blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2334873

EP2334873 - Bituminous mix for the preparation of a wearing and its use, and use of a low bulk density material. [Right-click to bookmark this link]
Former [2011/25]BITUMINOUS COATING WITH GREAT ACOUSTIC PERFORMANCE
[2015/17]
StatusNo opposition filed within time limit
Status updated on  30.09.2016
Database last updated on 24.08.2024
Most recent event   Tooltip17.08.2018Lapse of the patent in a contracting state
New state(s): BG
published on 19.09.2018  [2018/38]
Applicant(s)For all designated states
Eurovia
18 Place de l'Europe
92500 Rueil-Malmaison / FR
[2011/25]
Inventor(s)01 / MAZE, Michel
18 rue Moulis
F-33000 Bordeaux / FR
02 / FAUCON-DUMONT, Stéphane
3 avenue du Maréchal Leclerc
F-33127 Martignas / FR
03 / FER, Sébastien
1 rue du Chanoine Montfort
F-33160 Saint Médard en Jalles / FR
 [2011/25]
Representative(s)Regimbeau
20, rue de Chazelles
75847 Paris Cedex 17 / FR
[2012/49]
Former [2011/25]Ahner, Francis, et al
Cabinet Régimbeau 20, rue de Chazelles
75847 Paris Cedex 17 / FR
Application number, filing date09783695.102.10.2009
[2011/25]
WO2009EP62834
Priority number, dateFR2008005668302.10.2008         Original published format: FR 0856683
[2011/25]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report
No.:WO2010037853
Date:08.04.2010
Language:FR
[2010/14]
Type: A1 Application with search report 
No.:EP2334873
Date:22.06.2011
Language:FR
The application published by WIPO in one of the EPO official languages on 08.04.2010 takes the place of the publication of the European patent application.
[2011/25]
Type: B1 Patent specification 
No.:EP2334873
Date:25.11.2015
Language:FR
[2015/48]
Search report(s)International search report - published on:EP08.04.2010
ClassificationIPC:E01C7/18, E01C7/26, C08L95/00, C09D195/00
[2015/17]
CPC:
E01C7/265 (EP,US); C08L95/00 (EP,US); C09D195/00 (EP,US);
E01C7/182 (EP,US)
Former IPC [2011/25]E01C11/22, E01C7/18, E01C7/26, C08L95/00
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   SM,   TR [2015/48]
Former [2011/25]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  SE,  SI,  SK,  SM,  TR 
Extension statesRS13.04.2011
TitleGerman:Bituminöse Beschichtung zur Herstellung einer Schicht und deren Verwendung, und Verwendung eines Materials mit geringer Rohdichte[2015/17]
English:Bituminous mix for the preparation of a wearing and its use, and use of a low bulk density material.[2015/17]
French:Enrobé bitumineux destiné à la préparation d'une couche de roulement et son utilisation, et utilisation d'un matériau de faible masse volumique apparente.[2015/17]
Former [2011/25]BITUMINÖSE BESCHICHTUNG MIT STARKER AKUSTISCHER LEISTUNG
Former [2011/25]BITUMINOUS COATING WITH GREAT ACOUSTIC PERFORMANCE
Former [2011/25]ENROBÉ BITUMINEUX À PERFORMANCE ACOUSTIQUE IMPORTANTE
Entry into regional phase13.04.2011National basic fee paid 
13.04.2011Designation fee(s) paid 
13.04.2011Examination fee paid 
Examination procedure13.04.2011Examination requested  [2011/25]
10.11.2011Amendment by applicant (claims and/or description)
07.05.2015Communication of intention to grant the patent
07.09.2015Fee for grant paid
07.09.2015Fee for publishing/printing paid
07.09.2015Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  07.05.2015
Opposition(s)26.08.2016No opposition filed within time limit [2016/44]
Fees paidRenewal fee
17.10.2011Renewal fee patent year 03
15.10.2012Renewal fee patent year 04
15.10.2013Renewal fee patent year 05
08.10.2014Renewal fee patent year 06
07.10.2015Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU02.10.2009
AT25.11.2015
BG25.11.2015
CY25.11.2015
DK25.11.2015
EE25.11.2015
ES25.11.2015
