EP2291901 - ELECTRIC MACHINE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.04.2020 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 03.05.2019 | ||
Former | Grant of patent is intended Status updated on 01.01.2019 | ||
Former | Examination is in progress Status updated on 02.12.2016 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states SEG Automotive Germany GmbH Lotterbergstrasse 30 70499 Stuttgart / DE | [2017/52] |
Former [2011/10] | For all designated states Robert Bosch GmbH Postfach 30 02 20 70442 Stuttgart / DE | Inventor(s) | 01 /
AMARAL, Daniel Rua Santos Dumont 80 Ap 32 CEP-13024-020 Cambui Campinas-SP / BR | [2019/23] |
Former [2011/10] | 01 /
AMARAL, Daniel Rua Santos Dumont 80 Ap 32 CEP-13024-020 Cambui Campinas-SP / BR | Representative(s) | Steinbauer, Florian, et al Dehns Germany Theresienstraße 6-8 80333 München / DE | [2019/23] | Application number, filing date | 09769311.3 | 25.06.2009 | [2011/10] | WO2009EP57951 | Priority number, date | DE20081002638 | 25.06.2008 Original published format: DE102008002638 | [2011/10] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2009156463 | Date: | 30.12.2009 | Language: | DE | [2009/53] | Type: | A1 Application with search report | No.: | EP2291901 | Date: | 09.03.2011 | Language: | DE | The application published by WIPO in one of the EPO official languages on 30.12.2009 takes the place of the publication of the European patent application. | [2011/10] | Type: | B1 Patent specification | No.: | EP2291901 | Date: | 05.06.2019 | Language: | DE | [2019/23] | Search report(s) | International search report - published on: | EP | 30.12.2009 | Classification | IPC: | H02K5/20, H02K9/06, H02K11/04 | [2011/10] | CPC: |
H02K9/06 (EP,US);
H02K11/05 (EP,US);
H02K5/207 (EP,US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2019/23] |
Former [2011/10] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | ELEKTRISCHE MASCHINE | [2011/10] | English: | ELECTRIC MACHINE | [2011/10] | French: | MACHINE ÉLECTRIQUE | [2011/10] | Entry into regional phase | 25.01.2011 | National basic fee paid | 25.01.2011 | Designation fee(s) paid | 25.01.2011 | Examination fee paid | Examination procedure | 25.01.2011 | Examination requested [2011/10] | 14.03.2011 | Amendment by applicant (claims and/or description) | 01.12.2016 | Despatch of a communication from the examining division (Time limit: M06) | 12.06.2017 | Reply to a communication from the examining division | 30.06.2017 | Despatch of a communication from the examining division (Time limit: M06) | 10.01.2018 | Reply to a communication from the examining division | 14.11.2018 | Date of oral proceedings | 19.12.2018 | Minutes of oral proceedings despatched | 02.01.2019 | Communication of intention to grant the patent | 23.04.2019 | Fee for grant paid | 23.04.2019 | Fee for publishing/printing paid | 23.04.2019 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 01.12.2016 | Opposition(s) | 06.03.2020 | No opposition filed within time limit [2020/20] | Fees paid | Renewal fee | 30.06.2011 | Renewal fee patent year 03 | 02.07.2012 | Renewal fee patent year 04 | 01.07.2013 | Renewal fee patent year 05 | 30.06.2014 | Renewal fee patent year 06 | 30.06.2015 | Renewal fee patent year 07 | 30.06.2016 | Renewal fee patent year 08 | 30.06.2017 | Renewal fee patent year 09 | 18.06.2018 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | CY | 05.06.2019 | CZ | 05.06.2019 | DK | 05.06.2019 | EE | 05.06.2019 | FI | 05.06.2019 | HR | 05.06.2019 | LT | 05.06.2019 | LV | 05.06.2019 | MC | 05.06.2019 | MK | 05.06.2019 | MT | 05.06.2019 | NL | 05.06.2019 | PL | 05.06.2019 | RO | 05.06.2019 | SE | 05.06.2019 | SI | 05.06.2019 | SK | 05.06.2019 | TR | 05.06.2019 | AT | 25.06.2019 | IE | 25.06.2019 | LU | 25.06.2019 | BE | 30.06.2019 | CH | 30.06.2019 | LI | 30.06.2019 | BG | 05.09.2019 | GB | 05.09.2019 | NO | 05.09.2019 | GR | 06.09.2019 | IS | 05.10.2019 | PT | 07.10.2019 | [2022/31] |
Former [2021/34] | CY | 05.06.2019 | |
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
MT | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
TR | 05.06.2019 | ||
AT | 25.06.2019 | ||
