EP2326451 - IMPROVED CONNECTOR FOR AN ELECTRICAL DISCHARGE MACHINE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 09.11.2018 Database last updated on 19.10.2024 | |
Former | The patent has been granted Status updated on 01.12.2017 | ||
Former | Grant of patent is intended Status updated on 19.07.2017 | ||
Former | Examination is in progress Status updated on 07.07.2017 | Most recent event Tooltip | 26.06.2020 | Lapse of the patent in a contracting state New state(s): MK | published on 29.07.2020 [2020/31] | Applicant(s) | For all designated states Sarclad Limited Broombank Park Chesterfield Trading Estate Sheepbridge Chesterfield S41 9RT / GB | [2011/22] | Inventor(s) | 01 /
WYBROW, Mark Sarclad Limited Broombank Park Chesterfield Trading Estate Sheepbridge Chesterfield S41 9RT / GB | [2018/01] |
Former [2011/22] | 01 /
WYBROW, Mark Sarclad Limited Broombank Park Chesterfield Trading Estate Sheepbridge Chesterfield S41 9RT / GB | Representative(s) | Fry, David John, et al Agile IP LLP Airport House Purley Way Croydon, Greater London CR0 0XZ / GB | [N/P] |
Former [2018/01] | Fry, David John, et al Agile IP LLP Airport House Purley Way Croydon, Surrey CR0 0XZ / GB | ||
Former [2012/47] | Fry, David John, et al Agile IP LLP Airport House Purley Way Croydon Surrey CRO 0XZ / GB | ||
Former [2011/22] | Fry, David John, et al AIP Consultancy LLP Airport House Purley Way Crodon Surrey CRO 0XZ / GB | Application number, filing date | 09784758.6 | 21.07.2009 | [2011/22] | WO2009GB01806 | Priority number, date | GB20080015062 | 18.08.2008 Original published format: GB 0815062 | [2011/22] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2010020743 | Date: | 25.02.2010 | Language: | EN | [2010/08] | Type: | A1 Application with search report | No.: | EP2326451 | Date: | 01.06.2011 | Language: | EN | The application published by WIPO in one of the EPO official languages on 25.02.2010 takes the place of the publication of the European patent application. | [2011/22] | Type: | B1 Patent specification | No.: | EP2326451 | Date: | 03.01.2018 | Language: | EN | [2018/01] | Search report(s) | International search report - published on: | EP | 25.02.2010 | Classification | IPC: | B23H7/26, B23H9/04 | [2011/22] | CPC: |
B23H9/04 (EP,GB);
B23H7/26 (EP)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2018/01] |
Former [2011/22] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR | Title | German: | VERBESSERTER VERBINDER FÜR EINE FUNKENEROSIONSMASCHINE | [2011/22] | English: | IMPROVED CONNECTOR FOR AN ELECTRICAL DISCHARGE MACHINE | [2011/22] | French: | CONNECTEUR AMÉLIORÉ POUR MACHINE D'USINAGE PAR ÉTINCELAGE | [2011/22] | Entry into regional phase | 17.03.2011 | National basic fee paid | 17.03.2011 | Designation fee(s) paid | 17.03.2011 | Examination fee paid | Examination procedure | 17.03.2011 | Examination requested [2011/22] | 26.05.2011 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report not received in time | 16.06.2011 | Amendment by applicant (claims and/or description) | 19.02.2013 | Despatch of a communication from the examining division (Time limit: M06) | 20.08.2013 | Reply to a communication from the examining division | 20.07.2017 | Communication of intention to grant the patent | 24.11.2017 | Fee for grant paid | 24.11.2017 | Fee for publishing/printing paid | 24.11.