EP2332171 - PROCESS FOR FABRICATING A SEMICONDUCTOR STRUCTURE WITH A BURIED GROUND PLANE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 07.05.2021 Database last updated on 26.06.2024 | |
Former | The patent has been granted Status updated on 29.05.2020 | ||
Former | Grant of patent is intended Status updated on 27.05.2020 | ||
Former | Examination is in progress Status updated on 09.05.2020 | ||
Former | Grant of patent is intended Status updated on 02.01.2020 | ||
Former | Examination is in progress Status updated on 29.04.2019 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Commissariat à l'Énergie Atomique et aux Énergies Alternatives Bâtiment "Le Ponant D" 25, rue Leblanc 75015 Paris / FR | [2011/24] |
Former [2011/24] | For all designated states Commissariat à l'énergie atomique et aux énergies alternatives Bâtiment "Le Ponant D" 25, rue Leblanc 75015 Paris / FR | Inventor(s) | 01 /
LE TIEC, Yannick 70 chemin des trois Marie F-38920 Crolles / FR | 02 /
ANDRIEU, François 4 rue Jean Macé F-38000 Grenoble / FR | [2011/24] | Representative(s) | Ilgart, Jean-Christophe, et al BREVALEX 95, Rue d'Amsterdam 75378 Paris Cedex 8 / FR | [N/P] |
Former [2020/27] | Ilgart, Jean-Christophe, et al BREVALEX 95, rue d'Amsterdam 75378 Paris Cedex 8 / FR | ||
Former [2011/24] | Ilgart, Jean-Christophe, et al BREVALEX 95 rue d'Amsterdam 75378 Paris Cedex 8 / FR | Application number, filing date | 09806435.5 | 13.08.2009 | [2011/24] | WO2009EP60474 | Priority number, date | FR20080055587 | 14.08.2008 Original published format: FR 0855587 | [2011/24] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2010018204 | Date: | 18.02.2010 | Language: | FR | [2010/07] | Type: | A1 Application with search report | No.: | EP2332171 | Date: | 15.06.2011 | Language: | FR | The application published by WIPO in one of the EPO official languages on 18.02.2010 takes the place of the publication of the European patent application. | [2011/24] | Type: | B1 Patent specification | No.: | EP2332171 | Date: | 01.07.2020 | Language: | FR | [2020/27] | Search report(s) | International search report - published on: | EP | 18.02.2010 | Classification | IPC: | H01L21/762 | [2011/24] | CPC: |
H01L21/76254 (EP,US);
H01L29/1608 (US)
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2020/27] |
Former [2011/24] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR | Title | German: | VERFAHREN ZUR HERSTELLUNG EINER HALBLEITERSTRUKTUR MIT VERGRABENER BODENEBENE | [2011/24] | English: | PROCESS FOR FABRICATING A SEMICONDUCTOR STRUCTURE WITH A BURIED GROUND PLANE | [2011/24] | French: | PROCEDE DE FABRICATION D'UNE STRUCTURE SEMI-CONDUCTRICE PLAN DE MASSE ENTERRE | [2011/24] | Entry into regional phase | 11.02.2011 | National basic fee paid | 11.02.2011 | Designation fee(s) paid | 11.02.2011 | Examination fee paid | Examination procedure | 14.12.2009 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 11.02.2011 | Amendment by applicant (claims and/or description) | 11.02.2011 | Examination requested [2011/24] | 13.09.2011 | Despatch of a communication from the examining division (Time limit: M06) | 16.02.2012 | Reply to a communication from the examining division | 03.05.2019 | Despatch of a communication from the examining division (Time limit: M06) | 21.10.2019 | Reply to a communication from the examining division | 03.01.2020 | Communication of intention to grant the patent | 05.05.2020 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 05.05.2020 | Fee for grant paid | 05.05.2020 | Fee for publishing/printing paid | 27.05.2020 | Information about intention to grant a patent | 27.05.