EP2361373 - PROCESS AND INSTRUMENT FOR RECONSTRUCTION OF AN IRREGULARLY SAMPLED NARROW-BAND SIGNAL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.12.2021 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 25.12.2020 | ||
Former | Grant of patent is intended Status updated on 22.10.2020 | ||
Former | Examination is in progress Status updated on 15.12.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Centre National d'Etudes Spatiales 2 Place Maurice Quentin 75001 Paris / FR | [2011/35] | Inventor(s) | 01 /
CANSOT, Elodie 38 rue Gaston Phoebus F-31300 Toulouse / FR | 02 /
CHRISTOPHE, Emmanuel 20 Fulton Road 578933 SINGAPOUR / SG | 03 /
ROSAK, Alain 16 rue André Cavagnol F-31500 Toulouse / FR | [2011/43] |
Former [2011/35] | 01 /
CANSOT, Elodie 38 rue Gaston Phoebus F-31300 Toulouse / FR | ||
02 /
CHRISTOPHE, Emmanuel 18 avenue Edouard Belin F-31401 Toulouse / FR | |||
03 /
ROSAK, Alain 16 rue André Cavagnol F-31500 Toulouse / FR | Representative(s) | Germain Maureau 12, rue Boileau 69006 Lyon / FR | [N/P] |
Former [2021/04] | Delorme, Nicolas, et al Cabinet Germain & Maureau 12, rue Boileau BP 6153 69466 Lyon Cedex 06 / FR | ||
Former [2012/49] | Regimbeau 20, rue de Chazelles 75847 Paris Cedex 17 / FR | ||
Former [2011/35] | Callon de Lamarck, Jean-Robert, et al Cabinet Regimbeau 20 rue de Chazelles 75847 Paris cedex 17 / FR | Application number, filing date | 09782468.4 | 01.09.2009 | [2021/04] | WO2009EP61287 | Priority number, date | FR20080056901 | 13.10.2008 Original published format: FR 0856901 | [2011/35] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2010043442 | Date: | 22.04.2010 | Language: | EN | [2010/16] | Type: | A1 Application with search report | No.: | EP2361373 | Date: | 31.08.2011 | Language: | EN | The application published by WIPO in one of the EPO official languages on 22.04.2010 takes the place of the publication of the European patent application. | [2011/35] | Type: | B1 Patent specification | No.: | EP2361373 | Date: | 27.01.2021 | Language: | EN | [2021/04] | Search report(s) | International search report - published on: | EP | 22.04.2010 | Classification | IPC: | G01J3/453 | [2011/35] | CPC: |
G01J3/453 (EP,US);
G01J3/4535 (US);
G01J3/4531 (US);
G01J3/457 (US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2021/04] | Extension states | AL | Not yet paid | BA | Not yet paid | RS | Not yet paid | Title | German: | PROZESS UND INSTRUMENT ZUR REKONSTRUKTION EINES IRREGULÄR ABGETASTETEN SCHMALBANDSIGNALS | [2011/35] | English: | PROCESS AND INSTRUMENT FOR RECONSTRUCTION OF AN IRREGULARLY SAMPLED NARROW-BAND SIGNAL | [2011/35] | French: | PROCÉDÉ ET INSTRUMENT POUR LA RECONSTRUCTION D UN SIGNAL À BANDE ÉTROITE ÉCHANTILLONNÉ DE MANIÈRE IRRÉGULIÈRE | [2011/35] | Entry into regional phase | 12.05.2011 | National basic fee paid | 12.05.2011 | Designation fee(s) paid | 12.05.2011 | Examination fee paid | Examination procedure | 12.05.2011 | Examination requested [2011/35] | 19.12.2011 | Amendment by applicant (claims and/or description) | 13.12.2017 | Despatch of a communication from the examining division (Time limit: M04) | 12.04.2018 | Reply to a communication from the examining division | 27.06.2019 | Despatch of a communication from the examining division (Time limit: M06) | 03.01.2020 | Reply to a communication from the examining division | 26.02.2020 | Despatch of a communication from the examining division (Time limit: M06) | 21.08.2020 | Reply to a communication from the examining division | 23.10.2020 | Communication of intention to grant the patent | 17.12.2020 | Fee for grant paid | 17.12.2020 | Fee for publishing/printing paid | 17.12.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 13.12.2017 | Opposition(s) | 28.10.2021 | No opposition filed within time limit [2022/01] | Fees paid | Renewal fee | 12.08.2011 | Renewal fee patent year 03 | 27.08.2012 | Renewal fee patent year 04 | 26.08.2013 | Renewal fee patent year 05 | 29.08.2014 | Renewal fee patent year 06 | 26.08.2015 | Renewal fee patent year 07 | 25.08.2016 | Renewal fee patent year 08 | 30.08.2017 | Renewal fee patent year 09 | 30.08.2018 | Renewal fee patent year 10 | 22.08.2019 | Renewal fee patent year 11 | 25.08.2020 | Renewal fee patent year 12 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 01.09.2009 | AT | 27.01.2021 | CY | 27.01.2021 | CZ | 27.01.2021 | DK | 27.01.2021 | EE | 27.01.2021 | ES | 27.01.2021 | FI | 27.01.2021 | HR | 27.01.2021 | IT | 27.01.2021 | LT | 27.01.2021 | LV | 27.01.2021 | MC | 27.01.2021 | MK | 27.01.2021 | MT | 27.01.2021 | NL | 27.01.2021 | PL | 27.01.2021 | RO | 27.01.2021 | SE | 27.01.2021 | SI | 27.01.2021 | SK | 27.01.2021 | SM | 27.01.2021 | BG | 27.04.2021 | NO | 27.04.2021 | GR | 28.04.2021 | IS | 27.05.2021 | PT | 27.05.2021 | GB | 01.09.2021 | IE | 01.09.2021 | LU | 01.09.2021 | BE | 30.09.2021 | CH | 30.09.2021 | LI | 30.09.2021 | [2024/41] |
Former [2024/22] | HU | 01.09.2009 | |
AT | 27.01.2021 | ||
CY | 27.01.2021 | ||
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
ES | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
IT | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
MC | 27.01.2021 | ||
MK | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
SE | 27.01.2021 | ||
SI | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
GB | 01.09.2021 | ||
IE | 01.09.2021 | ||
LU | 01.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2023/28] | HU | 01.09.2009 | |
AT | 27.01.2021 | ||
CY | 27.01.2021 | ||
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
ES | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
IT | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
MC | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
SE | 27.01.2021 | ||
