EP2361293 - METHOD OF REDUCING CORROSION IN A CRUDE UNIT [Right-click to bookmark this link] | |||
Former [2011/35] | METHOD OF REDUCING CORROSION IN A CRUDE UNIT | ||
[2020/13] | Status | No opposition filed within time limit Status updated on 02.07.2021 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 24.07.2020 | ||
Former | Grant of patent is intended Status updated on 17.03.2020 | ||
Former | Examination is in progress Status updated on 06.06.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Nalco Company 1601 West Diehl Road Naperville, IL 60563-1198 / US | [2020/35] |
Former [2011/35] | For all designated states Nalco Company 1601 West Diehl Road Naperville, IL 60563-1198 / US | Inventor(s) | 01 /
SCATTERGOOD, Glenn, L. 112 Dogwood Street Sugar Land, Texas 77478 / US | 02 /
FERGUSON, Sam 13627 Runney Meade Sugar Land, Texas 77498 / US | [2011/35] | Representative(s) | HGF HGF Limited 1 City Walk Leeds LS11 9DX / GB | [N/P] |
Former [2020/35] | HGF 1 City Walk Leeds LS11 9DX / GB | ||
Former [2013/32] | Chalk, Anthony John, et al Harrison Goddard Foote LLP Saviour House 9 St Saviourgate York YO1 8NQ / GB | ||
Former [2011/35] | Harrison Goddard Foote 106 Micklegate York North Yorkshire YO1 6JX / GB | Application number, filing date | 09759828.8 | 03.11.2009 | [2020/35] | WO2009US63028 | Priority number, date | US20080263904 | 03.11.2008 Original published format: US 263904 | [2011/35] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2010062728 | Date: | 03.06.2010 | Language: | EN | [2010/22] | Type: | A1 Application with search report | No.: | EP2361293 | Date: | 31.08.2011 | Language: | EN | The application published by WIPO in one of the EPO official languages on 03.06.2010 takes the place of the publication of the European patent application. | [2011/35] | Type: | B1 Patent specification | No.: | EP2361293 | Date: | 26.08.2020 | Language: | EN | [2020/35] | Search report(s) | International search report - published on: | EP | 03.06.2010 | Classification | IPC: | C10G7/10, C10G75/02 | [2011/35] | CPC: |
C10G75/00 (EP,US);
C10G7/10 (EP,KR,US);
C10G31/08 (EP,US);
C10G7/12 (EP,US);
C10G75/02 (EP,KR,US);
G01N17/006 (US);
G01N17/008 (EP,US);
G01N17/04 (US);
G06Q50/04 (KR);
C10G2300/4075 (EP,US)
(-)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2020/35] | Extension states | AL | Not yet paid | BA | Not yet paid | RS | Not yet paid | Title | German: | VERFAHREN ZUR KORROSIONSVERMINDERUNG VON ROHÖLEINHEITEN | [2020/13] | English: | METHOD OF REDUCING CORROSION IN A CRUDE UNIT | [2020/13] | French: | MÉTHODE POUR RÉDUIRE LA CORROSION DANS D'UNITES DE PETROLE BRUT | [2020/13] |
Former [2011/35] | VERFAHREN ZUR VERRINGERUNG VON KORROSION IN EINER ROHÖLEINHEIT | ||
Former [2011/35] | METHOD OF REDUCING CORROSION IN A CRUDE UNIT | ||
Former [2011/35] | PROCÉDÉ DE RÉDUCTION DE LA CORROSION DANS UNE UNITÉ DE PRODUCTION DE PÉTROLE BRUT | Entry into regional phase | 16.05.2011 | National basic fee paid | 16.05.2011 | Designation fee(s) paid | 16.05.2011 | Examination fee paid | Examination procedure | 16.05.2011 | Examination requested [2011/35] | 23.01.2012 | Amendment by applicant (claims and/or description) | 06.12.2012 | Despatch of a communication from the examining division (Time limit: M04) | 05.04.2013 | Reply to a communication from the examining division | 26.05.2017 | Despatch of a communication from the examining division (Time limit: M06) | 29.11.2017 | Reply to a communication from the examining division | 30.05.2018 | Despatch of a communication from the examining division (Time limit: M06) | 25.10.2018 | Reply to a communication from the examining division | 19.02.2020 | Cancellation of oral proceeding that was planned for 03.03.2020 | 03.03.2020 | Date of oral proceedings (cancelled) | 18.03.2020 | Communication of intention to grant the patent | 16.07.2020 | Fee for grant paid | 16.07.2020 | Fee for publishing/printing paid | 16.07.