EP2352859 - PICKLING METHOD AND PICKLING PLANT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.05.2019 Database last updated on 27.07.2024 | |
Former | The patent has been granted Status updated on 25.05.2018 | ||
Former | Grant of patent is intended Status updated on 18.05.2018 | ||
Former | Examination is in progress Status updated on 11.04.2018 | ||
Former | Grant of patent is intended Status updated on 29.11.2017 | Most recent event Tooltip | 03.07.2020 | Lapse of the patent in a contracting state New state(s): CY, MK | published on 05.08.2020 [2020/32] | Applicant(s) | For all designated states König, Thomas Riedholz 31 88167 Maierhöfen / DE | [2011/32] | Inventor(s) | 01 /
see applicant ... | [2011/32] | Representative(s) | Winter, Brandl - Partnerschaft mbB Alois-Steinecker-Straße 22 85354 Freising / DE | [N/P] |
Former [2018/26] | Winter, Brandl, Fürniss, Hübner, Röss, Kaiser, Polte - Partnerschaft mbB Patent- und Rechtsanwaltskanzlei Alois-Steinecker-Strasse 22 85354 Freising / DE | ||
Former [2011/32] | Winter, Brandl, Fürniss, Hübner, Röss, Kaiser, Polte - Partnerschaft Bavariaring 10 80336 München / DE | Application number, filing date | 09796936.4 | 03.11.2009 | [2011/32] | WO2009DE01552 | Priority number, date | DE20081055668 | 03.11.2008 Original published format: DE102008055668 | DE20081063729 | 18.12.2008 Original published format: DE102008063729 | DE20081062970 | 23.12.2008 Original published format: DE102008062970 | [2011/32] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | WO2010060408 | Date: | 03.06.2010 | Language: | DE | [2010/22] | Type: | A2 Application without search report | No.: | EP2352859 | Date: | 10.08.2011 | Language: | DE | The application published by WIPO in one of the EPO official languages on 03.06.2010 takes the place of the publication of the European patent application. | [2011/32] | Type: | B1 Patent specification | No.: | EP2352859 | Date: | 27.06.2018 | Language: | DE | [2018/26] | Search report(s) | International search report - published on: | EP | 07.10.2010 | Classification | IPC: | C23F1/36, C23F1/46, C23G1/22, C23G1/36, C23G3/02, C25D21/14 | [2011/32] | CPC: |
C23F1/36 (EP);
C23F1/46 (EP);
C23G1/22 (EP);
C23G1/36 (EP);
C23G3/027 (EP);
C25D11/16 (EP)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2018/26] |
Former [2011/32] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR | Extension states | AL | Not yet paid | BA | Not yet paid | RS | Not yet paid | Title | German: | BEIZVERFAHREN UND BEIZANLAGE | [2011/32] | English: | PICKLING METHOD AND PICKLING PLANT | [2011/32] | French: | PROCÉDÉ ET INSTALLATION DE DÉCAPAGE | [2011/32] | Entry into regional phase | 03.06.2011 | National basic fee paid | 03.06.2011 | Designation fee(s) paid | 03.06.2011 | Examination fee paid | Examination procedure | 03.06.2011 | Amendment by applicant (claims and/or description) | 03.06.2011 | Examination requested [2011/32] | 29.08.2013 | Despatch of a communication from the examining division (Time limit: M06) | 10.03.2014 | Reply to a communication from the examining division | 03.05.2016 | Despatch of a communication from the examining division (Time limit: M04) | 13.09.2016 | Reply to a communication from the examining division | 06.11.2017 | Cancellation of oral proceeding that was planned for 14.11.2017 | 14.11.2017 | Date of oral proceedings (cancelled) | 30.11.2017 | Communication of intention to grant the patent | 06.04.2018 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 06.04.2018 | Fee for grant paid | 06.04.2018 | Fee for publishing/printing paid | 17.05.2018 | Information about intention to grant a patent | 17.05.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 29.08.2013 | Opposition(s) | 28.03.2019 | No opposition filed within time limit [2019/23] | Fees paid | Renewal fee | 23.11.2011 | Renewal fee patent year 03 | 12.11.2012 | Renewal fee patent year 04 | 20.11.2013 | Renewal fee patent year 05 | 26.11.2014 | Renewal fee patent year 06 | 27.11.2015 | Renewal fee patent year 07 | 24.11.2016 | Renewal fee patent year 08 | 17.11.2017 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 03.11.2009 | CY | 27.06.2018 | CZ | 27.06.2018 | DK | 27.06.2018 | EE | 27.06.2018 | ES | 27.06.2018 | FI | 27.06.2018 | HR | 27.06.2018 | IT | 27.06.2018 | LT | 27.06.2018 | LV | 27.06.2018 | MC | 27.06.2018 | MK | 27.06.2018 | MT | 27.06.2018 | NL | 27.06.2018 | PL | 27.06.2018 | PT | 27.06.2018 | RO | 27.06.2018 | SE | 27.06.2018 | SI | 27.06.2018 | SK | 27.06.2018 | SM | 27.06.2018 | TR | 27.06.2018 | BG | 27.09.2018 | NO | 27.09.2018 | GR | 28.09.2018 | IS | 27.10.2018 | GB | 03.11.2018 | IE | 03.11.2018 | LU | 03.11.2018 | FR | 30.11.2018 | [2020/31] |
