blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2364234

EP2364234 - DEVICE AND METHOD FOR MEASURING A DIRECT CURRENT AND RESISTANCE WELDING DEVICE [Right-click to bookmark this link]
Former [2011/37]METHOD AND DEVICE FOR DETERMINING A DIRECT CURRENT AND RESISTANCE WELDING DEVICE
[2017/17]
StatusNo opposition filed within time limit
Status updated on  13.07.2018
Database last updated on 15.06.2024
FormerThe patent has been granted
Status updated on  04.08.2017
FormerGrant of patent is intended
Status updated on  24.04.2017
Most recent event   Tooltip29.05.2020Lapse of the patent in a contracting state
New state(s): PT
published on 01.07.2020  [2020/27]
Applicant(s)For all designated states
Fronius International GmbH
Froniusstraße 1
4643 Pettenbach / AT
[N/P]
Former [2017/36]For all designated states
Fronius International GmbH
Froniusstrasse 1
4643 Pettenbach / AT
Former [2011/37]For all designated states
Fronius International Gmbh
Vorchdorfer Strasse 40
4643 Pettenbach / AT
Inventor(s)01 / BADEGRUBER, Thomas
Saagerstrasse 39
4650 Lambach / AT
02 / ENNSBRUNNER, Helmut
Josef-Holzmann-Weg 7
4060 Leonding / AT
 [2011/37]
Representative(s)SONN Patentanwälte GmbH & Co KG
Riemergasse 14
1010 Wien / AT
[N/P]
Former [2011/37]Sonn & Partner Patentanwälte
Riemergasse 14
1010 Wien / AT
Application number, filing date09771660.901.12.2009
[2017/36]
WO2009AT00465
Priority number, dateAT2008000191509.12.2008         Original published format: AT 19152008
[2011/37]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report
No.:WO2010065975
Date:17.06.2010
Language:DE
[2010/24]
Type: A1 Application with search report 
No.:EP2364234
Date:14.09.2011
Language:DE
The application published by WIPO in one of the EPO official languages on 17.06.2010 takes the place of the publication of the European patent application.
[2011/37]
Type: B1 Patent specification 
No.:EP2364234
Date:06.09.2017
Language:DE
[2017/36]
Search report(s)International search report - published on:EP17.06.2010
ClassificationIPC:B23K11/25, H01F38/08
[2011/37]
CPC:
B23K11/257 (EP,US); G01R15/181 (EP,US); H01F27/40 (EP,US);
H01F38/085 (EP,US)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   SM,   TR [2017/36]
Extension statesALNot yet paid
BANot yet paid
RSNot yet paid
TitleGerman:VERFAHREN UND VORRICHTUNG ZUM ERMITTELN EINES GLEICHSTROMS UND WIDERSTANDSSCHWEIßVORRICHTUNG[2011/37]
English:DEVICE AND METHOD FOR MEASURING A DIRECT CURRENT AND RESISTANCE WELDING DEVICE[2017/17]
French:PROCÉDÉ ET DISPOSITIF DE MESURE DE COURANT CONTINU AINSI QUE DISPOSITIF DE SOUDAGE PAR RÉSISTANCE[2017/17]
Former [2011/37]METHOD AND DEVICE FOR DETERMINING A DIRECT CURRENT AND RESISTANCE WELDING DEVICE
Former [2011/37]PROCÉDÉ ET DISPOSITIF POUR DÉTERMINER UN COURANT CONTINU ET DISPOSITIF DE SOUDAGE PAR RÉSISTANCE
Entry into regional phase13.04.2011National basic fee paid 
13.04.2011Designation fee(s) paid 
13.04.2011Examination fee paid 
Examination procedure13.04.2011Amendment by applicant (claims and/or description)
13.04.2011Examination requested  [2011/37]
25.04.2017Communication of intention to grant the patent
27.07.2017Fee for grant paid
27.07.2017Fee for publishing/printing paid
27.07.2017Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  25.04.2017
Opposition(s)07.06.2018No opposition filed within time limit [2018/33]
Fees paidRenewal fee
02.12.2011Renewal fee patent year 03
05.12.2012Renewal fee patent year 04
12.12.2013Renewal fee patent year 05
11.12.2014Renewal fee patent year 06