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | EP20186320.6 / EP3744815 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 06.12.2012 | Opposition(s) | 27.05.2021 | No opposition filed within time limit [2021/31] | Fees paid | Renewal fee | 23.11.2011 | Renewal fee patent year 03 | 26.11.2012 | Renewal fee patent year 04 | 18.11.2013 | Renewal fee patent year 05 | 10.11.2014 | Renewal fee patent year 06 | 10.11.2015 | Renewal fee patent year 07 | 10.11.2016 | Renewal fee patent year 08 | 13.11.2017 | Renewal fee patent year 09 | 14.11.2018 | Renewal fee patent year 10 | 14.11.2019 | Renewal fee patent year 11 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 03.11.2009 | AT | 26.08.2020 | CY | 26.08.2020 | CZ | 26.08.2020 | DK | 26.08.2020 | EE | 26.08.2020 | FI | 26.08.2020 | HR | 26.08.2020 | LT | 26.08.2020 | LV | 26.08.2020 | MC | 26.08.2020 | MK | 26.08.2020 | MT | 26.08.2020 | PL | 26.08.2020 | RO | 26.08.2020 | SE | 26.08.2020 | SI | 26.08.2020 | SK | 26.08.2020 | SM | 26.08.2020 | TR | 26.08.2020 | IE | 03.11.2020 | LU | 03.11.2020 | BG | 26.11.2020 | NO | 26.11.2020 | GR | 27.11.2020 | CH | 30.11.2020 | LI | 30.11.2020 | IS | 26.12.2020 | PT | 28.12.2020 | [2022/32] |
Former [2022/27] | HU | 03.11.2009 | |
AT | 26.08.2020 | ||
CY | 26.08.2020 | ||
CZ | 26.08.2020 | ||
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
FI | 26.08.2020 | ||
HR | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
MC | 26.08.2020 | ||
MT | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
SE | 26.08.2020 | ||
SI | 26.08.2020 | ||
SK | 26.08.2020 | ||
SM | 26.08.2020 | ||
TR | 26.08.2020 | ||
IE | 03.11.2020 | ||
LU | 03.11.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
CH | 30.11.2020 | ||
LI | 30.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
Former [2022/26] | AT | 26.08.2020 | |
CZ | 26.08.2020 | ||
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
FI | 26.08.2020 | ||
HR | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
MC | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
SE | 26.08.2020 | ||
SI | 26.08.2020 | ||
SK | 26.08.2020 | ||
SM | 26.08.2020 | ||
TR | 26.08.2020 | ||
IE | 03.11.2020 | ||
LU | 03.11.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
CH | 30.11.2020 | ||
LI | 30.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
Former [2021/46] | AT | 26.08.2020 | |
CZ | 26.08.2020 | ||
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
FI | 26.08.2020 | ||
HR | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
MC | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
SE | 26.08.2020 | ||
SI | 26.08.2020 | ||
SK | 26.08.2020 | ||
SM | 26.08.2020 | ||
IE | 03.11.2020 | ||
LU | 03.11.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
CH | 30.11.2020 | ||
LI | 30.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
Former [2021/37] | AT | 26.08.2020 | |
CZ | 26.08.2020 | ||
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
FI | 26.08.2020 | ||
HR | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
MC | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
SE | 26.08.2020 | ||
SI | 26.08.2020 | ||
SK | 26.08.2020 | ||
SM | 26.08.2020 | ||
LU | 03.11.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
CH | 30.11.2020 | ||
LI | 30.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
Former [2021/36] | AT | 26.08.2020 | |
CZ | 26.08.2020 | ||
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
FI | 26.08.2020 | ||
HR | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
MC | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
SE | 26.08.2020 | ||
SI | 26.08.2020 | ||
SK | 26.08.2020 | ||
SM | 26.08.2020 | ||
LU | 03.11.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
Former [2021/33] | AT | 26.08.2020 | |
CZ | 26.08.2020 | ||
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
FI | 26.08.2020 | ||
HR | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
MC | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
SE | 26.08.2020 | ||
SK | 26.08.2020 | ||
