EP2338213 - LAYING NETWORK CABLES IN WATER SUPPLY PIPES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.07.2020 Database last updated on 21.05.2024 | |
Former | The patent has been granted Status updated on 19.07.2019 | ||
Former | Grant of patent is intended Status updated on 08.01.2019 | ||
Former | Examination is in progress Status updated on 15.08.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Craley Group Limited Unit 4 Industrial Estate Hawley Lane Farnborough Hampshire GU14 8EH / GB | [2015/16] |
Former [2013/36] | For all designated states CMS (Cable Management Supplies) Plc Unit 4, Hawley Industrial Estate Hawley Lane Farnborough Hampshire GU14 8EH / GB | ||
Former [2011/26] | For all designated states I3 Group Limited 18 the Parks Newton Le Willows Haydock, Merseyside WA12 0JQ / GB | Inventor(s) | 01 /
THOMAS, Elfed 38 Gloddaeth View Penrhyn Bay Llandudno Gwynedd LL30 3FB / GB | [2019/34] |
Former [2011/26] | 01 /
THOMAS, Elfed 38 Gloddaeth View Penrhyn Bay Llandudno Gwynedd LL30 3FB / GB | Representative(s) | Wilson Gunn Blackfriars House The Parsonage 5th Floor Manchester M3 2JA / GB | [2012/10] |
Former [2011/26] | Wilson Gunn 5th Floor Blackfriars House The Parsonage Manchester M3 2JA / GB | Application number, filing date | 09785627.2 | 11.09.2009 | [2011/26] | WO2009GB51172 | Priority number, date | GB20080016616 | 11.09.2008 Original published format: GB 0816616 | [2011/26] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2010029365 | Date: | 18.03.2010 | Language: | EN | [2010/11] | Type: | A2 Application without search report | No.: | EP2338213 | Date: | 29.06.2011 | Language: | EN | The application published by WIPO in one of the EPO official languages on 18.03.2010 takes the place of the publication of the European patent application. | [2011/26] | Type: | B1 Patent specification | No.: | EP2338213 | Date: | 21.08.2019 | Language: | EN | [2019/34] | Search report(s) | International search report - published on: | EP | 06.05.2010 | Classification | IPC: | H02G1/08, H02G9/06, G02B6/44, G02B6/50 | [2019/03] | CPC: |
H02G1/086 (EP,US);
G02B6/475 (GB);
G02B6/50 (EP,US);
H02G1/08 (GB);
H02G9/06 (EP,GB,US);
Y10T29/49169 (EP,US);
Y10T29/5367 (EP,US)
(-)
|
Former IPC [2011/26] | H02G1/08, G02B6/44, G02B6/50 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2019/25] |
Former [2011/26] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR | Extension states | AL | Not yet paid | BA | Not yet paid | RS | Not yet paid | Title | German: | VERLEGUNG VON NETZWERKKABELN IN WASSERVERSORGUNGSROHREN | [2019/03] | English: | LAYING NETWORK CABLES IN WATER SUPPLY PIPES | [2011/26] | French: | POSE DE CÂBLES DE RÉSEAU DANS DES CANALISATIONS D ADDUCTION D EAU | [2011/26] |
