EP2476219 - CELL SELECTION FOR MIMO TRANSMISSION [Right-click to bookmark this link] | Status | The application is deemed to be withdrawn Status updated on 04.11.2015 Database last updated on 30.10.2024 | Most recent event Tooltip | 04.11.2015 | Application deemed to be withdrawn | published on 02.12.2015 [2015/49] | Applicant(s) | For all designated states Fujitsu Limited 1-1, Kamikodanaka 4-chome Nakahara-ku Kawasaki-shi, Kanagawa 211-8588 / JP | [N/P] |
Former [2012/29] | For all designated states Fujitsu Limited 1-1, Kamikodanaka 4-chome Nakahara-ku Kawasaki-shi, Kanagawa 211-8588 / JP | Inventor(s) | 01 /
XIAO, Hui 7 Paget Road Uxbridge Middlesex UB10 0SW / GB | 02 /
SARPERI, Luciano Elfenauweg 17 Bern 3006 / CH | [2012/43] |
Former [2012/29] | 01 /
XIAO, Hui 7 Paget Road Uxbridge Middlesex UB10 0SW / GB | ||
02 /
SARPERI, Luciano 19 Helmsdale Close Hayes Middlesex UB4 9QS / GB | Representative(s) | Fenlon, Christine Lesley, et al Haseltine Lake LLP Lincoln House, 5th Floor 300 High Holborn London WC1V 7JH / GB | [N/P] |
Former [2012/29] | Fenlon, Christine Lesley, et al Haseltine Lake LLP Lincoln House, 5th Floor 300 High Holborn GB-London WC1V 7JH / GB | Application number, filing date | 09778453.2 | 10.09.2009 | WO2009EP06572 | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2011029458 | Date: | 17.03.2011 | Language: | EN | [2011/11] | Type: | A1 Application with search report | No.: | EP2476219 | Date: | 18.07.2012 | Language: | EN | The application published by WIPO in one of the EPO official languages on 17.03.2011 takes the place of the publication of the European patent application. | [2012/29] | Search report(s) | International search report - published on: | EP | 17.03.2011 | Classification | IPC: | H04L5/00, H04L25/03 | [2012/29] | CPC: |
H04L5/0037 (EP,KR,US);
H04B7/024 (KR);
H04B7/0413 (KR);
H04L25/03343 (EP,KR,US);
H04L5/0023 (EP,KR,US);
H04L5/006 (EP,KR,US);
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2012/29] | Title | German: | ZELLENAUSWAHL FÜR MIMO-ÜBERTRAGUNG | [2012/29] | English: | CELL SELECTION FOR MIMO TRANSMISSION | [2012/29] | French: | SELECTION DE CELLULES POUR UNE TRANSMISSION A PLUSIEURS ENTREES ET SORTIES | [2015/03] |
Former [2012/29] | SÉLECTION DE CELLULES POUR TRANSMISSION MIMO | Entry into regional phase | 28.03.2012 | National basic fee paid | 28.03.2012 | Designation fee(s) paid | 28.03.2012 | Examination fee paid | Examination procedure | 28.03.2012 | Examination requested [2012/29] | 16.10.2012 | Amendment by applicant (claims and/or description) | 04.09.2014 | Despatch of a communication from the examining division (Time limit: M04) | 21.10.2014 | Reply to a communication from the examining division | 05.01.2015 | Communication of intention to grant the patent | 16.05.2015 | Application deemed to be withdrawn, date of legal effect [2015/49] | 25.06.2015 | Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time [2015/49] | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 04.09.2014 | Fees paid | Renewal fee | 28.03.2012 | Renewal fee patent year 03 | 04.07.2012 | Renewal fee patent year 04 | 05.07.2013 | Renewal fee patent year 05 | 03.07.2014 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Cited in | International search | [A] - NEC GROUP, "Potential gain of DL CoMP with joint transmission", 3GPP DRAFT; R1-091688, SOPHIA-ANTIPOLIS CEDEX, FR, (20090428), XP050339227 [A] 1-28 * the whole document * | [A] - NTT DOCOMO, "Investigation on Advanced CoMP Scheme with MU-MIMO Techniques for LTE-Advanced Downlink", 3GPP DRAFT; R1-093504, SOPHIA-ANTIPOLIS CEDEX, FR, (20090824), no. Shenzhen, China; 20090824, XP050388138 [A] 1-28 * the whole document * | [A] - TOKYO INSTITUTE OF TECHNOLOGY, KDDI, "Distributed Dynamic CoMP for LTE-Advanced", 3GPP DRAFT; R1-093608, SOPHIA-ANTIPOLIS CEDEX, FR, (20090824), XP050388177 [A] 1-28 * the whole document * | [AP] - TOKYO INSTITUTE OF TECHNOLOGY, KDDI, "Distributed Dynamic CoMP for LTE-Advanced (Revision from R1-093608)", 3GPP DRAFT; R1-094285, Sophia-Antipolis Cedex, FR, (20091012), XP050388747 [AP] 1-28 * the whole document * | [A] - IBRAHIM ET AL., "Cooperative communications with partial channel state information: when to cooperate?", IEEE GLOBAL TELECOMMUNICATIONS CONFERENCE, Piscataway, US, (20051128), vol. 5, pages 3068 - 3072, XP010879363 [A] 2,3,10,11,13,14 * page 3068, column r, paragraph 2 * DOI: http://dx.doi.org/10.1109/GLOCOM.2005.1578321 | [A] - HITACHI, "2 Adaptive eNB Clustering for CoMP", 3GPP DRAFT; R1-093586, SOPHIA-ANTIPOLIS CEDEX, FR, (20090824), XP050388159 [A] 1-28 * the whole document * |