blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2280568

EP2280568 - MOBILE COMMUNICATION SYSTEM, BASE STATION DEVICE, MOBILE STATION DEVICE, AND MOBILE COMMUNICATION METHOD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  22.10.2021
Database last updated on 11.09.2024
FormerThe patent has been granted
Status updated on  13.11.2020
FormerGrant of patent is intended
Status updated on  08.07.2020
FormerExamination is in progress
Status updated on  01.09.2017
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024 [2024/41]
Applicant(s)For all designated states
Sharp Kabushiki Kaisha
22-22, Nagaike-cho
Abeno-ku
Osaka-shi, Osaka 545-8522 / JP
[2020/51]
Former [2011/05]For all designated states
Sharp Kabushiki Kaisha
22-22, Nagaike-cho Abeno-ku Osaka-shi
Osaka 545-8522 / JP
Inventor(s)01 / AKIMOTO, Yosuke
c/o SHARP KABUSHIKI KAISHA
22-22, Nagaike-cho
Abeno-ku
Osaka-shi
Osaka 545-8522 / JP
02 / AIBA, Tatsushi
c/o SHARP KABUSHIKI KAISHA
22-22, Nagaike-cho
Abeno-ku
Osaka-shi
Osaka 545-8522 / JP
03 / SATO, Seiji
c/o SHARP KABUSHIKI KAISHA
22-22, Nagaike-cho
Abeno-ku
Osaka-shi
Osaka 545-8522 / JP
04 / YAMADA, Shohei
c/o SHARP KABUSHIKI KAISHA
22-22, Nagaike-cho
Abeno-ku
Osaka-shi
Osaka 545-8522 / JP
 [2020/51]
Former [2011/05]01 / AKIMOTO, Yosuke
c/o SHARP KABUSHIKI KAISHA 22-22, Nagaike-cho Abeno-ku Osaka-shi
Osaka 545-8522 / JP
02 / AIBA, Tatsushi
c/o SHARP KABUSHIKI KAISHA 22-22, Nagaike-cho Abeno-ku Osaka-shi
Osaka 545-8522 / JP
03 / SATO, Seiji
c/o SHARP KABUSHIKI KAISHA 22-22, Nagaike-cho Abeno-ku Osaka-shi
Osaka 545-8522 / JP
04 / YAMADA, Shohei
c/o SHARP KABUSHIKI KAISHA 22-22, Nagaike-cho Abeno-ku Osaka-shi
Osaka 545-8522 / JP
Representative(s)Müller Hoffmann & Partner
Patentanwälte mbB
St.-Martin-Straße 58
81541 München / DE
[N/P]
Former [2020/51]Müller Hoffmann & Partner
Patentanwälte mbB
St.-Martin-Strasse 58
81541 München / DE
Former [2011/05]Müller - Hoffmann & Partner
Patentanwälte Innere Wiener Strasse 17
81667 München / DE
Application number, filing date09735607.523.04.2009
[2011/05]
WO2009JP58038
Priority number, dateJP2008011473025.04.2008         Original published format: JP 2008114730
[2011/05]
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2009131163
Date:29.10.2009
Language:JA
[2009/44]
Type: A1 Application with search report 
No.:EP2280568
Date:02.02.2011
Language:EN
[2011/05]
Type: B1 Patent specification 
No.:EP2280568
Date:16.12.2020
Language:EN
[2020/51]
Search report(s)International search report - published on:JP29.10.2009
(Supplementary) European search report - dispatched on:EP06.08.2015
ClassificationIPC:H04L5/00, H04W72/04, H04B7/06, // H04L25/03
[2015/37]
CPC:
H04B7/0621 (EP,US); H04W72/23 (US); H04B7/0656 (EP,US);
H04L5/0023 (EP,US); H04L5/0053 (EP,US); H04L5/0057 (EP,US);
H04L2025/03777 (EP,US); H04L25/03343 (EP,US) (-)
Former IPC [2011/05]H04W24/10, H04J11/00, H04J99/00
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2020/51]
Former [2011/05]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  SE,  SI,  SK,  TR 
TitleGerman:MOBILES KOMMUNIKATIONSSYSTEM, BASISSTATIONSVORRICHTUNG, MOBILSTATIONSVORRICHTUNG UND MOBILKOMMUNIKATIONSSYSTEM[2011/05]
English:MOBILE COMMUNICATION SYSTEM, BASE STATION DEVICE, MOBILE STATION DEVICE, AND MOBILE COMMUNICATION METHOD[2011/05]
French:SYSTÈME DE COMMUNICATION MOBILE, DISPOSITIF DE STATION DE BASE, DISPOSITIF DE STATION MOBILE, ET PROCÉDÉ DE COMMUNICATION MOBILE[2011/05]
Entry into regional phase25.10.2010Translation filed 
25.10.2010National basic fee paid 
25.10.2010Search fee paid 
25.10.2010Designation fee(s) paid 
25.10.2010Examination fee paid 
Examination procedure25.10.2010Examination requested  [2011/05]
02.03.2016Amendment by applicant (claims and/or description)
05.09.2017Despatch of a communication from the examining division (Time limit: M04)
20.12.2017Reply to a communication from the examining division
11.06.2018Despatch of a communication from the examining division (Time limit: M04)
12.10.2018Reply to a communication from the examining division
09.07.2020Communication of intention to grant the patent
09.11.2020Fee for grant paid
09.11.2020Fee for publishing/printing paid
09.11.2020Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  05.09.2017
Opposition(s)17.09.2021No opposition filed within time limit [2021/47]
Fees paidRenewal fee
29.04.2011Renewal fee patent year 03
30.03.2012Renewal fee patent year 04
26.04.2013Renewal fee patent year 05
25.03.2014Renewal fee patent year 06
21.04.2015Renewal fee patent year 07
29.03.2016Renewal fee patent year 08
21.04.2017Renewal fee patent year 09
23.04.2018Renewal fee patent year 10
23.04.2019Renewal fee patent year 11
27.04.2020Renewal fee patent year 12
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU23.04.2009
AT16.12.2020
CY16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
ES16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
MK16.12.2020
MT16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
IE23.04.2021
LU23.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
[2024/41]
Former [2024/22]HU23.04.2009
AT16.12.2020
CY16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
ES16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
MK16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
IE23.04.2021
LU23.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
Former [2023/29]HU23.04.2009
AT16.12.2020
CY16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
ES16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
IE23.04.2021