10.12.2015Renewal fee patent year 07
30.12.2016Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU01.12.2009
CY06.09.2017
CZ06.09.2017
DK06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
IT06.09.2017
LT06.09.2017
LV06.09.2017
MC06.09.2017
MK06.09.2017
MT06.09.2017
NL06.09.2017
PL06.09.2017
PT06.09.2017
RO06.09.2017
SE06.09.2017
SI06.09.2017
SK06.09.2017
SM06.09.2017
TR06.09.2017
AT01.12.2017
IE01.12.2017
LU01.12.2017
BG06.12.2017
GB06.12.2017
NO06.12.2017
GR07.12.2017
BE31.12.2017
CH31.12.2017
LI31.12.2017
FR02.01.2018
IS06.01.2018
[2020/27]
Former [2020/16]HU01.12.2009
CY06.09.2017
CZ06.09.2017
DK06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
IT06.09.2017
LT06.09.2017
LV06.09.2017
MC06.09.2017
MK06.09.2017
MT06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
SE06.09.2017
SI06.09.2017
SK06.09.2017
SM06.09.2017
TR06.09.2017
AT01.12.2017
IE01.12.2017
LU01.12.2017
BG06.12.2017
GB06.12.2017
NO06.12.2017
GR07.12.2017
BE31.12.2017
CH31.12.2017
LI31.12.2017
FR02.01.2018
IS06.01.2018
Former [2019/51]HU01.12.2009
CY06.09.2017
CZ06.09.2017
DK06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
IT06.09.2017
LT06.09.2017
LV06.09.2017
MC06.09.2017
MK06.09.2017
MT06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
SE06.09.2017
SI06.09.2017
SK06.09.2017
SM06.09.2017
AT01.12.2017
IE01.12.2017
LU01.12.2017
BG06.12.2017
GB06.12.2017
NO06.12.2017
GR07.12.2017
BE31.12.2017
CH31.12.2017
LI31.12.2017
FR02.01.2018
IS06.01.2018
Former [2019/46]HU01.12.2009
CY06.09.2017
CZ06.09.2017
DK06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
IT06.09.2017
LT06.09.2017
LV06.09.2017
MC06.09.2017
MT06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
SE06.09.2017
SI06.09.2017
SK06.09.2017
SM06.09.2017
AT01.12.2017
IE01.12.2017
LU01.12.2017
BG06.12.2017
GB06.12.2017
NO06.12.2017
GR07.12.2017
BE31.12.2017
CH31.12.2017
LI31.12.2017
FR02.01.2018
IS06.01.2018
Former [2019/31]HU01.12.2009
CZ06.09.2017
DK06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
IT06.09.2017
LT06.09.2017
LV06.09.2017
MC06.09.2017
MT06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
SE06.09.2017
SI06.09.2017
SK06.09.2017
SM06.09.2017
AT01.12.2017
IE01.12.2017
LU01.12.2017
BG06.12.2017
GB06.12.2017
NO06.12.2017
GR07.12.2017
BE31.12.2017
CH31.12.2017
LI31.12.2017
FR02.01.2018
IS06.01.2018
Former [2019/30]CZ06.09.2017
DK06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
IT06.09.2017
LT06.09.2017
LV06.09.2017
MC06.09.2017
MT06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
SE06.09.2017
SI06.09.2017
SK06.09.2017
SM06.09.2017
AT01.12.2017
IE01.12.2017
LU01.12.2017
BG06.12.2017
GB06.12.2017
NO06.12.2017
GR07.12.2017
BE31.12.2017
CH31.12.2017
LI31.12.2017
FR02.01.2018
IS06.01.2018
Former [2019/23]CZ06.09.2017
DK06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
IT06.09.2017
LT06.09.2017
LV06.09.2017
MT06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
SE06.09.2017
SI06.09.2017
SK06.09.2017
SM06.09.2017
AT01.12.2017
IE01.12.2017
LU01.12.2017
BG06.12.2017
GB06.12.2017
NO06.12.2017
GR07.12.2017
BE31.12.2017
CH31.12.2017
LI31.12.2017
FR02.01.2018
IS06.01.2018
Former [2018/52]CZ06.09.2017
DK06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
IT06.09.2017
LT06.09.2017
LV06.09.2017
MT06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
SE06.09.2017
SI06.09.2017
SK06.09.2017
SM06.09.2017
IE01.12.2017
LU01.12.2017
BG06.12.2017
GB06.12.2017
NO06.12.2017
GR07.12.2017
BE31.12.2017
CH31.12.2017
LI31.12.2017
FR02.01.2018
IS06.01.2018
Former [2018/50]CZ06.09.2017