Former [2020/30] | HU | 03.11.2009 | |
CZ | 27.06.2018 | ||
DK | 27.06.2018 | ||
EE | 27.06.2018 | ||
ES | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
IT | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
MC | 27.06.2018 | ||
MT | 27.06.2018 | ||
NL | 27.06.2018 | ||
PL | 27.06.2018 | ||
PT | 27.06.2018 | ||
RO | 27.06.2018 | ||
SE | 27.06.2018 | ||
SI | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
TR | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
GB | 03.11.2018 | ||
IE | 03.11.2018 | ||
LU | 03.11.2018 | ||
FR | 30.11.2018 | ||
Former [2020/27] | CZ | 27.06.2018 | |
DK | 27.06.2018 | ||
EE | 27.06.2018 | ||
ES | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
IT | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
MC | 27.06.2018 | ||
MT | 27.06.2018 | ||
NL | 27.06.2018 | ||
PL | 27.06.2018 | ||
PT | 27.06.2018 | ||
RO | 27.06.2018 | ||
SE | 27.06.2018 | ||
SI | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
TR | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
GB | 03.11.2018 | ||
IE | 03.11.2018 | ||
LU | 03.11.2018 | ||
FR | 30.11.2018 | ||
Former [2020/16] | CZ | 27.06.2018 | |
DK | 27.06.2018 | ||
EE | 27.06.2018 | ||
ES | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
IT | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
MC | 27.06.2018 | ||
MT | 27.06.2018 | ||
NL | 27.06.2018 | ||
PL | 27.06.2018 | ||
RO | 27.06.2018 | ||
SE | 27.06.2018 | ||
SI | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
TR | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
GB | 03.11.2018 | ||
IE | 03.11.2018 | ||
LU | 03.11.2018 | ||
FR | 30.11.2018 | ||
Former [2020/08] | CZ | 27.06.2018 | |
DK | 27.06.2018 | ||
EE | 27.06.2018 | ||
ES | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
IT | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
MC | 27.06.2018 | ||
MT | 27.06.2018 | ||
NL | 27.06.2018 | ||
PL | 27.06.2018 | ||
RO | 27.06.2018 | ||
SE | 27.06.2018 | ||
SI | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
GB | 03.11.2018 | ||
IE | 03.11.2018 | ||
LU | 03.11.2018 | ||
FR | 30.11.2018 | ||
Former [2020/03] | CZ | 27.06.2018 | |
DK | 27.06.2018 | ||
EE | 27.06.2018 | ||
ES | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
IT | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
MC | 27.06.2018 | ||
NL | 27.06.2018 | ||
PL | 27.06.2018 | ||
RO | 27.06.2018 | ||
SE | 27.06.2018 | ||
SI | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
GB | 03.11.2018 | ||
IE | 03.11.2018 | ||
LU | 03.11.2018 | ||
FR | 30.11.2018 | ||
Former [2019/49] | CZ | 27.06.2018 | |
DK | 27.06.2018 | ||
EE | 27.06.2018 | ||
ES | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
IT | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
MC | 27.06.2018 | ||
NL | 27.06.2018 | ||
PL | 27.06.2018 | ||
RO | 27.06.2018 | ||
SE | 27.06.2018 | ||
SI | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
IE | 03.11.2018 | ||
LU | 03.11.2018 | ||
FR | 30.11.2018 | ||
Former [2019/48] | CZ | 27.06.2018 | |
DK | 27.06.2018 | ||
EE | 27.06.2018 | ||
ES | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
IT | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
MC | 27.06.2018 | ||
NL | 27.06.2018 | ||
PL | 27.06.2018 | ||
RO | 27.06.2018 | ||
SE | 27.06.2018 | ||
SI | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
IE | 03.11.2018 | ||
LU | 03.11.2018 | ||
Former [2019/37] | CZ | 27.06.2018 | |
DK | 27.06.2018 | ||
EE | 27.06.2018 | ||
ES | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
IT | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
MC | 27.06.2018 | ||
NL | 27.06.2018 | ||
PL | 27.06.2018 | ||
RO | 27.06.2018 | ||
SE | 27.06.2018 | ||
SI | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
LU | 03.11.2018 | ||
Former [2019/34] | CZ | 27.06.2018 | |
DK | 27.06.2018 | ||
EE | 27.06.2018 | ||