Former [2011/26] | VERLEGEN VON NETZWERKKABELN IN WASSERVERSORGUNGSROHREN | Entry into regional phase | 11.04.2011 | National basic fee paid | 11.04.2011 | Designation fee(s) paid | 11.04.2011 | Examination fee paid | Examination procedure | 11.04.2011 | Amendment by applicant (claims and/or description) | 11.04.2011 | Examination requested [2011/26] | 11.03.2014 | Despatch of a communication from the examining division (Time limit: M03) | 12.05.2014 | Reply to a communication from the examining division | 25.08.2015 | Despatch of a communication from the examining division (Time limit: M05) | 04.02.2016 | Reply to a communication from the examining division | 03.08.2017 | Despatch of a communication from the examining division (Time limit: M03) | 10.11.2017 | Reply to a communication from the examining division | 09.01.2019 | Communication of intention to grant the patent | 17.05.2019 | Receipt of the translation of the claim(s) | 26.06.2019 | Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time | 11.07.2019 | Fee for grant paid | 11.07.2019 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 11.03.2014 | Opposition(s) | 03.06.2020 | No opposition filed within time limit [2020/33] | Request for further processing for: | The application is deemed to be withdrawn due to failure to fulfill actions required for granting the patent | 11.07.2019 | Request for further processing filed | 11.07.2019 | Full payment received (date of receipt of payment) Request granted | 23.07.2019 | Decision despatched | Fees paid | Renewal fee | 29.03.2012 | Renewal fee patent year 03 | 27.03.2013 | Renewal fee patent year 04 | 04.09.2013 | Renewal fee patent year 05 | 30.09.2014 | Renewal fee patent year 06 | 01.09.2015 | Renewal fee patent year 07 | 08.07.2016 | Renewal fee patent year 08 | 06.09.2017 | Renewal fee patent year 09 | 10.09.2018 | Renewal fee patent year 10 | Penalty fee | Additional fee for renewal fee | 30.09.2011 | 03   M06   Fee paid on   29.03.2012 | 30.09.2012 | 04   M06   Fee paid on   27.03.2013 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 11.09.2009 | AT | 21.08.2019 | CY | 21.08.2019 | CZ | 21.08.2019 | DK | 21.08.2019 | EE | 21.08.2019 | ES | 21.08.2019 | FI | 21.08.2019 | HR | 21.08.2019 | IT | 21.08.2019 | LT | 21.08.2019 | LV | 21.08.2019 | MC | 21.08.2019 | MK | 21.08.2019 | MT | 21.08.2019 | NL | 21.08.2019 | PL | 21.08.2019 | RO | 21.08.2019 | SE | 21.08.2019 | SI | 21.08.2019 | SK | 21.08.2019 | SM | 21.08.2019 | TR | 21.08.2019 | IE | 11.09.2019 | LU | 11.09.2019 | BE | 30.09.2019 | CH | 30.09.2019 | LI | 30.09.2019 | BG | 21.11.2019 | NO | 21.11.2019 | GR | 22.11.2019 | IS | 21.12.2019 | PT | 23.12.2019 | [2022/31] |
Former [2021/34] | HU | 11.09.2009 | |
AT | 21.08.2019 | ||
CY | 21.08.2019 | ||
CZ | 21.08.2019 | ||
DK | 21.08.2019 | ||
EE | 21.08.2019 | ||
