blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2397006

EP2397006 - CONTROLLING ENERGY CONSUMPTION OF A WIRELESS NETWORK NODE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  23.03.2018
Database last updated on 03.08.2024
FormerThe patent has been granted
Status updated on  14.04.2017
FormerGrant of patent is intended
Status updated on  01.12.2016
FormerExamination is in progress
Status updated on  14.11.2016
Most recent event   Tooltip26.06.2020Lapse of the patent in a contracting state
New state(s): CY, MK
published on 29.07.2020  [2020/31]
Applicant(s)For all designated states
Telefonaktiebolaget LM Ericsson (publ)
164 83 Stockholm / SE
[2017/20]
Former [2011/51]For all designated states
Telefonaktiebolaget LM Ericsson (publ)
164 83 Stockholm / SE
Inventor(s)01 / FRENGER, Pål
Tomatvägen 20
S-SE-164 83 Linköping / SE
02 / HAGERMAN, Bo
Hästhagsvägen 7
S-SE-135 52 Tyresö / SE
03 / LINDOFF, Bengt
237 36 Bjärred / SE
04 / PARKVALL, Stefan
113 25 Stockholm / SE
 [2011/51]
Representative(s)Ericsson
Patent Development
Torshamnsgatan 21-23
164 80 Stockholm / SE
[2017/20]
Former [2011/51]Kühn, Friedrich Heinrich
Ericsson AB Patent Unit LTE Torshamnsgatan 23
164 80 Stockholm / SE
Application number, filing date09788488.613.02.2009
[2017/20]
WO2009SE50156
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2010093296
Date:19.08.2010
Language:EN
[2010/33]
Type: A1 Application with search report 
No.:EP2397006
Date:21.12.2011
Language:EN
The application published by WIPO in one of the EPO official languages on 19.08.2010 takes the place of the publication of the European patent application.
[2011/51]
Type: B1 Patent specification 
No.:EP2397006
Date:17.05.2017
Language:EN
[2017/20]
Search report(s)International search report - published on:EP19.08.2010
ClassificationIPC:H04W52/02, H04W52/28, H04W52/34, H04W36/22, H04L29/08, H04W72/04, H04W72/12, H04W88/08
[2016/30]
CPC:
H04W52/0206 (EP,US); H04W52/28 (US); H04L65/40 (US);
H04W52/343 (EP,US); H04W72/0473 (US); H04W72/20 (US);
H04W36/22 (EP,US); H04W88/08 (US); Y02D30/70 (US) (-)
Former IPC [2016/29]H04W36/22, H04L29/08, H04W52/28, H04W72/04, H04W72/12, H04W88/08, H04W52/02, H04W52/34
Former IPC [2011/51]H04W52/34, H04W52/02, H04W40/22
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2011/51]
Extension statesALNot yet paid
BANot yet paid
RSNot yet paid
TitleGerman:STEUERUNG DES ENERGIEVERBRAUCHS EINES DRAHTLOSEN NETZKNOTENS[2011/51]
English:CONTROLLING ENERGY CONSUMPTION OF A WIRELESS NETWORK NODE[2011/51]
French:MAÎTRISE DE CONSOMMATION D'ÉNERGIE D'UN NOEUD DE RÉSEAU SANS FIL[2016/30]
Former [2011/51]MAÎTRISE DE CONSOMMATION D'ÉNERGIE D'UN N UD DE RÉSEAU SANS FIL
Entry into regional phase15.07.2011National basic fee paid 
15.07.2011Designation fee(s) paid 
15.07.2011Examination fee paid 
Examination procedure15.07.2011Amendment by applicant (claims and/or description)
15.07.2011Examination requested  [2011/51]
26.04.2012Despatch of a communication from the examining division (Time limit: M04)
03.07.2012Reply to a communication from the examining division
21.07.2015Despatch of a communication from the examining division (Time limit: M06)
22.01.2016Reply to a communication from the examining division