SI | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
GB | 01.09.2021 | ||
IE | 01.09.2021 | ||
LU | 01.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2023/24] | AT | 27.01.2021 | |
CY | 27.01.2021 | ||
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
ES | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
IT | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
MC | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
SE | 27.01.2021 | ||
SI | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
GB | 01.09.2021 | ||
IE | 01.09.2021 | ||
LU | 01.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2022/37] | AT | 27.01.2021 | |
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
ES | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
IT | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
MC | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
SE | 27.01.2021 | ||
SI | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
GB | 01.09.2021 | ||
IE | 01.09.2021 | ||
LU | 01.09.2021 | ||
BE | 30.09.2021 | ||
CH | 30.09.2021 | ||
LI | 30.09.2021 | ||
Former [2022/35] | AT | 27.01.2021 | |
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
ES | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
IT | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
MC | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
SE | 27.01.2021 | ||
SI | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
GB | 01.09.2021 | ||
IE | 01.09.2021 | ||
LU | 01.09.2021 | ||
BE | 30.09.2021 | ||
Former [2022/34] | AT | 27.01.2021 | |
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
ES | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
IT | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
MC | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
SE | 27.01.2021 | ||
SI | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
LU | 01.09.2021 | ||
BE | 30.09.2021 | ||
Former [2022/25] | AT | 27.01.2021 | |
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
ES | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
IT | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
MC | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
SE | 27.01.2021 | ||
SI | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
Former [2022/23] | AT | 27.01.2021 | |
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
ES | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
IT | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
SE | 27.01.2021 | ||
SI | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
Former [2022/13] | AT | 27.01.2021 | |
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
ES | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
SE | 27.01.2021 | ||
SI | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
PT | 27.05.2021 | ||
Former [2022/10] | AT | 27.01.2021 | |
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
ES | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
SE | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
PT | 27.05.2021 | ||
Former [2021/51] | AT | 27.01.2021 | |
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
ES | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
SE | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
Former [2021/50] | AT | 27.01.2021 | |
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
SE | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
Former [2021/49] | AT | 27.01.2021 | |
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
SE | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
Former [2021/48] | AT | 27.01.2021 | |
CZ | 27.01.2021 | ||
EE | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
SE | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
Former [2021/46] | AT | 27.01.2021 | |
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
SE | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
Former [2021/42] | AT | 27.01.2021 | |
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
SE | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
Former [2021/39] | AT | 27.01.2021 | |
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
SE | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
PT | 27.05.2021 | ||
Former [2021/38] | AT | 27.01.2021 | |
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
NL | 27.01.2021 | ||
SE | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
PT | 27.05.2021 | ||
Former [2021/37] | AT | 27.01.2021 | |
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
NL | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
PT | 27.05.2021 | ||
Former [2021/36] | FI | 27.01.2021 | |
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
NL | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
PT | 27.05.2021 | ||
Former [2021/35] | FI | 27.01.2021 | |
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
NL | 27.01.2021 | ||
NO | 27.04.2021 | ||
PT | 27.05.2021 | ||
Former [2021/34] | FI | 27.01.2021 | |
LT | 27.01.2021 | ||
NL | 27.01.2021 | ||
NO | 27.04.2021 | ||
PT | 27.05.2021 | ||
Former [2021/33] | FI | 27.01.2021 | |
LT | 27.01.2021 | ||
NO | 27.04.2021 | ||
PT | 27.05.2021 | Cited in | International search | [X] - BRACHET F. ET AL, "Static Fourier transform spectroscopy breadboards for atmospheric chemistry and climate", PROC.OF SPIE, (20080927), vol. 7100, pages 710019-1 - 710019-11, XP002526962 [X] 1-15 * abstract * * pages 710019-4 * * pages 710019-5, line 1 - pages 710019-6, line L * DOI: http://dx.doi.org/10.1117/12.797686 | [A] - ROSAK A ET AL, "Progress report of a static Fourier transform spectrometer breadboard", 5TH INTERNATIONAL CONFERENCE ON SPACE OPTICS (ICSO 2004) ESA NOORDWIJK, NETHERLANDS, (2004), ISBN 92-9092-865-4, pages 67 - 71, XP002526972 [A] 1-15 * the whole document * |