ES | 21.08.2019 | ||
FI | 21.08.2019 | ||
HR | 21.08.2019 | ||
IT | 21.08.2019 | ||
LT | 21.08.2019 | ||
LV | 21.08.2019 | ||
MC | 21.08.2019 | ||
MT | 21.08.2019 | ||
NL | 21.08.2019 | ||
PL | 21.08.2019 | ||
RO | 21.08.2019 | ||
SE | 21.08.2019 | ||
SI | 21.08.2019 | ||
SK | 21.08.2019 | ||
SM | 21.08.2019 | ||
TR | 21.08.2019 | ||
IE | 11.09.2019 | ||
LU | 11.09.2019 | ||
BE | 30.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
BG | 21.11.2019 | ||
NO | 21.11.2019 | ||
GR | 22.11.2019 | ||
IS | 21.12.2019 | ||
PT | 23.12.2019 | ||
Former [2021/32] | HU | 11.09.2009 | |
AT | 21.08.2019 | ||
CY | 21.08.2019 | ||
CZ | 21.08.2019 | ||
DK | 21.08.2019 | ||
EE | 21.08.2019 | ||
ES | 21.08.2019 | ||
FI | 21.08.2019 | ||
HR | 21.08.2019 | ||
IT | 21.08.2019 | ||
LT | 21.08.2019 | ||
LV | 21.08.2019 | ||
MC | 21.08.2019 | ||
NL | 21.08.2019 | ||
PL | 21.08.2019 | ||
RO | 21.08.2019 | ||
SE | 21.08.2019 | ||
SI | 21.08.2019 | ||
SK | 21.08.2019 | ||
SM | 21.08.2019 | ||
TR | 21.08.2019 | ||
IE | 11.09.2019 | ||
LU | 11.09.2019 | ||
BE | 30.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
BG | 21.11.2019 | ||
NO | 21.11.2019 | ||
GR | 22.11.2019 | ||
IS | 21.12.2019 | ||
PT | 23.12.2019 | ||
Former [2021/26] | AT | 21.08.2019 | |
CY | 21.08.2019 | ||
CZ | 21.08.2019 | ||
DK | 21.08.2019 | ||
EE | 21.08.2019 | ||
ES | 21.08.2019 | ||
FI | 21.08.2019 | ||
HR | 21.08.2019 | ||
IT | 21.08.2019 | ||
LT | 21.08.2019 | ||
LV | 21.08.2019 | ||
MC | 21.08.2019 | ||
NL | 21.08.2019 | ||
PL | 21.08.2019 | ||
RO | 21.08.2019 | ||
SE | 21.08.2019 | ||
SI | 21.08.2019 | ||
SK | 21.08.2019 | ||
SM | 21.08.2019 | ||
TR | 21.08.2019 | ||
IE | 11.09.2019 | ||
LU | 11.09.2019 | ||
BE | 30.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
BG | 21.11.2019 | ||
NO | 21.11.2019 | ||
GR | 22.11.2019 | ||
IS | 21.12.2019 | ||
PT | 23.12.2019 | ||
Former [2020/37] | AT | 21.08.2019 | |
CZ | 21.08.2019 | ||
DK | 21.08.2019 | ||
EE | 21.08.2019 | ||
ES | 21.08.2019 | ||
FI | 21.08.2019 | ||
HR | 21.08.2019 | ||
IT | 21.08.2019 | ||
LT | 21.08.2019 | ||
LV | 21.08.2019 | ||
MC | 21.08.2019 | ||
NL | 21.08.2019 | ||
PL | 21.08.2019 | ||
RO | 21.08.2019 | ||
SE | 21.08.2019 | ||
SI | 21.08.2019 | ||
SK | 21.08.2019 | ||
SM | 21.08.2019 | ||
TR | 21.08.2019 | ||
IE | 11.09.2019 | ||
LU | 11.09.2019 | ||
BE | 30.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
BG | 21.11.2019 | ||
NO | 21.11.2019 | ||
GR | 22.11.2019 | ||
IS | 21.12.2019 | ||
PT | 23.12.2019 | ||
Former [2020/36] | AT | 21.08.2019 | |
CZ | 21.08.2019 | ||
DK | 21.08.2019 | ||
EE | 21.08.2019 | ||
ES | 21.08.2019 | ||
FI | 21.08.2019 | ||
HR | 21.08.2019 | ||
IT | 21.08.2019 | ||
LT | 21.08.2019 | ||
LV | 21.08.2019 | ||
MC | 21.08.2019 | ||
NL | 21.08.2019 | ||
PL | 21.08.2019 | ||
RO | 21.08.2019 | ||