04.07.2016Communication of intention to grant the patent
08.11.2016Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
02.12.2016Communication of intention to grant the patent
05.04.2017Fee for grant paid
05.04.2017Fee for publishing/printing paid
05.04.2017Receipt of the translation of the claim(s)
Divisional application(s)EP17165037.7  / EP3206443
EP19188081.4  / EP3609246
The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  26.04.2012
Opposition(s)20.02.2018No opposition filed within time limit [2018/17]
Fees paidRenewal fee
25.07.2011Renewal fee patent year 03
24.02.2012Renewal fee patent year 04
27.02.2013Renewal fee patent year 05
27.02.2014Renewal fee patent year 06
26.02.2015Renewal fee patent year 07
26.02.2016Renewal fee patent year 08
27.02.2017Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipAT17.05.2017
CY17.05.2017
DK17.05.2017
EE17.05.2017
FI17.05.2017
HR17.05.2017
LT17.05.2017
LV17.05.2017
MC17.05.2017
MK17.05.2017
PL17.05.2017
PT17.05.2017
SI17.05.2017
SK17.05.2017
BG17.08.2017
NO17.08.2017
GR18.08.2017
IS17.09.2017
LU13.02.2018
MT13.02.2018
[2020/31]
Former [2020/27]AT17.05.2017
DK17.05.2017
EE17.05.2017
FI17.05.2017
HR17.05.2017
LT17.05.2017
LV17.05.2017
MC17.05.2017
PL17.05.2017
PT17.05.2017
SI17.05.2017
SK17.05.2017
BG17.08.2017
NO17.08.2017
GR18.08.2017
IS17.09.2017
LU13.02.2018
MT13.02.2018
Former [2020/08]AT17.05.2017
DK17.05.2017
EE17.05.2017
FI17.05.2017
HR17.05.2017
LT17.05.2017
LV17.05.2017
MC17.05.2017
PL17.05.2017
SI17.05.2017
SK17.05.2017
BG17.08.2017
NO17.08.2017
GR18.08.2017
IS17.09.2017
LU13.02.2018
MT13.02.2018
Former [2018/52]AT17.05.2017
DK17.05.2017
EE17.05.2017
FI17.05.2017
HR17.05.2017
LT17.05.2017
LV17.05.2017
MC17.05.2017
PL17.05.2017
SI17.05.2017
SK17.05.2017
BG17.08.2017
NO17.08.2017
GR18.08.2017
IS17.09.2017
LU13.02.2018
Former [2018/44]AT17.05.2017
DK17.05.2017
EE17.05.2017
FI17.05.2017
HR17.05.2017
LT17.05.2017
LV17.05.2017
MC17.05.2017
PL17.05.2017
SI17.05.2017
SK17.05.2017
BG17.08.2017
NO17.08.2017
GR18.08.2017
IS17.09.2017
Former [2018/25]AT17.05.2017
DK17.05.2017
EE17.05.2017
FI17.05.2017
HR17.05.2017
LT17.05.2017
LV17.05.2017
PL17.05.2017
SI17.05.2017
SK17.05.2017
BG17.08.2017
NO17.08.2017
GR18.08.2017
IS17.09.2017
Former [2018/11]AT17.05.2017
DK17.05.2017
EE17.05.2017
FI17.05.2017
HR17.05.2017
LT17.05.2017
LV17.05.2017
PL17.05.2017
SK17.05.2017
BG17.08.2017
NO17.08.2017
GR18.08.2017
IS17.09.2017
Former [2018/09]AT17.05.2017
DK17.05.2017
EE17.05.2017
FI17.05.2017
HR17.05.2017
LT17.05.2017
LV17.05.2017
PL17.05.2017
BG17.08.2017
NO17.08.2017
GR18.08.2017
IS17.09.2017
Former [2017/50]AT17.05.2017
FI17.05.2017
HR17.05.2017
LT17.05.2017
LV17.05.2017
PL17.05.2017
BG17.08.2017
NO17.08.2017
GR18.08.2017
IS17.09.2017
Former [2017/49]AT17.05.2017
FI17.05.2017
HR17.05.2017
LT17.05.2017
NO17.08.2017
GR18.08.2017
IS17.09.2017
Cited inInternational search[A]WO2006130662  (MILLENNIAL NET INC [US], et al) [A] 1,11,17,19 * abstract * * page 5, line 13 - page 6, line 18 * * page 10, line 3 - line 16 *;
 [A]US2009010190  (GONG XIAOHONG [US]) [A] 1,11,17,19 * abstract ** paragraphs [0038] - [0041] *
ExaminationUS2007066329
by applicantWO2006130662
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.