ES | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
IT | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
MC | 27.06.2018 | ||
NL | 27.06.2018 | ||
PL | 27.06.2018 | ||
RO | 27.06.2018 | ||
SE | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
LU | 03.11.2018 | ||
Former [2019/33] | CZ | 27.06.2018 | |
DK | 27.06.2018 | ||
EE | 27.06.2018 | ||
ES | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
IT | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
MC | 27.06.2018 | ||
NL | 27.06.2018 | ||
PL | 27.06.2018 | ||
RO | 27.06.2018 | ||
SE | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
Former [2019/26] | CZ | 27.06.2018 | |
DK | 27.06.2018 | ||
EE | 27.06.2018 | ||
ES | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
IT | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
NL | 27.06.2018 | ||
PL | 27.06.2018 | ||
RO | 27.06.2018 | ||
SE | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
Former [2019/12] | CZ | 27.06.2018 | |
EE | 27.06.2018 | ||
ES | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
IT | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
NL | 27.06.2018 | ||
PL | 27.06.2018 | ||
RO | 27.06.2018 | ||
SE | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
Former [2019/11] | CZ | 27.06.2018 | |
EE | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
IT | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
NL | 27.06.2018 | ||
PL | 27.06.2018 | ||
RO | 27.06.2018 | ||
SE | 27.06.2018 | ||
SK | 27.06.2018 | ||
SM | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
Former [2019/10] | CZ | 27.06.2018 | |
EE | 27.06.2018 | ||
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
NL | 27.06.2018 | ||
PL | 27.06.2018 | ||
RO | 27.06.2018 | ||
SE | 27.06.2018 | ||
SK | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
Former [2019/09] | EE | 27.06.2018 | |
FI | 27.06.2018 | ||
HR | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
NL | 27.06.2018 | ||
SE | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
Former [2019/08] | FI | 27.06.2018 | |
HR | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
NL | 27.06.2018 | ||
SE | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
IS | 27.10.2018 | ||
Former [2019/03] | FI | 27.06.2018 | |
HR | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
NL | 27.06.2018 | ||
SE | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
Former [2018/52] | FI | 27.06.2018 | |
HR | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
SE | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
GR | 28.09.2018 | ||
Former [2018/51] | FI | 27.06.2018 | |
HR | 27.06.2018 | ||
LT | 27.06.2018 | ||
LV | 27.06.2018 | ||
SE | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
Former [2018/50] | FI | 27.06.2018 | |
HR | 27.06.2018 | ||
LT | 27.06.2018 | ||
SE | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
Former [2018/49] | FI | 27.06.2018 | |
LT | 27.06.2018 | ||
SE | 27.06.2018 | ||
BG | 27.09.2018 | ||
NO | 27.09.2018 | ||
Former [2018/47] | FI | 27.06.2018 | |
LT | 27.06.2018 | ||
NO | 27.09.2018 | Cited in | International search | [XY]US3607482 (SELM ROBERT P) [X] 1-4,7,9,15,17,18 * the whole document * [Y] 16,23-25; | [XY]US2975041 (HOLMAN EMMETTE R) [X] 1-15,17-22 * the whole document * [Y] 16,23-25; | [Y]US5512129 (BRODALLA DIETER [DE], et al) [Y] 1-25 * the whole document *; | [Y]WO9841672 (DAIMLER BENZ AG [DE], et al) [Y] 1-25 * the whole document *; | [Y]EP0465822 (GRAVER CO [US]) [Y] 1-25 * the whole document *; | [Y]EP1932948 (ITALTECNO S R L [IT]) [Y] 1-25 * the whole document *; | [Y]US3775202 (MEEK J, et al) [Y] 1-25 * the whole document *; | [Y]US2884728 (HOLMAN EMMETTE R) [Y] 1-25 * the whole document *; | [YA]DE19703348 (KLEIN KLAUS DIPL ING [DE]) [Y] 1-16 * the whole document * [A] 17-25; | [Y]WO0194510 (CHURCH & DWIGHT CO INC [US], et al) [Y] 1-16 * the whole document *; | [A]US5647386 (KAISER ROBERT [US]) [A] 1-25 * the whole document *; | [A]WO9518672 (USS POSCO IND [US], et al) [A] 1-25 * the whole document *; | [A]DE4012022 (DÜRR GMBH; MERCEDES-BENZ AG) [A] 1-25 * the whole document *; | [A]WO9424050 (GIULINI CHEMIE [DE], et al) [A] 1-16 * the whole document * | Examination | WO0194510 | DE4008379 | by applicant | DE10054128 | EP0157190 | GB1340505 | DE4015141 |