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 19.02.2013 | Opposition(s) | 05.10.2018 | No opposition filed within time limit [2018/50] | Request for further processing for: | 15.06.2011 | Request for further processing filed | 15.06.2011 | Full payment received (date of receipt of payment) Request granted | 29.06.2011 | Decision despatched | Fees paid | Renewal fee | 15.06.2011 | Renewal fee patent year 03 | 31.07.2012 | Renewal fee patent year 04 | 22.07.2013 | Renewal fee patent year 05 | 23.07.2014 | Renewal fee patent year 06 | 23.07.2015 | Renewal fee patent year 07 | 22.07.2016 | Renewal fee patent year 08 | 31.07.2017 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 21.07.2009 | AT | 03.01.2018 | CY | 03.01.2018 | CZ | 03.01.2018 | DK | 03.01.2018 | EE | 03.01.2018 | ES | 03.01.2018 | FI | 03.01.2018 | HR | 03.01.2018 | LT | 03.01.2018 | LV | 03.01.2018 | MC | 03.01.2018 | MK | 03.01.2018 | PL | 03.01.2018 | PT | 03.01.2018 | RO | 03.01.2018 | SE | 03.01.2018 | SI | 03.01.2018 | SM | 03.01.2018 | TR | 03.01.2018 | BG | 03.04.2018 | NO | 03.04.2018 | GR | 04.04.2018 | IS | 03.05.2018 | IE | 21.07.2018 | LU | 21.07.2018 | MT | 21.07.2018 | BE | 31.07.2018 | CH | 31.07.2018 | LI | 31.07.2018 | [2020/31] |
Former [2020/27] | HU | 21.07.2009 | |
AT | 03.01.2018 | ||
CY | 03.01.2018 | ||
CZ | 03.01.2018 | ||
DK | 03.01.2018 | ||
EE | 03.01.2018 | ||
ES | 03.01.2018 | ||
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
LV | 03.01.2018 | ||
MC | 03.01.2018 | ||
PL | 03.01.2018 | ||
PT | 03.01.2018 | ||
RO | 03.01.2018 | ||
SE | 03.01.2018 | ||
SI | 03.01.2018 | ||
SM | 03.01.2018 | ||
TR | 03.01.2018 | ||
BG | 03.04.2018 | ||
NO | 03.04.2018 | ||
GR | 04.04.2018 | ||
IS | 03.05.2018 | ||
IE | 21.07.2018 | ||
LU | 21.07.2018 | ||
MT | 21.07.2018 | ||
BE | 31.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
Former [2020/16] | AT | 03.01.2018 | |
CY | 03.01.2018 | ||
CZ | 03.01.2018 | ||
DK | 03.01.2018 | ||
EE | 03.01.2018 | ||
ES | 03.01.2018 | ||
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
LV | 03.01.2018 | ||
MC | 03.01.2018 | ||
PL | 03.01.2018 | ||
RO | 03.01.2018 | ||
SE | 03.01.2018 | ||
SI | 03.01.2018 | ||
SM | 03.01.2018 | ||
TR | 03.01.2018 | ||
BG | 03.04.2018 | ||
NO | 03.04.2018 | ||
GR | 04.04.2018 | ||
IS | 03.05.2018 | ||
IE | 21.07.2018 | ||
LU | 21.07.2018 | ||
MT | 21.07.2018 | ||
BE | 31.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
Former [2020/08] | AT | 03.01.2018 | |
CY | 03.01.2018 | ||
CZ | 03.01.2018 | ||