DK06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
IT06.09.2017
LT06.09.2017
LV06.09.2017
MT06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
SE06.09.2017
SI06.09.2017
SK06.09.2017
SM06.09.2017
IE01.12.2017
LU01.12.2017
BG06.12.2017
GB06.12.2017
NO06.12.2017
GR07.12.2017
BE31.12.2017
FR02.01.2018
IS06.01.2018
Former [2018/49]CZ06.09.2017
DK06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
IT06.09.2017
LT06.09.2017
LV06.09.2017
MT06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
SE06.09.2017
SI06.09.2017
SK06.09.2017
SM06.09.2017
IE01.12.2017
LU01.12.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
BE31.12.2017
FR02.01.2018
IS06.01.2018
Former [2018/45]CZ06.09.2017
DK06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
IT06.09.2017
LT06.09.2017
LV06.09.2017
MT06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
SE06.09.2017
SI06.09.2017
SK06.09.2017
SM06.09.2017
IE01.12.2017
LU01.12.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
IS06.01.2018
Former [2018/43]CZ06.09.2017
DK06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
IT06.09.2017
LT06.09.2017
LV06.09.2017
MT06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
SE06.09.2017
SI06.09.2017
SK06.09.2017
SM06.09.2017
LU01.12.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
IS06.01.2018
Former [2018/39]CZ06.09.2017
DK06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
IT06.09.2017
LT06.09.2017
LV06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
SE06.09.2017
SI06.09.2017
SK06.09.2017
SM06.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
IS06.01.2018
Former [2018/35]CZ06.09.2017
DK06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
IT06.09.2017
LT06.09.2017
LV06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
SE06.09.2017
SK06.09.2017
SM06.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
IS06.01.2018
Former [2018/24]CZ06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
IT06.09.2017
LT06.09.2017
LV06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
SE06.09.2017
SK06.09.2017
SM06.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
IS06.01.2018
Former [2018/23]CZ06.09.2017
EE06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
LT06.09.2017
LV06.09.2017
NL06.09.2017
PL06.09.2017
RO06.09.2017
SE06.09.2017
SK06.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
IS06.01.2018
Former [2018/21]CZ06.09.2017
ES06.09.2017
FI06.09.2017
HR06.09.2017
LT06.09.2017
LV06.09.2017
NL06.09.2017
SE06.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
Former [2018/15]ES06.09.2017
FI06.09.2017
HR06.09.2017
LT06.09.2017
LV06.09.2017
NL06.09.2017
SE06.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
Former [2018/12]ES06.09.2017
FI06.09.2017
HR06.09.2017
LT06.09.2017
LV06.09.2017
SE06.09.2017
BG06.12.2017
NO06.12.2017
GR07.12.2017
Former [2018/10]FI06.09.2017
HR06.09.2017
LT06.09.2017
SE06.09.2017
NO06.12.2017
Former [2018/09]FI06.09.2017
LT06.09.2017
SE06.09.2017
NO06.12.2017
Former [2018/08]FI06.09.2017
LT06.09.2017
NO06.12.2017
Former [2018/07]LT06.09.2017
NO06.12.2017
Cited inInternational search[A]GB2321539  (HONDA MOTOR CO LTD [JP]) [A] 1-19 * pages 1,2,9; figure 1 *;
 [A]EP1249298  (BADISCHE DRAHTWERKE GMBH [DE]) [A] 1-19 * paragraph [0105]; figure 11 *;
 [AD]DE2656817  (SIEMENS AG) [AD] 1-19 * the whole document *;
 [A]US5196668  (KOBAYASHI NOBUO [US], et al) [A] 1-19 * figure 3 *
by applicantDE2656817
 JPS61271466
 GB2321539
 EP1249298
 US5196668
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.