IE | 25.06.2019 | ||
LU | 25.06.2019 | ||
BE | 30.06.2019 | ||
CH | 30.06.2019 | ||
LI | 30.06.2019 | ||
BG | 05.09.2019 | ||
GB | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2021/26] | CY | 05.06.2019 | |
CZ | 05.06.2019 | ||
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
TR | 05.06.2019 | ||
AT | 25.06.2019 | ||
IE | 25.06.2019 | ||
LU | 25.06.2019 | ||
BE | 30.06.2019 | ||
CH | 30.06.2019 | ||
LI | 30.06.2019 | ||
BG | 05.09.2019 | ||
GB | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/51] | CZ | 05.06.2019 | |
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
TR | 05.06.2019 | ||
AT | 25.06.2019 | ||
IE | 25.06.2019 | ||
LU | 25.06.2019 | ||
BE | 30.06.2019 | ||
CH | 30.06.2019 | ||
LI | 30.06.2019 | ||
BG | 05.09.2019 | ||
GB | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/48] | CZ | 05.06.2019 | |
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
TR | 05.06.2019 | ||
IE | 25.06.2019 | ||
LU | 25.06.2019 | ||
BE | 30.06.2019 | ||
CH | 30.06.2019 | ||
LI | 30.06.2019 | ||
BG | 05.09.2019 | ||
GB | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/25] | CZ | 05.06.2019 | |
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
NL | 05.06.2019 | ||
PL | 05.06.2019 | ||
RO | 05.06.2019 | ||
SE | 05.06.2019 | ||
SI | 05.06.2019 | ||
SK | 05.06.2019 | ||
TR | 05.06.2019 | ||
IE | 25.06.2019 | ||
LU | 25.06.2019 | ||
BE | 30.06.2019 | ||
CH | 30.06.2019 | ||
LI | 30.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/22] | CZ | 05.06.2019 | |
DK | 05.06.2019 | ||
EE | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
SE | 05.06.2019 | ||
SK | 05.06.2019 | ||
TR | 05.06.2019 | ||
IE | 25.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/21] | CZ | 05.06.2019 | |
EE | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
SE | 05.06.2019 | ||
SK | 05.06.2019 | ||
TR | 05.06.2019 | ||
IE | 25.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/17] | CZ | 05.06.2019 | |
EE | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
MC | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
SE | 05.06.2019 | ||
SK | 05.06.2019 | ||
TR | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/12] | CZ | 05.06.2019 | |
EE | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
SE | 05.06.2019 | ||
SK | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
IS | 05.10.2019 | ||
PT | 07.10.2019 | ||
Former [2020/11] | CZ | 05.06.2019 | |
EE | 05.06.2019 | ||
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
SE | 05.06.2019 | ||
SK | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
PT | 07.10.2019 | ||
Former [2020/10] | CZ | 05.06.2019 | |
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
RO | 05.06.2019 | ||
SE | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
PT | 07.10.2019 | ||
Former [2020/09] | CZ | 05.06.2019 | |
FI | 05.06.2019 | ||
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
SE | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
Former [2020/07] | FI | 05.06.2019 | |
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
NL | 05.06.2019 | ||
SE | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
Former [2019/51] | FI | 05.06.2019 | |
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
SE | 05.06.2019 | ||
BG | 05.09.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
Former [2019/50] | FI | 05.06.2019 | |
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
LV | 05.06.2019 | ||
SE | 05.06.2019 | ||
NO | 05.09.2019 | ||
GR | 06.09.2019 | ||
Former [2019/49] | FI | 05.06.2019 | |
HR | 05.06.2019 | ||
LT | 05.06.2019 | ||
SE | 05.06.2019 | ||
NO | 05.09.2019 | ||
Former [2019/48] | FI | 05.06.2019 | |
LT | 05.06.2019 | ||
SE | 05.06.2019 | ||
NO | 05.09.2019 | ||
Former [2019/47] | FI | 05.06.2019 | |
LT | 05.06.2019 | ||
NO | 05.09.2019 | Cited in | International search | [XY]EP0125834 (LUCAS IND PLC [GB]) [X] 1-6 * page 9, line 14 - page 10, line 21 * [Y] 7-14; | [A]DE19705228 (BOSCH GMBH ROBERT [DE]) [A] 1-14 * column 3, line 24 - column 5, line 14 *; | [A]DE10111295 (BOSCH GMBH ROBERT [DE]) [A] 1-14* abstract *; | [Y]WO02093717 (VALEO EQUIP ELECTR MOTEUR [FR], et al) [Y] 7-14 * page 15, line 25 - page 19, line 18 * |