blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2347226

EP2347226 - VIBRATING ELEMENT APPARATUS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  04.02.2022
Database last updated on 16.07.2024
FormerThe patent has been granted
Status updated on  19.02.2021
FormerGrant of patent is intended
Status updated on  27.10.2020
FormerExamination is in progress
Status updated on  24.11.2017
Most recent event   Tooltip27.04.2024Lapse of the patent in a contracting state
New state(s): MK
published on 29.05.2024  [2024/22]
Applicant(s)For all designated states
Rosemount Tank Radar AB
Box 150
435 23 Mölnlycke / SE
[2021/02]
Former [2020/30]For all designated states
Rosemount Measurement Limited
158 Edinburgh Avenue
Slough
Berkshire SL1 4UE / GB
Former [2011/30]For all designated states
Mobrey Limited
158 Edinburgh Avenue
Slough, Berkshire SL1 4UE / GB
Inventor(s)01 / SEARS, Jeffery, Allan
24 The Pagoda
Maidenhead
Berkshire SL6 8EU / GB
02 / TZEGAZEAB, Tadewos
45 Waterloo Crescent
Wokingham RG40 2JJ / GB
 [2012/33]
Former [2011/30]01 / SEARS, Jeffery, Allan
24 The Pagoda Maidenhead
Berkshire SL6 8EU / GB
02 / TZEGAZEAB, Tadewos
17 Dryden Bracknell
Berkshire RG12 7RQ / GB
Representative(s)Kransell & Wennborg KB
P.O. Box 2096
403 12 Göteborg / SE
[2021/12]
Former [2011/30]Vleck, Jan Montagu
Reddie & Grose 16 Theobalds Road London
WC1X 8PL / GB
Application number, filing date09801545.612.11.2009
[2011/30]
WO2009IB07565
Priority number, dateGB2008002085314.11.2008         Original published format: GB 0820853
[2011/30]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2010055415
Date:20.05.2010
Language:EN
[2010/20]
Type: A1 Application with search report 
No.:EP2347226
Date:27.07.2011
Language:EN
The application published by WIPO in one of the EPO official languages on 20.05.2010 takes the place of the publication of the European patent application.
[2011/30]
Type: B1 Patent specification 
No.:EP2347226
Date:24.03.2021
Language:EN
[2021/12]
Search report(s)International search report - published on:EP20.05.2010
ClassificationIPC:G01F23/296
[2011/30]
CPC:
G01F23/2966 (EP,US); G01F25/20 (EP,US)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   SM,   TR [2021/12]
Former [2011/30]AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  SE,  SI,  SK,  SM,  TR 
Extension statesALNot yet paid
BANot yet paid
RSNot yet paid
TitleGerman:VIBRATIONSELEMENTVORRICHTUNG[2011/30]
English:VIBRATING ELEMENT APPARATUS[2011/30]
French:DISPOSITIF À ÉLÉMENT VIBRANT[2011/30]
Entry into regional phase13.05.2011National basic fee paid 
13.05.2011Designation fee(s) paid 
13.05.2011Examination fee paid 
Examination procedure13.05.2011Examination requested  [2011/30]
22.12.2011Amendment by applicant (claims and/or description)
22.11.2017Despatch of a communication from the examining division (Time limit: M06)
01.06.2018Reply to a communication from the examining division
23.03.2020Despatch of a communication from the examining division (Time limit: M06)
16.09.2020Reply to a communication from the examining division
28.10.2020Communication of intention to grant the patent
10.02.2021Fee for grant paid
10.02.2021Fee for publishing/printing paid
10.02.2021Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  22.11.2017
Opposition(s)04.01.2022No opposition filed within time limit [2022/10]
Fees paidRenewal fee
23.11.2011Renewal fee patent year 03
26.11.2012Renewal fee patent year 04
27.11.2013Renewal fee patent year 05
26.11.2014Renewal fee patent year 06
30.11.2015Renewal fee patent year 07
28.11.2016Renewal fee patent year 08
27.11.2017Renewal fee patent year 09
27.11.2018Renewal fee patent year 10
27.11.2019Renewal fee patent year 11
19.11.2020Renewal fee patent year 12
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU12.11.2009
AT24.03.2021
CY24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
IT24.03.2021
LT24.03.2021
LV24.03.2021
MC24.03.2021
MK24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
SE24.03.2021
SI24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
GB12.11.2021
IE12.11.2021
LU12.11.2021
BE30.11.2021
FR30.11.2021
[2024/22]
Former [2023/27]HU12.11.2009
AT24.03.2021
CY24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
IT24.03.2021
LT24.03.2021
LV24.03.2021
MC24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
