EP2299609 - METHOD AND EQUIPMENT FOR TRANSMITTING THE UPLINK BURST DATA IN THE PASSIVE OPTICAL NETWORK SYSTEM [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 14.03.2014 Database last updated on 14.06.2024 | Most recent event Tooltip | 17.07.2015 | Lapse of the patent in a contracting state New state(s): HU, LU | published on 19.08.2015 [2015/34] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [N/P] |
Former [2011/12] | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District, Shenzhen Guangdong 518129 / CN | ||
Former [2011/12] | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | Inventor(s) | 01 /
GENG, Dongyu@c/o Huawei Technologies Co., Ltd., Int.Prop.Dept. B1-3A, Bantian, Longgang District 518129 Shenzhen / CN | 02 /
FENG, Dongning@c/o Huawei Technologies Co., Ltd., Int.Prop.Dept. B1-3A, Bantian, Longgang District 518129 Shenzhen / CN | 03 /
LI, Jing@c/o Huawei Technologies Co., Ltd., Int.Prop.Dept. B1-3A, Bantian, Longgang District 518129 Shenzhen / CN | 04 /
LIANG, Weiguang@c/o Huawei Technologies Co., Ltd., Int.Prop.Dept. B1-3A, Bantian, Longgang District 518129 Shenzhen / CN | 05 /
EFFENBERGER, Frank@c/o Huawei Technologies Co., Ltd., Int.Prop.Dept. B1-3A, Bantian, Longgang District 518129 Shenzhen / CN | [2013/19] |
Former [2011/12] | 01 /
GENG, Dongyu c/o Huawei Technologies Co., Ltd., Int.Prop.Dept. B1-3A, Bantian, Longgang District 518129 Shenzhen / CN | ||
02 /
FENG, Dongning c/o Huawei Technologies Co., Ltd., Int.Prop.Dept. B1-3A, Bantian, Longgang District 518129 Shenzhen / CN | |||
03 /
LI, Jing c/o Huawei Technologies Co., Ltd., Int.Prop.Dept. B1-3A, Bantian, Longgang District 518129 Shenzhen / CN | |||
04 /
LIANG, Weiguang c/o Huawei Technologies Co., Ltd., Int.Prop.Dept. B1-3A, Bantian, Longgang District 518129 Shenzhen / CN | |||
05 /
EFFENBERGER, Frank c/o Huawei Technologies Co., Ltd., Int.Prop.Dept. B1-3A, Bantian, Longgang District 518129 Shenzhen / CN | Representative(s) | Kreuz, Georg Maria, et al Huawei Technologies Duesseldorf GmbH Riesstraße 25 80992 München / DE | [N/P] |
Former [2011/21] | Kreuz, Georg Maria, et al Huawei Technologies Duesseldorf GmbH Dessauerstrasse 3 80992 München / DE | ||
Former [2011/12] | Kreuz, Georg Maria, et al Huawei Technologies Riesstrasse 25 80992 München / DE | Application number, filing date | 09765397.6 | 16.06.2009 | [2011/12] | WO2009CN72290 | Priority number, date | CN2008168007 | 19.06.2008 Original published format: CN200810068007 | WO2008CN73140 | 21.11.2008 Original published format: PCT/CN2008/073140 | CN2009108103 | 02.03.2009 Original published format: CN200910008103 | [2011/12] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2009152758 | Date: | 23.12.2009 | Language: | ZH | [2009/52] | Type: | A1 Application with search report | No.: | EP2299609 | Date: | 23.03.2011 | Language: | EN | [2011/12] | Type: | B1 Patent specification | No.: | EP2299609 | Date: | 08.05.2013 | Language: | EN | [2013/19] | Search report(s) | International search report - published on: | CN | 23.12.2009 | (Supplementary) European search report - dispatched on: | EP | 18.11.2011 | Classification | IPC: | H04B10/00, H04J3/16, H04L7/04, H04Q11/00 | [2011/51] | CPC: |
