EP2306879 - METHOD FOR OPERATING A WATER-CONDUCTING DOMESTIC APPLIANCE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.04.2021 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 24.04.2020 | ||
Former | Grant of patent is intended Status updated on 07.01.2020 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states BSH Hausgeräte GmbH Carl-Wery-Strasse 34 81739 München / DE | [2015/13] |
Former [2011/15] | For all designated states BSH Bosch und Siemens Hausgeräte GmbH Carl-Wery-Strasse 34 81739 München / DE | Inventor(s) | 01 /
HEISELE, Bernd Georgstr.19 89567 Sontheim / DE | 02 /
RIEGER, Roland Westerfeldstr. 22 73492 Rainau / DE | 03 /
ROSENBAUER, Michael Riedweg 19 86756 Reimlingen / DE | [2011/15] | Application number, filing date | 09769346.9 | 26.06.2009 | [2011/15] | WO2009EP58023 | Priority number, date | DE20081030538 | 27.06.2008 Original published format: DE102008030538 | [2011/15] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2009156498 | Date: | 30.12.2009 | Language: | DE | [2009/53] | Type: | A1 Application with search report | No.: | EP2306879 | Date: | 13.04.2011 | Language: | DE | The application published by WIPO in one of the EPO official languages on 30.12.2009 takes the place of the publication of the European patent application. | [2011/15] | Type: | B1 Patent specification | No.: | EP2306879 | Date: | 27.05.2020 | Language: | DE | [2020/22] | Search report(s) | International search report - published on: | EP | 30.12.2009 | Classification | IPC: | A47L15/00, A47L15/42 | [2011/15] | CPC: |
A47L15/4291 (EP);
A47L15/0002 (EP);
A47L15/0047 (EP);
A47L2401/12 (EP);
A47L2501/02 (EP);
A47L2601/02 (EP);
Y02B40/00 (EP)
(-)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2020/22] |
Former [2011/15] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR | Title | German: | VERFAHREN ZUM BETREIBEN EINES WASSERFÜHRENDEN HAUSHALTSGERÄTS | [2011/15] | English: | METHOD FOR OPERATING A WATER-CONDUCTING DOMESTIC APPLIANCE | [2011/15] | French: | PROCÉDÉ PERMETTANT DE FAIRE FONCTIONNER UN APPAREIL MÉNAGER À CIRCULATION D'EAU | [2011/15] | Entry into regional phase | 27.01.2011 | National basic fee paid | 27.01.2011 | Designation fee(s) paid | 27.01.2011 | Examination fee paid | Examination procedure | 27.01.2011 | Examination requested [2011/15] | 09.03.2011 | Amendment by applicant (claims and/or description) | 23.10.2015 | Despatch of a communication from the examining division (Time limit: M04) | 15.02.2016 | Reply to a communication from the examining division | 08.01.2020 | Communication of intention to grant the patent | 15.04.2020 | Fee for grant paid | 15.04.2020 | Fee for publishing/printing paid | 15.04.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 23.10.2015 | Opposition(s) | 02.03.2021 | No opposition filed within time limit [2021/18] | Fees paid | Renewal fee | 30.06.2011 | Renewal fee patent year 03 | 02.07.2012 | Renewal fee patent year 04 | 01.07.2013 | Renewal fee patent year 05 | 30.06.2014 | Renewal fee patent year 06 | 30.06.2015 | Renewal fee patent year 07 | 30.06.2016 | Renewal fee patent year 08 | 30.06.2017 | Renewal fee patent year 09 | 02.07.2018 | Renewal fee patent year 10 | 01.07.2019 | Renewal fee patent year 11 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 26.06.2009 | CY | 27.05.2020 | DK | 27.05.2020 | EE | 27.05.2020 | ES | 27.05.2020 | FI | 27.05.2020 | HR | 27.05.2020 | IT | 27.05.2020 | LT | 27.05.2020 | LV | 27.05.2020 | MC | 27.05.2020 | MK | 27.05.2020 | MT | 27.05.2020 | NL | 27.05.2020 | RO | 27.05.2020 | SE | 27.05.2020 | SI | 27.05.2020 | SK | 27.05.2020 | AT | 26.06.2020 | IE | 26.06.2020 | LU | 26.06.2020 | BE | 30.06.2020 | CH | 30.06.2020 | LI | 30.06.2020 | FR | 27.07.2020 | BG | 27.08.2020 | GB | 27.08.2020 | NO | 27.08.2020 | GR | 28.08.2020 | IS | 27.09.2020 | PT | 28.09.2020 | [2022/32] |
Former [2022/27] | HU | 26.06.2009 | |
CY | 27.05.2020 | ||
DK | 27.05.2020 | ||
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
MT | 27.05.2020 | ||
NL | 27.05.2020 | ||
RO | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
AT | 26.06.2020 | ||