FI25.11.2015
HR25.11.2015
IT25.11.2015
LT25.11.2015
LV25.11.2015
MC25.11.2015
MK25.11.2015
MT25.11.2015
NL25.11.2015
RO25.11.2015
SE25.11.2015
SI25.11.2015
SK25.11.2015
SM25.11.2015
TR25.11.2015
NO25.02.2016
GR26.02.2016
IS25.03.2016
PT25.03.2016
[2018/38]
Former [2018/33]HU02.10.2009
AT25.11.2015
CY25.11.2015
DK25.11.2015
EE25.11.2015
ES25.11.2015
FI25.11.2015
HR25.11.2015
IT25.11.2015
LT25.11.2015
LV25.11.2015
MC25.11.2015
MK25.11.2015
MT25.11.2015
NL25.11.2015
RO25.11.2015
SE25.11.2015
SI25.11.2015
SK25.11.2015
SM25.11.2015
TR25.11.2015
NO25.02.2016
GR26.02.2016
IS25.03.2016
PT25.03.2016
Former [2018/29]HU02.10.2009
AT25.11.2015
CY25.11.2015
DK25.11.2015
EE25.11.2015
ES25.11.2015
FI25.11.2015
HR25.11.2015
IT25.11.2015
LT25.11.2015
LV25.11.2015
MC25.11.2015
MK25.11.2015
NL25.11.2015
RO25.11.2015
SE25.11.2015
SI25.11.2015
SK25.11.2015
SM25.11.2015
TR25.11.2015
NO25.02.2016
GR26.02.2016
IS25.03.2016
PT25.03.2016
Former [2018/28]HU02.10.2009
AT25.11.2015
CY25.11.2015
DK25.11.2015
EE25.11.2015
ES25.11.2015
FI25.11.2015
HR25.11.2015
IT25.11.2015
LT25.11.2015
LV25.11.2015
MC25.11.2015
MK25.11.2015
NL25.11.2015
RO25.11.2015
SE25.11.2015
SI25.11.2015
SK25.11.2015
SM25.11.2015
NO25.02.2016
GR26.02.2016
IS25.03.2016
PT25.03.2016
Former [2017/40]AT25.11.2015
DK25.11.2015
EE25.11.2015
ES25.11.2015
FI25.11.2015
HR25.11.2015
IT25.11.2015
LT25.11.2015
LV25.11.2015
MC25.11.2015
NL25.11.2015
RO25.11.2015
SE25.11.2015
SI25.11.2015
SK25.11.2015
SM25.11.2015
NO25.02.2016
GR26.02.2016
IS25.03.2016
PT25.03.2016
Former [2016/49]AT25.11.2015
DK25.11.2015
EE25.11.2015
ES25.11.2015
FI25.11.2015
HR25.11.2015
IT25.11.2015
LT25.11.2015
LV25.11.2015
NL25.11.2015
RO25.11.2015
SE25.11.2015
SI25.11.2015
SK25.11.2015
SM25.11.2015
NO25.02.2016
GR26.02.2016
IS25.03.2016
PT25.03.2016
Former [2016/39]AT25.11.2015
DK25.11.2015
EE25.11.2015
ES25.11.2015
FI25.11.2015
HR25.11.2015
IT25.11.2015
LT25.11.2015
LV25.11.2015
NL25.11.2015
RO25.11.2015
SE25.11.2015
SK25.11.2015
SM25.11.2015
NO25.02.2016
GR26.02.2016
IS25.03.2016
PT25.03.2016
Former [2016/38]AT25.11.2015
EE25.11.2015
ES25.11.2015
FI25.11.2015
HR25.11.2015
IT25.11.2015
LT25.11.2015
LV25.11.2015
NL25.11.2015
RO25.11.2015
SE25.11.2015
SK25.11.2015
SM25.11.2015
NO25.02.2016
GR26.02.2016
IS25.03.2016
PT25.03.2016
Former [2016/36]AT25.11.2015
EE25.11.2015
ES25.11.2015
FI25.11.2015
HR25.11.2015
IT25.11.2015
LT25.11.2015
LV25.11.2015
NL25.11.2015
RO25.11.2015
SE25.11.2015
SK25.11.2015
NO25.02.2016
GR26.02.2016
IS25.03.2016
PT25.03.2016
Former [2016/25]AT25.11.2015
ES25.11.2015
FI25.11.2015
HR25.11.2015
LT25.11.2015
LV25.11.2015
NL25.11.2015
SE25.11.2015
NO25.02.2016
GR26.02.2016
IS25.03.2016
PT25.03.2016
Former [2016/24]AT25.11.2015
ES25.11.2015
FI25.11.2015
HR25.11.2015
LT25.11.2015
NL25.11.2015
SE25.11.2015
NO25.02.2016
GR26.02.2016
IS25.03.2016
PT25.03.2016
Former [2016/23]ES25.11.2015
HR25.11.2015
LT25.11.2015
NL25.11.2015
SE25.11.2015
NO25.02.2016
IS25.03.2016
Former [2016/22]ES25.11.2015
LT25.11.2015
NL25.11.2015
NO25.02.2016
IS25.03.2016
Former [2016/21]ES25.11.2015
LT25.11.2015
NO25.02.2016
Former [2016/20]ES25.11.2015
LT25.11.2015
Cited inInternational search[A]US2863841  (BCRNIER NAPOLEON M, et al) [A] 2 * column 2, lines 6-10,34-61 ** column 1, lines 15-18 *;
 [X]FR2344588  (RHEINISCHE KALKSTEINWERKE [DE]) [X] 1,3-4,8-9 * page 1, lines 1-3 * * page 2, lines 6-21,38 *;
 [XYI]AT383609B  (ASPHALT GES RICHARD FELSINGER [AT]) [X] 1,3-4,8-9 * page 4, lines 14-19 * * page 2, lines 1-2,34-39 * [Y] 2 [I] 5-7;
 [YA]JPH06146204  (SEKISUI PLASTICS) [Y] 2 * the whole document * [A] 9;
 [YA]JP2000355903  (TSUKASA IND) [Y] 2 * the whole document * [A] 9
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.