H04L7/041 (EP,US);
H04B10/2581 (KR);
H04B10/27 (KR);
H04L1/00 (KR);
H04Q11/0067 (EP,US);
H04Q2011/0064 (EP,US)
|
Former IPC [2011/12] | H04B10/00 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2011/12] | Title | German: | VERFAHREN UND GERÄTE ZUM SENDEN DER UPLINK-BURST-DATEN IN PASSIVEN OPTISCHEN NETZWERKSYSTEMEN | [2011/12] | English: | METHOD AND EQUIPMENT FOR TRANSMITTING THE UPLINK BURST DATA IN THE PASSIVE OPTICAL NETWORK SYSTEM | [2011/12] | French: | PROCÉDÉ ET ÉQUIPEMENT PERMETTANT DE TRANSMETTRE LES DONNÉES DE SALVE DE LA LIAISON MONTANTE DANS LE SYSTÈME DE RÉSEAU OPTIQUE PASSIF | [2011/12] | Entry into regional phase | 20.12.2010 | Translation filed | 20.12.2010 | National basic fee paid | 20.12.2010 | Search fee paid | 20.12.2010 | Designation fee(s) paid | 20.12.2010 | Examination fee paid | Examination procedure | 20.12.2010 | Examination requested [2011/12] | 21.05.2012 | Amendment by applicant (claims and/or description) | 29.11.2012 | Communication of intention to grant the patent | 25.03.2013 | Fee for grant paid | 25.03.2013 | Fee for publishing/printing paid | Divisional application(s) | EP12197953.8 / EP2573959 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 29.11.2012 | Opposition(s) | 11.02.2014 | No opposition filed within time limit [2014/16] | Fees paid | Renewal fee | 30.06.2011 | Renewal fee patent year 03 | 02.07.2012 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 16.06.2009 | AT | 08.05.2013 | BE | 08.05.2013 | CY | 08.05.2013 | CZ | 08.05.2013 | DK | 08.05.2013 | EE | 08.05.2013 | FI | 08.05.2013 | HR | 08.05.2013 | LT | 08.05.2013 | LV | 08.05.2013 | MC | 08.05.2013 | MK | 08.05.2013 | MT | 08.05.2013 | PL | 08.05.2013 | RO | 08.05.2013 | SI | 08.05.2013 | SK | 08.05.2013 | TR | 08.05.2013 | IE | 16.06.2013 | LU | 16.06.2013 | CH | 30.06.2013 | LI | 30.06.2013 | BG | 08.08.2013 | NO | 08.08.2013 | GR | 09.08.2013 | ES | 19.08.2013 | IS | 08.09.2013 | PT | 09.09.2013 | [2015/34] |
Former [2015/32] | AT | 08.05.2013 | |
BE | 08.05.2013 | ||
CY | 08.05.2013 | ||
CZ | 08.05.2013 | ||
DK | 08.05.2013 | ||
EE | 08.05.2013 | ||
FI | 08.05.2013 | ||
HR | 08.05.2013 | ||
LT | 08.05.2013 | ||
LV | 08.05.2013 | ||
MC | 08.05.2013 | ||
MK | 08.05.2013 | ||
MT | 08.05.2013 | ||
PL | 08.05.2013 | ||
RO | 08.05.2013 | ||
SI | 08.05.2013 | ||
SK | 08.05.2013 | ||
TR | 08.05.2013 | ||
IE | 16.06.2013 | ||
CH | 30.06.2013 | ||
LI | 30.06.2013 | ||
BG | 08.08.2013 | ||
NO | 08.08.2013 | ||
GR | 09.08.2013 | ||
ES | 19.08.2013 | ||
IS | 08.09.2013 | ||
PT | 09.09.2013 | ||
Former [2015/13] | AT | 08.05.2013 | |
BE | 08.05.2013 | ||
CY | 08.05.2013 | ||
CZ | 08.05.2013 | ||
DK | 08.05.2013 | ||
EE | 08.05.2013 | ||
FI | 08.05.2013 | ||
HR | 08.05.2013 | ||
LT | 08.05.2013 | ||
LV | 08.05.2013 | ||
MC | 08.05.2013 | ||
MT | 08.05.2013 | ||
PL | 08.05.2013 | ||
RO | 08.05.2013 | ||
SI | 08.05.2013 | ||