LU23.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
Former [2023/24]AT16.12.2020
CY16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
ES16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
IE23.04.2021
LU23.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
Former [2022/34]AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
ES16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
IE23.04.2021
LU23.04.2021
BE30.04.2021
CH30.04.2021
LI30.04.2021
Former [2022/23]AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
ES16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
IE23.04.2021
LU23.04.2021
CH30.04.2021
LI30.04.2021
Former [2022/21]AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
ES16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
IE23.04.2021
LU23.04.2021
CH30.04.2021
LI30.04.2021
Former [2022/11]AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
ES16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
SE16.12.2020
SI16.12.2020
SK16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
LU23.04.2021
CH30.04.2021
LI30.04.2021
Former [2022/10]AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
ES16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
SE16.12.2020
SK16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
LU23.04.2021
CH30.04.2021
LI30.04.2021
Former [2022/04]AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
ES16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
SE16.12.2020
SK16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
LU23.04.2021
Former [2021/51]AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
ES16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
SE16.12.2020
SK16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
Former [2021/50]AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
MC16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
SE16.12.2020
SK16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
Former [2021/49]AT16.12.2020
CZ16.12.2020
DK16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
SE16.12.2020
SK16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
Former [2021/48]AT16.12.2020
CZ16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
IT16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
SE16.12.2020
SK16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
Former [2021/42]AT16.12.2020
CZ16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
SE16.12.2020
SK16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
IS16.04.2021
PT16.04.2021
Former [2021/39]AT16.12.2020
CZ16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
PL16.12.2020
RO16.12.2020
SE16.12.2020
SK16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
Former [2021/37]AT16.12.2020
CZ16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
RO16.12.2020
SE16.12.2020
SK16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
Former [2021/36]CZ16.12.2020
EE16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
RO16.12.2020
SE16.12.2020
SK16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
Former [2021/35]CZ16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
RO16.12.2020
SE16.12.2020
SK16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
Former [2021/34]CZ16.12.2020
FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
SE16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
Former [2021/33]FI16.12.2020
HR16.12.2020
LT16.12.2020
LV16.12.2020
NL16.12.2020
SE16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
PT16.04.2021
Former [2021/30]FI16.12.2020
HR16.12.2020
LV16.12.2020
NL16.12.2020
SE16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
Former [2021/28]FI16.12.2020
HR16.12.2020
LV16.12.2020
SE16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
Former [2021/24]FI16.12.2020
LV16.12.2020
SE16.12.2020
BG16.03.2021
NO16.03.2021
GR17.03.2021
Former [2021/23]FI16.12.2020
LV16.12.2020
SE16.12.2020
NO16.03.2021
GR17.03.2021
Former [2021/22]FI16.12.2020
NO16.03.2021
Former [2021/20]FI16.12.2020
Documents cited:Search[E]WO2009128604  (LG ELECTRONICS INC [KR], et al) [E] 1-7 * page 7, line 7 - page 8, line 10 *;
 [X]  - SHARP, "PMI Synchronization issues", 3GPP DRAFT; R1-081244-PMI_SYNCHRONIZATION_ISSUE, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20080326), vol. RAN WG1, no. Shenzhen, China; 20080326, XP050109687 [X] 1-7 * sections I-III and appendixes 1-3 *
 [X]  - NTT DOCOMO ET AL, "Investigation on PMI Indication Schemes for Single-User MIMO Precoding in E-UTRA Downlink", 3GPP DRAFT; R1-081037 DL PMI INDICATION FOR MIMO, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20080205), vol. RAN WG1, no. Sorrento, Italy; 20080205, XP050109495 [X] 1-7 * sections I-VII *
 [A]  - ZTE CHTTL, "Signaling of the Precoder for DL MU-MIMO", 3GPP DRAFT; R1-081416 SIGNALING OF THE PRECODER FOR DL MU-MIMO, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20080326), vol. RAN WG1, no. Shenzhen, China; 20080326, XP050109833 [A] 1-7 * sections I-III *
International search[A]  - HUAWEI, "Overhead reduction of UL CQI signalling for E-UTRA DL", 3GPP TSG RAN WG1 #47, R1-063055, (20061106), XP008143399
 [A]  - FREESCALE SEMICONDUCTOR INC, "Efficient method for feedback reduction and feedback mechanism for precoded MIMO in EUTRA", 3GPP TSG RAN WG1 #47, R1-063156, (20061106), XP008143400
by applicant   - "PMI Downlink Signaling and Downlink PDCCH Format", 3GPP TSG RAN WG1 #49BIS, RI-073077
    - "MIMO Related DL Control Signalling", 3GPP TSG-RAN WG1 #51, RI-074844
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.