DK | 03.01.2018 | ||
EE | 03.01.2018 | ||
ES | 03.01.2018 | ||
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
LV | 03.01.2018 | ||
MC | 03.01.2018 | ||
PL | 03.01.2018 | ||
RO | 03.01.2018 | ||
SE | 03.01.2018 | ||
SI | 03.01.2018 | ||
SM | 03.01.2018 | ||
BG | 03.04.2018 | ||
NO | 03.04.2018 | ||
GR | 04.04.2018 | ||
IS | 03.05.2018 | ||
IE | 21.07.2018 | ||
LU | 21.07.2018 | ||
MT | 21.07.2018 | ||
BE | 31.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
Former [2019/24] | AT | 03.01.2018 | |
CY | 03.01.2018 | ||
CZ | 03.01.2018 | ||
DK | 03.01.2018 | ||
EE | 03.01.2018 | ||
ES | 03.01.2018 | ||
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
LV | 03.01.2018 | ||
MC | 03.01.2018 | ||
PL | 03.01.2018 | ||
RO | 03.01.2018 | ||
SE | 03.01.2018 | ||
SI | 03.01.2018 | ||
SM | 03.01.2018 | ||
BG | 03.04.2018 | ||
NO | 03.04.2018 | ||
GR | 04.04.2018 | ||
IS | 03.05.2018 | ||
IE | 21.07.2018 | ||
LU | 21.07.2018 | ||
BE | 31.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
Former [2019/21] | AT | 03.01.2018 | |
CY | 03.01.2018 | ||
CZ | 03.01.2018 | ||
DK | 03.01.2018 | ||
EE | 03.01.2018 | ||
ES | 03.01.2018 | ||
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
LV | 03.01.2018 | ||
MC | 03.01.2018 | ||
PL | 03.01.2018 | ||
RO | 03.01.2018 | ||
SE | 03.01.2018 | ||
SI | 03.01.2018 | ||
SM | 03.01.2018 | ||
BG | 03.04.2018 | ||
NO | 03.04.2018 | ||
GR | 04.04.2018 | ||
IS | 03.05.2018 | ||
IE | 21.07.2018 | ||
LU | 21.07.2018 | ||
CH | 31.07.2018 | ||
LI | 31.07.2018 | ||
Former [2019/19] | AT | 03.01.2018 | |
CY | 03.01.2018 | ||
CZ | 03.01.2018 | ||
DK | 03.01.2018 | ||
EE | 03.01.2018 | ||
ES | 03.01.2018 | ||
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
LV | 03.01.2018 | ||
MC | 03.01.2018 | ||
PL | 03.01.2018 | ||
RO | 03.01.2018 | ||
SE | 03.01.2018 | ||
SI | 03.01.2018 | ||
SM | 03.01.2018 | ||
BG | 03.04.2018 | ||
NO | 03.04.2018 | ||
GR | 04.04.2018 | ||
IS | 03.05.2018 | ||
IE | 21.07.2018 | ||
LU | 21.07.2018 | ||
Former [2019/17] | AT | 03.01.2018 | |
CY | 03.01.2018 | ||
CZ | 03.01.2018 | ||
DK | 03.01.2018 | ||
EE | 03.01.2018 | ||
ES | 03.01.2018 | ||
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
LV | 03.01.2018 | ||
MC | 03.01.2018 | ||
PL | 03.01.2018 | ||
RO | 03.01.2018 | ||
SE | 03.01.2018 | ||
SI | 03.01.2018 | ||
SM | 03.01.2018 | ||
BG | 03.04.2018 | ||
NO | 03.04.2018 | ||
GR | 04.04.2018 | ||
IS | 03.05.2018 | ||
LU | 21.07.2018 | ||
Former [2019/15] | AT | 03.01.2018 | |
CY | 03.01.2018 | ||
CZ | 03.01.2018 | ||
DK | 03.01.2018 | ||
EE | 03.01.2018 | ||
ES | 03.01.2018 | ||
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
LV | 03.01.2018 | ||
MC | 03.01.2018 | ||
PL | 03.01.2018 | ||
RO | 03.01.2018 | ||
SE | 03.01.2018 | ||
SI | 03.01.2018 | ||
SM | 03.01.2018 | ||
BG | 03.04.2018 | ||
NO | 03.04.2018 | ||
GR | 04.04.2018 | ||
IS | 03.05.2018 | ||
Former [2019/13] | AT | 03.01.2018 | |