SK | 08.05.2013 | ||
IE | 16.06.2013 | ||
CH | 30.06.2013 | ||
LI | 30.06.2013 | ||
BG | 08.08.2013 | ||
NO | 08.08.2013 | ||
GR | 09.08.2013 | ||
ES | 19.08.2013 | ||
IS | 08.09.2013 | ||
PT | 09.09.2013 | ||
Former [2014/20] | AT | 08.05.2013 | |
BE | 08.05.2013 | ||
CY | 08.05.2013 | ||
CZ | 08.05.2013 | ||
DK | 08.05.2013 | ||
EE | 08.05.2013 | ||
FI | 08.05.2013 | ||
HR | 08.05.2013 | ||
LT | 08.05.2013 | ||
LV | 08.05.2013 | ||
MC | 08.05.2013 | ||
PL | 08.05.2013 | ||
RO | 08.05.2013 | ||
SI | 08.05.2013 | ||
SK | 08.05.2013 | ||
IE | 16.06.2013 | ||
CH | 30.06.2013 | ||
LI | 30.06.2013 | ||
BG | 08.08.2013 | ||
NO | 08.08.2013 | ||
GR | 09.08.2013 | ||
ES | 19.08.2013 | ||
IS | 08.09.2013 | ||
PT | 09.09.2013 | ||
Former [2014/14] | AT | 08.05.2013 | |
BE | 08.05.2013 | ||
CY | 08.05.2013 | ||
CZ | 08.05.2013 | ||
DK | 08.05.2013 | ||
EE | 08.05.2013 | ||
FI | 08.05.2013 | ||
HR | 08.05.2013 | ||
LT | 08.05.2013 | ||
LV | 08.05.2013 | ||
MC | 08.05.2013 | ||
PL | 08.05.2013 | ||
RO | 08.05.2013 | ||
SI | 08.05.2013 | ||
SK | 08.05.2013 | ||
BG | 08.08.2013 | ||
NO | 08.08.2013 | ||
GR | 09.08.2013 | ||
ES | 19.08.2013 | ||
IS | 08.09.2013 | ||
PT | 09.09.2013 | ||
Former [2014/11] | AT | 08.05.2013 | |
BE | 08.05.2013 | ||
CY | 08.05.2013 | ||
CZ | 08.05.2013 | ||
DK | 08.05.2013 | ||
EE | 08.05.2013 | ||
FI | 08.05.2013 | ||
HR | 08.05.2013 | ||
LT | 08.05.2013 | ||
LV | 08.05.2013 | ||
PL | 08.05.2013 | ||
RO | 08.05.2013 | ||
SI | 08.05.2013 | ||
SK | 08.05.2013 | ||
BG | 08.08.2013 | ||
NO | 08.08.2013 | ||
GR | 09.08.2013 | ||
ES | 19.08.2013 | ||
IS | 08.09.2013 | ||
PT | 09.09.2013 | ||
Former [2014/10] | AT | 08.05.2013 | |
BE | 08.05.2013 | ||
CY | 08.05.2013 | ||
CZ | 08.05.2013 | ||
DK | 08.05.2013 | ||
EE | 08.05.2013 | ||
FI | 08.05.2013 | ||
HR | 08.05.2013 | ||
LT | 08.05.2013 | ||
LV | 08.05.2013 | ||
PL | 08.05.2013 | ||
SI | 08.05.2013 | ||
SK | 08.05.2013 | ||
BG | 08.08.2013 | ||
NO | 08.08.2013 | ||
GR | 09.08.2013 | ||
ES | 19.08.2013 | ||
IS | 08.09.2013 | ||
PT | 09.09.2013 | ||
Former [2014/09] | AT | 08.05.2013 | |
BE | 08.05.2013 | ||
CY | 08.05.2013 | ||
DK | 08.05.2013 | ||
EE | 08.05.2013 | ||
FI | 08.05.2013 | ||
HR | 08.05.2013 | ||
LT | 08.05.2013 | ||
LV | 08.05.2013 | ||
PL | 08.05.2013 | ||
SI | 08.05.2013 | ||
BG | 08.08.2013 | ||
NO | 08.08.2013 | ||
GR | 09.08.2013 | ||
ES | 19.08.2013 | ||
IS | 08.09.2013 | ||
PT | 09.09.2013 | ||
Former [2014/06] | AT | 08.05.2013 | |
BE | 08.05.2013 | ||
CY | 08.05.2013 | ||
FI | 08.05.2013 | ||
HR | 08.05.2013 | ||
LT | 08.05.2013 | ||
LV | 08.05.2013 | ||
PL | 08.05.2013 | ||
SI | 08.05.2013 | ||
BG | 08.08.2013 | ||
NO | 08.08.2013 | ||
GR | 09.08.2013 | ||
ES | 19.08.2013 | ||
IS | 08.09.2013 | ||
PT | 09.09.2013 | ||
Former [2014/02] | AT | 08.05.2013 | |
CY | 08.05.2013 | ||
FI | 08.05.2013 | ||
HR | 08.05.2013 | ||
LT | 08.05.2013 | ||
LV | 08.05.2013 | ||
PL | 08.05.2013 | ||
SI | 08.05.2013 | ||
BG | 08.08.2013 | ||
NO | 08.08.2013 | ||
GR | 09.08.2013 | ||
ES | 19.08.2013 | ||
IS | 08.09.2013 | ||