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 13.09.2011 | Opposition(s) | 06.04.2021 | No opposition filed within time limit [2021/23] | Fees paid | Renewal fee | 24.08.2011 | Renewal fee patent year 03 | 19.07.2012 | Renewal fee patent year 04 | 22.07.2013 | Renewal fee patent year 05 | 25.07.2014 | Renewal fee patent year 06 | 24.07.2015 | Renewal fee patent year 07 | 25.07.2016 | Renewal fee patent year 08 | 29.07.2017 | Renewal fee patent year 09 | 30.07.2018 | Renewal fee patent year 10 | 26.07.2019 | Renewal fee patent year 11 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.08.2009 | AT | 01.07.2020 | CY | 01.07.2020 | CZ | 01.07.2020 | DK | 01.07.2020 | EE | 01.07.2020 | ES | 01.07.2020 | FI | 01.07.2020 | HR | 01.07.2020 | IT | 01.07.2020 | LT | 01.07.2020 | LV | 01.07.2020 | MC | 01.07.2020 | MK | 01.07.2020 | MT | 01.07.2020 | NL | 01.07.2020 | PL | 01.07.2020 | RO | 01.07.2020 | SE | 01.07.2020 | SI | 01.07.2020 | SK | 01.07.2020 | SM | 01.07.2020 | TR | 01.07.2020 | IE | 13.08.2020 | LU | 13.08.2020 | BE | 31.08.2020 | CH | 31.08.2020 | LI | 31.08.2020 | BG | 01.10.2020 | NO | 01.10.2020 | GR | 02.10.2020 | IS | 01.11.2020 | PT | 02.11.2020 | [2022/32] |
Former [2022/27] | HU | 13.08.2009 | |
AT | 01.07.2020 | ||
CY | 01.07.2020 | ||
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
MT | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
SE | 01.07.2020 | ||
SI | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
TR | 01.07.2020 | ||
IE | 13.08.2020 | ||
LU | 13.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2022/26] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
SE | 01.07.2020 | ||
SI | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
TR | 01.07.2020 | ||
IE | 13.08.2020 | ||
LU | 13.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/37] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
SE | 01.07.2020 | ||
SI | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
IE | 13.08.2020 | ||
LU | 13.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/36] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
SE | 01.07.2020 | ||
SI | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
LU | 13.08.2020 | ||
BE | 31.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/28] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
SE | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
LU | 13.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/23] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
SE | 01.07.2020 | ||
SM | 01.07.2020 | ||
LU | 13.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/22] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
SE | 01.07.2020 | ||
LU | 13.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/20] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
SE | 01.07.2020 | ||
LU | 13.08.2020 | ||
CH | 31.08.2020 | ||
LI | 31.08.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/18] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/17] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/11] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
PL | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/09] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
LT | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
PT | 02.11.2020 | ||
Former [2021/08] | ES | 01.07.2020 | |
FI | 01.07.2020 | ||
LT | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
PT | 02.11.2020 | ||
Former [2021/07] | FI | 01.07.2020 | |
LT | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
Former [2021/01] | BG | 01.10.2020 | Cited in | International search | [X]US6323108 (KUB FRANCIS J [US], et al) [X] 1,17 * column 5, line 11 - column 7, line 10; figures 1a-1c *; | [A]WO03103026 (LEE TIEN-HSI [US]) [A] 1-19 * page 8, line 5 - page 11, line 29; figures 3,5-9 *; | [A]US2006019465 (GUIDRY CLEAVELIN CLOVES R [US]) [A] 2,3* page 1, paragraph 12; figure 3 *; | [X]FR2898430 (SOITEC SILICON ON INSULATOR [FR]) [X] 1,4,6-10,13-19 * page 10, line 4 - page 12, line 22; figures 4a-4i *; | [A]US2008153313 (KONONCHUK OLEG [FR]) [A] 2,3 * page 3, paragraph 38 - paragraph 40 * | Examination | JPH11111839 |