
PL15.07.2015
SE15.07.2015
NO15.10.2015
GR16.10.2015
PT16.11.2015
Former [2016/10]ES15.07.2015
FI15.07.2015
HR15.07.2015
LT15.07.2015
LV15.07.2015
PL15.07.2015
SE15.07.2015
NO15.10.2015
GR16.10.2015
PT16.11.2015
Former [2016/09]FI15.07.2015
LT15.07.2015
LV15.07.2015
NO15.10.2015
GR16.10.2015
Former [2016/08]LT15.07.2015
NO15.10.2015
Former [2016/07]LT15.07.2015
Cited inInternational search[AD]WO2006063186  (SIEMENS POWER GENERATION INC [US], et al) [AD] 1,9,15 * page 1, line 1 - line 18; figures 1,3 *;
 [A]US3693036  (SCHMITT NIKOLAS) [A] 1,9,15 * column 2, line 41 - line 56; figure 1 *;
 [AD]US4894575  (NILSSON LENNART S [US], et al) [AD] 1,9,15 * figures 1,2 *;
 [A]US5809632  (CHAMPAGNE ALAIN [FR], et al) [A] 1,9 * figure 4 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.