SE | 21.08.2019 | ||
SK | 21.08.2019 | ||
SM | 21.08.2019 | ||
TR | 21.08.2019 | ||
IE | 11.09.2019 | ||
LU | 11.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
BG | 21.11.2019 | ||
NO | 21.11.2019 | ||
GR | 22.11.2019 | ||
IS | 21.12.2019 | ||
PT | 23.12.2019 | ||
Former [2020/35] | AT | 21.08.2019 | |
CZ | 21.08.2019 | ||
DK | 21.08.2019 | ||
EE | 21.08.2019 | ||
ES | 21.08.2019 | ||
FI | 21.08.2019 | ||
HR | 21.08.2019 | ||
IT | 21.08.2019 | ||
LT | 21.08.2019 | ||
LV | 21.08.2019 | ||
MC | 21.08.2019 | ||
NL | 21.08.2019 | ||
PL | 21.08.2019 | ||
RO | 21.08.2019 | ||
SE | 21.08.2019 | ||
SK | 21.08.2019 | ||
SM | 21.08.2019 | ||
TR | 21.08.2019 | ||
LU | 11.09.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
BG | 21.11.2019 | ||
NO | 21.11.2019 | ||
GR | 22.11.2019 | ||
PT | 23.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/34] | AT | 21.08.2019 | |
CZ | 21.08.2019 | ||
DK | 21.08.2019 | ||
EE | 21.08.2019 | ||
ES | 21.08.2019 | ||
FI | 21.08.2019 | ||
HR | 21.08.2019 | ||
IT | 21.08.2019 | ||
LT | 21.08.2019 | ||
LV | 21.08.2019 | ||
MC | 21.08.2019 | ||
NL | 21.08.2019 | ||
PL | 21.08.2019 | ||
RO | 21.08.2019 | ||
SE | 21.08.2019 | ||
SK | 21.08.2019 | ||
SM | 21.08.2019 | ||
TR | 21.08.2019 | ||
CH | 30.09.2019 | ||
LI | 30.09.2019 | ||
BG | 21.11.2019 | ||
NO | 21.11.2019 | ||
GR | 22.11.2019 | ||
PT | 23.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/27] | AT | 21.08.2019 | |
CZ | 21.08.2019 | ||
DK | 21.08.2019 | ||
EE | 21.08.2019 | ||
ES | 21.08.2019 | ||
FI | 21.08.2019 | ||
HR | 21.08.2019 | ||
IT | 21.08.2019 | ||
LT | 21.08.2019 | ||
LV | 21.08.2019 | ||
MC | 21.08.2019 | ||
NL | 21.08.2019 | ||
PL | 21.08.2019 | ||
RO | 21.08.2019 | ||
SE | 21.08.2019 | ||
SK | 21.08.2019 | ||
SM | 21.08.2019 | ||
TR | 21.08.2019 | ||
BG | 21.11.2019 | ||
NO | 21.11.2019 | ||
GR | 22.11.2019 | ||
PT | 23.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/25] | AT | 21.08.2019 | |
CZ | 21.08.2019 | ||
DK | 21.08.2019 | ||
EE | 21.08.2019 | ||
ES | 21.08.2019 | ||
FI | 21.08.2019 | ||
HR | 21.08.2019 | ||
IT | 21.08.2019 | ||
LT | 21.08.2019 | ||
LV | 21.08.2019 | ||
NL | 21.08.2019 | ||
PL | 21.08.2019 | ||
RO | 21.08.2019 | ||
SE | 21.08.2019 | ||
SK | 21.08.2019 | ||
TR | 21.08.2019 | ||
BG | 21.11.2019 | ||
NO | 21.11.2019 | ||
GR | 22.11.2019 | ||
PT | 23.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/24] | AT | 21.08.2019 | |
DK | 21.08.2019 | ||
EE | 21.08.2019 | ||
ES | 21.08.2019 | ||
FI | 21.08.2019 | ||
HR | 21.08.2019 | ||
IT | 21.08.2019 | ||
LT | 21.08.2019 | ||
LV | 21.08.2019 | ||
NL | 21.08.2019 | ||
PL | 21.08.2019 | ||
RO | 21.08.2019 | ||
SE | 21.08.2019 | ||
TR | 21.08.2019 | ||
BG | 21.11.2019 | ||
NO | 21.11.2019 | ||
GR | 22.11.2019 | ||