PT | 09.09.2013 | ||
Former [2013/52] | AT | 08.05.2013 | |
CY | 08.05.2013 | ||
FI | 08.05.2013 | ||
HR | 08.05.2013 | ||
LT | 08.05.2013 | ||
PL | 08.05.2013 | ||
SI | 08.05.2013 | ||
BG | 08.08.2013 | ||
NO | 08.08.2013 | ||
GR | 09.08.2013 | ||
ES | 19.08.2013 | ||
IS | 08.09.2013 | ||
PT | 09.09.2013 | ||
Former [2013/51] | AT | 08.05.2013 | |
FI | 08.05.2013 | ||
HR | 08.05.2013 | ||
LT | 08.05.2013 | ||
PL | 08.05.2013 | ||
SI | 08.05.2013 | ||
BG | 08.08.2013 | ||
NO | 08.08.2013 | ||
GR | 09.08.2013 | ||
ES | 19.08.2013 | ||
IS | 08.09.2013 | ||
PT | 09.09.2013 | ||
Former [2013/50] | AT | 08.05.2013 | |
FI | 08.05.2013 | ||
LT | 08.05.2013 | ||
PL | 08.05.2013 | ||
SI | 08.05.2013 | ||
BG | 08.08.2013 | ||
NO | 08.08.2013 | ||
GR | 09.08.2013 | ||
ES | 19.08.2013 | ||
IS | 08.09.2013 | ||
PT | 09.09.2013 | ||
Former [2013/49] | AT | 08.05.2013 | |
FI | 08.05.2013 | ||
LT | 08.05.2013 | ||
SI | 08.05.2013 | ||
NO | 08.08.2013 | ||
GR | 09.08.2013 | ||
ES | 19.08.2013 | ||
IS | 08.09.2013 | ||
PT | 09.09.2013 | ||
Former [2013/48] | AT | 08.05.2013 | |
LT | 08.05.2013 | ||
NO | 08.08.2013 | ||
ES | 19.08.2013 | ||
IS | 08.09.2013 | ||
PT | 09.09.2013 | ||
Former [2013/47] | LT | 08.05.2013 | |
NO | 08.08.2013 | ||
PT | 09.09.2013 | Documents cited: | Search | [XI]WO2007113461 (BRITISH TELECOMM [GB], et al) [X] 10,13,16 * page 2, line 9 - line 17 * * page 11, line 13 - line 18 * * page 11, line 9 - line 20 * * figure 8b * [I] 11,12,14,15,17,18; | [YA]US2002120758 (CHANG TSUNG-SHIEN [TW]) [Y] 1-9 * abstract * * paragraph [0002] - paragraph [0003] * * paragraph [0008] * * paragraph [0025] - paragraph [0028] * * figures 4,5,12 * [A] 10-18; | [A]US2004208631 (SONG JAE-YEON [KR], et al) [A] 10-18 * paragraph [0014] * * paragraph [0038] - paragraph [0042] * * paragraph [0064] - paragraph [0066] * * figures 1,6 * | [Y] - EFFENBERGER F ET AL, "FEC Synchronization and Framing", (20070115), pages 1 - 26, 20070115, URL: http://www.ieee802.org/3/av/public/2007_01/3av_0701_effenberger_1.pdf, (20101011), XP002604382 [Y] 1-9 * page 3 * * page 17 - page 20 * * page 22 - page 24 * | [A] - OKI ELECTRIC INDUSTRY CO - TOSHIAKI MUKOJIMA, "Bacward Compatibility and Co-existence for 10Gb/s EPON", IEEE 802.3 10GB/S PHY FOR EPON STUDY GROUP, (20060616), pages 1 - 3, URL: http://www.ieee802.org/3/10GEPON_study/public/july06/mukojima_2_0706.pdf, (20111103), XP002662692 [A] 1-9 * page 1 * | International search | [X]CN1848731 (HUAWEI TECH CO LTD [CN]); | [Y] - HUAWEI, "10G EPON Upstream Synchronizer Performance", IEEE P802.3AV TASK FORCE, (20080501), pages 1 - 4, URL: www.ieee802.org/3/av/public/200805/3av0805effenberger2.pdf, XP008141075 | [Y] - JEFF MANDIN, "PMC-Sierra, Framework For Upstream Synchronization and Alignment", IEEE P802.3AV TASK FORCE, (200702), page 17, URL: http:/www.ieee802.org/3/10GEPONstudy/email/pdf00012.pdf, XP008141076 | [A] - HE HUI ET AL., "Forward error correction application in EPON", OPTICAL COMMUNICATION TECHNOLOGY, (200306), vol. 27, no. 105, pages 12 - 14, XP008141152 |