SM | 26.08.2020 | ||
LU | 03.11.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
Former [2021/31] | AT | 26.08.2020 | |
CZ | 26.08.2020 | ||
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
FI | 26.08.2020 | ||
HR | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
MC | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
SE | 26.08.2020 | ||
SK | 26.08.2020 | ||
SM | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
Former [2021/28] | AT | 26.08.2020 | |
CZ | 26.08.2020 | ||
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
FI | 26.08.2020 | ||
HR | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
SE | 26.08.2020 | ||
SK | 26.08.2020 | ||
SM | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
Former [2021/24] | AT | 26.08.2020 | |
CZ | 26.08.2020 | ||
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
FI | 26.08.2020 | ||
HR | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
SE | 26.08.2020 | ||
SM | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
Former [2021/23] | CZ | 26.08.2020 | |
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
FI | 26.08.2020 | ||
HR | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
SE | 26.08.2020 | ||
SM | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
Former [2021/22] | CZ | 26.08.2020 | |
DK | 26.08.2020 | ||
EE | 26.08.2020 | ||
FI | 26.08.2020 | ||
HR | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
PL | 26.08.2020 | ||
RO | 26.08.2020 | ||
SE | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
Former [2021/20] | DK | 26.08.2020 | |
FI | 26.08.2020 | ||
HR | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
PL | 26.08.2020 | ||
SE | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
Former [2021/10] | FI | 26.08.2020 | |
HR | 26.08.2020 | ||
LT | 26.08.2020 | ||
LV | 26.08.2020 | ||
PL | 26.08.2020 | ||
SE | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
IS | 26.12.2020 | ||
PT | 28.12.2020 | ||
Former [2021/09] | FI | 26.08.2020 | |
LT | 26.08.2020 | ||
SE | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
GR | 27.11.2020 | ||
PT | 28.12.2020 | ||
Former [2021/08] | FI | 26.08.2020 | |
LT | 26.08.2020 | ||
SE | 26.08.2020 | ||
BG | 26.11.2020 | ||
NO | 26.11.2020 | ||
PT | 28.12.2020 | ||
Former [2021/07] | FI | 26.08.2020 | |
LT | 26.08.2020 | ||
NO | 26.11.2020 | Cited in | International search | [X]GB1198734 (NALCO CHEMICAL CO [US]) [X] 1-15 * page 1 - page 2; example 1 *; | [X]US3779905 (STEDMAN R) [X] 1-15 * column 6, line 66 - column 7, line 12; claim 1 *; | [X]US3819328 (GO T) [X] 1-15 * column 2, line 54 - column 4, line 66; example A; claim 1 *; | [X]US4238349 (LARSEN ARTHUR L [SE], et al) [X] 1-15* column 4, line 65 - column 5, line 2; example 2; claim 1 *; | [X]US5256276 (WEAVER CARL E [US]) [X] 1-15 * column 2, line 1 - line 52; claims 1,2 *; | [X]US5302253 (LESSARD RONALD B [US], et al) [X] 1-15 * column 2, line 32 - column 5, line 32; figures 1,2; claim 1 *; | [X]US5965785 (BRADEN VERONICA K [US], et al) [X] 1-15 * column 8, line 3 - line 9 * * column 9, line 32 - column 12, line 36; figure 1; example 5; claim 1 *; | [X]WO03006581 (EXXON MOBILE AND ENGINEERING C [US]) [X] 1-15 * paragraphs [0002] , [0012]; claim 1 *; | [X]EP1298185 (VERCAMMEN FERNAND [BE]) [X] 1-15 * paragraphs [0001] - [0003] - [0023] , [0037]; claims 1,7 *; | [X]WO2004044266 (KURITA WATER IND LTD [JP], et al) [X] 1-15 * pages 1-4,7,12 *; | [X]WO2008005058 (BAKER HUGHES INC [US]) [X] 1-15 * page 14, line 1 - line 13; claim 1 *; | [X] - LITTLE R S ET AL, "HOW TO CONTROL ...//CRUDE UNIT OVERHEAD CORROSION", HYDROCARBON PROCESSING, GULF PUBLISHING CO. HOUSTON, US, (19770501), vol. 56, no. 5, ISSN 0018-8190, pages 205 - 207, XP001048730 [X] 1-15 * page 205 - page 206; figure 2 * | [X] - SZYPROWSKI A J ET AL, "ANTICORROSION TECHNOLOGY DEMONSTRATED AT POLISH REFINERY", OIL AND GAS JOURNAL, PENNWELL, HOUSTON, TX, US, (19870504), vol. 85, no. 18, ISSN 0030-1388, pages 33 - 37, XP001048726 [X] 1-15 * page 35 - page 37 * |