SE24.03.2021
SI24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
GB12.11.2021
IE12.11.2021
LU12.11.2021
BE30.11.2021
FR30.11.2021
Former [2023/24]AT24.03.2021
CY24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
IT24.03.2021
LT24.03.2021
LV24.03.2021
MC24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
SE24.03.2021
SI24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
GB12.11.2021
IE12.11.2021
LU12.11.2021
BE30.11.2021
FR30.11.2021
Former [2023/10]AT24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
IT24.03.2021
LT24.03.2021
LV24.03.2021
MC24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
SE24.03.2021
SI24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
GB12.11.2021
IE12.11.2021
LU12.11.2021
BE30.11.2021
FR30.11.2021
Former [2023/01]AT24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
MC24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
SE24.03.2021
SI24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
GB12.11.2021
IE12.11.2021
LU12.11.2021
BE30.11.2021
FR30.11.2021
Former [2022/48]AT24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
MC24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
SE24.03.2021
SI24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
GB12.11.2021
IE12.11.2021
LU12.11.2021
BE30.11.2021
Former [2022/47]AT24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
MC24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
SE24.03.2021
SI24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
GB12.11.2021
LU12.11.2021
BE30.11.2021
Former [2022/34]AT24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
MC24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
SE24.03.2021
SI24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
LU12.11.2021
BE30.11.2021
Former [2022/33]AT24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
MC24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
SE24.03.2021
SI24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
BE30.11.2021
Former [2022/23]AT24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
SE24.03.2021
SI24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
Former [2022/13]AT24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
SE24.03.2021
SI24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
PT26.07.2021
IS23.12.2021
Former [2022/10]AT24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
SE24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
PT26.07.2021
IS23.12.2021
Former [2022/08]AT24.03.2021
CZ24.03.2021
DK24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
SE24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
Former [2021/52]AT24.03.2021
CZ24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
NL24.03.2021
PL24.03.2021
RO24.03.2021
SE24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
Former [2021/51]AT24.03.2021
CZ24.03.2021
EE24.03.2021
ES24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
NL24.03.2021
RO24.03.2021
SE24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
IS24.07.2021
PT26.07.2021
Former [2021/50]AT24.03.2021
CZ24.03.2021
EE24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
NL24.03.2021
RO24.03.2021
SE24.03.2021
SK24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
PT26.07.2021
Former [2021/48]AT24.03.2021
CZ24.03.2021
EE24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
NL24.03.2021
SE24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
Former [2021/46]AT24.03.2021
FI24.03.2021
HR24.03.2021
LT24.03.2021
LV24.03.2021
NL24.03.2021
SE24.03.2021
SM24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
Former [2021/43]FI24.03.2021
HR24.03.2021
LV24.03.2021
NL24.03.2021
SE24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
Former [2021/38]FI24.03.2021
HR24.03.2021
LV24.03.2021
SE24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
Former [2021/36]FI24.03.2021
HR24.03.2021
BG24.06.2021
NO24.06.2021
GR25.06.2021
Former [2021/35]FI24.03.2021
HR24.03.2021
NO24.06.2021
Former [2021/33]FI24.03.2021
NO24.06.2021
Cited inInternational search[I]EP1624291  (GRIESHABER VEGA KG [DE]) [I] 1-14 * paragraph [0040] - paragraph [0044] *;
 [A]DE102006007199  (GRIESHABER VEGA KG [DE]) [A] 1-14;
 [A]DE2144770  (AUTOMATION PROD) [A] 1-14
ExaminationUS6205855
by applicantEP1624291
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.