CY | 03.01.2018 | ||
CZ | 03.01.2018 | ||
DK | 03.01.2018 | ||
EE | 03.01.2018 | ||
ES | 03.01.2018 | ||
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
LV | 03.01.2018 | ||
PL | 03.01.2018 | ||
RO | 03.01.2018 | ||
SE | 03.01.2018 | ||
SI | 03.01.2018 | ||
SM | 03.01.2018 | ||
BG | 03.04.2018 | ||
NO | 03.04.2018 | ||
GR | 04.04.2018 | ||
IS | 03.05.2018 | ||
Former [2018/52] | AT | 03.01.2018 | |
CY | 03.01.2018 | ||
CZ | 03.01.2018 | ||
DK | 03.01.2018 | ||
EE | 03.01.2018 | ||
ES | 03.01.2018 | ||
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
LV | 03.01.2018 | ||
PL | 03.01.2018 | ||
RO | 03.01.2018 | ||
SE | 03.01.2018 | ||
SM | 03.01.2018 | ||
BG | 03.04.2018 | ||
NO | 03.04.2018 | ||
GR | 04.04.2018 | ||
IS | 03.05.2018 | ||
Former [2018/51] | AT | 03.01.2018 | |
CY | 03.01.2018 | ||
CZ | 03.01.2018 | ||
DK | 03.01.2018 | ||
EE | 03.01.2018 | ||
ES | 03.01.2018 | ||
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
LV | 03.01.2018 | ||
PL | 03.01.2018 | ||
RO | 03.01.2018 | ||
SE | 03.01.2018 | ||
BG | 03.04.2018 | ||
NO | 03.04.2018 | ||
GR | 04.04.2018 | ||
IS | 03.05.2018 | ||
Former [2018/50] | AT | 03.01.2018 | |
CY | 03.01.2018 | ||
CZ | 03.01.2018 | ||
EE | 03.01.2018 | ||
ES | 03.01.2018 | ||
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
LV | 03.01.2018 | ||
PL | 03.01.2018 | ||
RO | 03.01.2018 | ||
SE | 03.01.2018 | ||
BG | 03.04.2018 | ||
NO | 03.04.2018 | ||
GR | 04.04.2018 | ||
IS | 03.05.2018 | ||
Former [2018/40] | AT | 03.01.2018 | |
CY | 03.01.2018 | ||
ES | 03.01.2018 | ||
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
LV | 03.01.2018 | ||
PL | 03.01.2018 | ||
SE | 03.01.2018 | ||
BG | 03.04.2018 | ||
NO | 03.04.2018 | ||
GR | 04.04.2018 | ||
IS | 03.05.2018 | ||
Former [2018/39] | AT | 03.01.2018 | |
CY | 03.01.2018 | ||
ES | 03.01.2018 | ||
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
LV | 03.01.2018 | ||
PL | 03.01.2018 | ||
SE | 03.01.2018 | ||
NO | 03.04.2018 | ||
GR | 04.04.2018 | ||
IS | 03.05.2018 | ||
Former [2018/38] | AT | 03.01.2018 | |
CY | 03.01.2018 | ||
ES | 03.01.2018 | ||
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
PL | 03.01.2018 | ||
NO | 03.04.2018 | ||
GR | 04.04.2018 | ||
IS | 03.05.2018 | ||
Former [2018/37] | CY | 03.01.2018 | |
ES | 03.01.2018 | ||
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
PL | 03.01.2018 | ||
NO | 03.04.2018 | ||
GR | 04.04.2018 | ||
Former [2018/36] | CY | 03.01.2018 | |
ES | 03.01.2018 | ||
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
PL | 03.01.2018 | ||
NO | 03.04.2018 | ||
Former [2018/35] | CY | 03.01.2018 | |
FI | 03.01.2018 | ||
HR | 03.01.2018 | ||
LT | 03.01.2018 | ||
NO | 03.04.2018 | Cited in | International search | [XY]EP0304235 (SARCLAD INT LTD [GB]); | [Y]EP1402985 (SIEMENS AG OESTERREICH [AT]); | [Y]US6791054 (MERTZ STEVEN CRAIG [US]); | [Y]EP1820593 (ALWA GMBH KONSTRUKTION & FORME [DE]) | Examination | DE20320098U | EP1629921 |