PT | 23.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AT | 21.08.2019 | |
DK | 21.08.2019 | ||
EE | 21.08.2019 | ||
ES | 21.08.2019 | ||
FI | 21.08.2019 | ||
HR | 21.08.2019 | ||
IT | 21.08.2019 | ||
LT | 21.08.2019 | ||
LV | 21.08.2019 | ||
NL | 21.08.2019 | ||
PL | 21.08.2019 | ||
RO | 21.08.2019 | ||
SE | 21.08.2019 | ||
TR | 21.08.2019 | ||
BG | 21.11.2019 | ||
NO | 21.11.2019 | ||
GR | 22.11.2019 | ||
IS | 21.12.2019 | ||
PT | 23.12.2019 | ||
Former [2020/22] | DK | 21.08.2019 | |
EE | 21.08.2019 | ||
ES | 21.08.2019 | ||
FI | 21.08.2019 | ||
HR | 21.08.2019 | ||
LT | 21.08.2019 | ||
LV | 21.08.2019 | ||
NL | 21.08.2019 | ||
SE | 21.08.2019 | ||
TR | 21.08.2019 | ||
BG | 21.11.2019 | ||
NO | 21.11.2019 | ||
GR | 22.11.2019 | ||
IS | 21.12.2019 | ||
PT | 23.12.2019 | ||
Former [2020/17] | ES | 21.08.2019 | |
FI | 21.08.2019 | ||
HR | 21.08.2019 | ||
LT | 21.08.2019 | ||
LV | 21.08.2019 | ||
NL | 21.08.2019 | ||
SE | 21.08.2019 | ||
TR | 21.08.2019 | ||
BG | 21.11.2019 | ||
NO | 21.11.2019 | ||
GR | 22.11.2019 | ||
IS | 21.12.2019 | ||
PT | 23.12.2019 | ||
Former [2020/12] | ES | 21.08.2019 | |
FI | 21.08.2019 | ||
HR | 21.08.2019 | ||
LT | 21.08.2019 | ||
LV | 21.08.2019 | ||
NL | 21.08.2019 | ||
SE | 21.08.2019 | ||
BG | 21.11.2019 | ||
NO | 21.11.2019 | ||
GR | 22.11.2019 | ||
IS | 21.12.2019 | ||
PT | 23.12.2019 | ||
Former [2020/11] | ES | 21.08.2019 | |
FI | 21.08.2019 | ||
HR | 21.08.2019 | ||
LT | 21.08.2019 | ||
LV | 21.08.2019 | ||
NL | 21.08.2019 | ||
SE | 21.08.2019 | ||
BG | 21.11.2019 | ||
NO | 21.11.2019 | ||
GR | 22.11.2019 | ||
PT | 23.12.2019 | ||
Former [2020/10] | FI | 21.08.2019 | |
LT | 21.08.2019 | ||
NL | 21.08.2019 | ||
SE | 21.08.2019 | ||
BG | 21.11.2019 | ||
NO | 21.11.2019 | ||
PT | 23.12.2019 | ||
Former [2020/09] | FI | 21.08.2019 | |
LT | 21.08.2019 | ||
NL | 21.08.2019 | ||
NO | 21.11.2019 | ||
Former [2020/08] | LT | 21.08.2019 | |
NO | 21.11.2019 | Cited in | International search | [XY]DE3140928 (OTTO NIEDUNG KG [DE]) [X] 29-35,39,40,42-45 * page 6 - page 17; figures 1-3 * [Y] 14-18; | [XY]DE19734274 (SIEMENS AG [DE]) [X] 1-5,11-13,28,45 * column 1, line 3 - column 2, line 40 * * column 2, line 57 - column 3, line 17 * * column 3, line 57 - column 7, line 66; figures 1-8; claims 1,6 * [Y] 14-27; | [XY]WO0192921 (BBNT SOLUTIONS LLC [US]) [X] 1,2,4,6-9,13,28,45 * page 4, line 8 - page 9, line 20; figures 1,4-6 * [Y] 14-27; | [XY]US2002114595 (POTASH HANAN [US]) [X] 29-45 * paragraphs [0025] - [0042]; figures 1a-3 * [Y] 14-18; | [XY]US6584252 (SCHIER JOHN E [US], et al) [X] 1,3-11,19,45 * column 1, line 12 - line 47 * * column 2, line 57 - column 4, line 36; figures 1,5,7 * * column 5, line 45 - column 7, line 11 * [Y] 14-18,20-28; | [DY]WO2008009969 (THOMAS ELFED [GB]) [DY] 19-28* the whole document * | Examination | US2003068143 |