blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2399330

EP2399330 - SYSTEM AND INSTALLATION FOR TRANSFERRING ELECTRICAL ENERGY WITHOUT CONTACT [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  16.12.2022
Database last updated on 19.10.2024
FormerRequest for examination was made
Status updated on  09.04.2022
Most recent event   Tooltip16.12.2022Application deemed to be withdrawnpublished on 18.01.2023  [2023/03]
Applicant(s)For all designated states
Numexia SA
Route de Cossonay 36 b
1040 Echallens / CH
[2011/52]
Inventor(s)01 / JUFER, Marcel
Chemin d'Orjuz 6
CH-1110 Morges / CH
 [2011/52]
Representative(s)(deleted)
[2012/15]
Former [2011/52]Micheli & Cie SA
Rue de Genève 122 Case Postale 61
1226 Genève-Thônex / CH
Application number, filing date09785814.620.02.2009
WO2009IB00311
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2010094990
Date:26.08.2010
Language:EN
[2010/34]
Type: A1 Application with search report 
No.:EP2399330
Date:28.12.2011
Language:EN
The application published by WIPO in one of the EPO official languages on 26.08.2010 takes the place of the publication of the European patent application.
[2011/52]
Search report(s)International search report - published on:EP26.08.2010
ClassificationIPC:H02J5/00, B60L11/18, H01F38/14
[2011/52]
CPC:
B60L50/40 (EP,KR,US); H02J50/10 (KR,US); B60L50/51 (EP,KR,US);
B60L53/122 (EP,US); B60L53/126 (KR); H01F27/346 (EP,KR,US);
H01F38/14 (EP,KR,US); H02J50/12 (EP,US); B60L2220/44 (EP,KR,US);
Y02T10/70 (EP,US); Y02T10/7072 (EP,KR,US); Y02T90/12 (US);
Y02T90/14 (EP,KR,US) (-)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2011/52]
Extension statesALNot yet paid
BANot yet paid
RSNot yet paid
TitleGerman:SYSTEM UND ANLAGE ZUR ÜBERTRAGUNG VON ELEKTRISCHER ENERGIE OHNE KONTAKT[2011/52]
English:SYSTEM AND INSTALLATION FOR TRANSFERRING ELECTRICAL ENERGY WITHOUT CONTACT[2011/52]
French:SYSTÈME ET INSTALLATION DE TRANSFERT D'ÉNERGIE ÉLECTRIQUE SANS CONTACT[2011/52]
Entry into regional phase18.08.2011National basic fee paid 
18.08.2011Designation fee(s) paid 
18.08.2011Examination fee paid 
Examination procedure18.08.2011Examination requested  [2011/52]
02.03.2022Application deemed to be withdrawn, date of legal effect  [2023/03]
14.09.2022Despatch of communication that the application is deemed to be withdrawn, reason: renewal fee not paid in time  [2023/03]
Public notification(s)Noting of loss of rights pursuant to Rule 112(1) EPC (EPO Form 2524 dated 21/07/2022)
Numexia SA
Route de Cossonay 36 b
1040 Echallens / CH
[2022/37]
Communication pursuant to Rule 142 EPC (Resumption of proceedings under Rule 142(2) EPC dated 10.03.2021)
Numexia SA
Route de Cossonay 36 b
1040 Echallens / CH
[2021/23]
Fees paidRenewal fee
18.08.2011Renewal fee patent year 03
Penalty fee
Additional fee for renewal fee
01.09.202104   M06   Not yet paid
01.09.202105   M06   Not yet paid
01.09.202106   M06   Not yet paid
01.09.202107   M06   Not yet paid
01.09.202108   M06   Not yet paid
01.09.202109   M06   Not yet paid
01.09.202110   M06   Not yet paid
01.09.202111   M06   Not yet paid
01.09.202112   M06   Not yet paid
01.09.202113   M06   Not yet paid
28.02.202214   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Stay/Interruption25.01.2012Interruption of proceedings. Reason: legal prevention of applicant[2012/12]
01.09.2021Resumption of proceedings[2021/09]
25.01.2012Interruption of proceedings. Reason: legal prevention of applicant[2021/09]
Cited inInternational search[A]US5207304  (LECHNER EDWARD H [US], et al) [A] * the whole document *;
 [A]US5293308  (BOYS JOHN T [NZ], et al) [A] * the whole document *;
 [A]US5654621  (SEELIG ANTON [DE]) [A] * the whole document *;
 [A]US5898579  (BOYS JOHN TALBOT [NZ], et al) [A] * the whole document *;
 [A]WO0054387  (EA TECH LTD [GB], et al) [A] * the whole document *;
 [XY]US6421600  (ROSS HOWARD R [US]) [X] 1,5-7 * column 1, line 20 - line 30; figures 1,2,7c * * column 3, line 53 - column 7, line 15 * * column 9, line 54 - column 17, line 7 * * column 19, line 51 - column 22, line 47 * [Y] 2,3;
 [A]US7116540  (GREEN ANDREW [DE], et al) [A] * the whole document *;
 [Y]US2007252441  (YAMAUCHI YUKINAGA [JP], et al) [Y] 2,3 * paragraphs [0020] - [0029] - [0040] - [0072]; figure 1 *;
 [A]WO2008051611  (FARKAS LASZIO [US]) [A] * the whole document *;
 [X]US7451839  (PERLMAN STEPHEN G [US]) [X] 1,5,6 * column 4, line 35 - column 5, line 20; figure 7 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.