IE | 26.06.2020 | ||
LU | 26.06.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
FR | 27.07.2020 | ||
BG | 27.08.2020 | ||
GB | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/46] | DK | 27.05.2020 | |
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
NL | 27.05.2020 | ||
RO | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
AT | 26.06.2020 | ||
IE | 26.06.2020 | ||
LU | 26.06.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
FR | 27.07.2020 | ||
BG | 27.08.2020 | ||
GB | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/38] | DK | 27.05.2020 | |
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
NL | 27.05.2020 | ||
RO | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
IE | 26.06.2020 | ||
LU | 26.06.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
FR | 27.07.2020 | ||
BG | 27.08.2020 | ||
GB | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/23] | DK | 27.05.2020 | |
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
NL | 27.05.2020 | ||
RO | 27.05.2020 | ||
SE | 27.05.2020 | ||
SI | 27.05.2020 | ||
SK | 27.05.2020 | ||
IE | 26.06.2020 | ||
LU | 26.06.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
FR | 27.07.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/20] | DK | 27.05.2020 | |
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
NL | 27.05.2020 | ||
RO | 27.05.2020 | ||
SE | 27.05.2020 | ||
SK | 27.05.2020 | ||
IE | 26.06.2020 | ||
LU | 26.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/15] | DK | 27.05.2020 | |
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
NL | 27.05.2020 | ||
RO | 27.05.2020 | ||
SE | 27.05.2020 | ||
SK | 27.05.2020 | ||
LU | 26.06.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/13] | DK | 27.05.2020 | |
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
MC | 27.05.2020 | ||
NL | 27.05.2020 | ||
RO | 27.05.2020 | ||
SE | 27.05.2020 | ||
SK | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/10] | DK | 27.05.2020 | |
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
NL | 27.05.2020 | ||
RO | 27.05.2020 | ||
SE | 27.05.2020 | ||
SK | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/09] | DK | 27.05.2020 | |
EE | 27.05.2020 | ||
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
IT | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
NL | 27.05.2020 | ||
RO | 27.05.2020 | ||
SE | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/08] | DK | 27.05.2020 | |
ES | 27.05.2020 | ||
FI | 27.05.2020 | ||
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
NL | 27.05.2020 | ||
RO | 27.05.2020 | ||
SE | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/04] | FI | 27.05.2020 | |
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
NL | 27.05.2020 | ||
SE | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2021/01] | FI | 27.05.2020 | |
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
SE | 27.05.2020 | ||
BG | 27.08.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2020/50] | FI | 27.05.2020 | |
HR | 27.05.2020 | ||
LT | 27.05.2020 | ||
LV | 27.05.2020 | ||
SE | 27.05.2020 | ||
NO | 27.08.2020 | ||
GR | 28.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2020/48] | FI | 27.05.2020 | |
LT | 27.05.2020 | ||
SE | 27.05.2020 | ||
NO | 27.08.2020 | ||
IS | 27.09.2020 | ||
PT | 28.09.2020 | ||
Former [2020/47] | LT | 27.05.2020 | |
NO | 27.08.2020 | ||
IS | 27.09.2020 | ||
Former [2020/46] | IS | 27.09.2020 | Cited in | International search | [AD]DE2730489 (BOSCH SIEMENS HAUSGERAETE) [AD] 1-10 * the whole document *; | [A]DE3609277 (ASCHER ERHARD [DE], et al) [A] 1-10 * the whole document *; | [X]DE3900617 (LICENTIA GMBH [DE]) [X] 1-3,6-8,10 * column 2, line 35 - column 4, line 17; figure 2 *; | [A]GB2271417 (BOSCH SIEMENS HAUSGERAETE [DE]) [A] 1-10 * the whole document *; | [XY]EP0800785 (ELECTROLUX ZANUSSI ELETTRODOME [IT]) [X] 1-3,6-10 * column 1, line 50 - column 5, line 45; figure . * [Y] 4,5; | [Y]WO2004054426 (BSH BOSCH SIEMENS HAUSGERAETE [DE], et al) [Y] 4,5 * page 2, line 24 - line 28 *; | [Y]WO2006053634 (MEIKO MASCHINENBAU GMBH & CO [DE], et al) [Y] 4,5* abstract * | by applicant | DE2730489 | DE3900617 | EP0800785 |