EP2324922 - PROCESS FOR PREPARING CATALYST [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 07.05.2021 Database last updated on 28.06.2024 | |
Former | The patent has been granted Status updated on 29.05.2020 | ||
Former | Grant of patent is intended Status updated on 25.02.2020 | ||
Former | Examination is in progress Status updated on 27.03.2018 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Kao Corporation 1-14-10, Nihonbashi-Kayabacho Chuo-ku Tokyo 103-8210 / JP | [2011/21] | Inventor(s) | 01 /
SAKAMOTO, Toru c/o Kao Corporation Research Laboratories 1334, Minato Wakayama-shi Wakayama 640-8580 / JP | 02 /
MIMURA, Taku c/o Kao Corporation Research Laboratories 1334, Minato Wakayama-shi Wakayama 640-8580 / JP | [2020/27] |
Former [2011/21] | 01 /
SAKAMOTO, Toru c/o Kao Corporation Research Laboratories 1334 Minato Wakayama-shi Wakayama 640-8580 / JP | ||
02 /
MIMURA, Taku c/o Kao Corporation Research Laboratories 1334 Minato Wakayama-shi Wakayama 640-8580 / JP | Representative(s) | Hoffmann Eitle Patent- und Rechtsanwälte PartmbB Arabellastraße 30 81925 München / DE | [2020/27] |
Former [2011/21] | HOFFMANN EITLE Patent- und Rechtsanwälte Arabellastraße 4 81925 München / DE | Application number, filing date | 09813178.2 | 10.09.2009 | [2011/21] | WO2009JP66201 | Priority number, date | JP20080233587 | 11.09.2008 Original published format: JP 2008233587 | [2011/21] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2010030036 | Date: | 18.03.2010 | Language: | JA | [2010/11] | Type: | A1 Application with search report | No.: | EP2324922 | Date: | 25.05.2011 | Language: | EN | [2011/21] | Type: | B1 Patent specification | No.: | EP2324922 | Date: | 01.07.2020 | Language: | EN | [2020/27] | Search report(s) | International search report - published on: | JP | 18.03.2010 | (Supplementary) European search report - dispatched on: | EP | 10.08.2015 | Classification | IPC: | B01J37/18, B01J23/80, C07C29/149, C07C31/125, C07B61/00, B01J38/58, B01J23/94 | [2015/37] | CPC: |
C07C29/149 (EP,US);
B01J23/002 (EP,US);
B01J23/72 (EP,US);
B01J23/745 (EP,US);
B01J23/80 (EP,US);
B01J23/868 (EP,US);
B01J37/06 (EP,US);
B01J37/16 (EP,US);
B01J37/18 (EP,US);
| C-Set: |
C07C29/149, C07C31/125 (EP,US);
B01J2523/00, B01J2523/17, B01J2523/25, B01J2523/27, B01J2523/47 (US,EP) |
Former IPC [2011/21] | B01J37/18, B01J23/80, C07C29/149, C07C31/125, C07B61/00 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2020/27] |
Former [2011/21] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR | Extension states | AL | Not yet paid | BA | Not yet paid | RS | Not yet paid | Title | German: | VERFAHREN ZUR HERSTELLUNG EINES KATALYSATORS | [2011/21] | English: | PROCESS FOR PREPARING CATALYST | [2011/21] | French: | PROCÉDÉ PERMETTANT DE PRÉPARER UN CATALYSEUR | [2011/21] | Entry into regional phase | 09.03.2011 | Translation filed | 09.03.2011 | National basic fee paid | 09.03.2011 | Search fee paid | 09.03.2011 | Designation fee(s) paid | 09.03.2011 | Examination fee paid | Examination procedure | 09.03.2011 | Examination requested [2011/21] | 22.02.2016 | Amendment by applicant (claims and/or description) | 17.06.2016 | Despatch of a communication from the examining division (Time limit: M04) | 12.07.2016 | Reply to a communication from the examining division | 16.03.2018 | Despatch of a communication from the examining division (Time limit: M04) | 13.06.2018 | Reply to a communication from the examining division | 07.09.2018 | Despatch of a communication from the examining division (Time limit: M04) | 07.01.2019 | Reply to a communication from the examining division | 29.01.2019 | Despatch of a communication from the examining division (Time limit: M04) | 23.05.2019 | Reply to a communication from the examining division | 26.02.2020 | Communication of intention to grant the patent | 25.05.2020 | Fee for grant paid | 25.05.2020 | Fee for publishing/printing paid | 25.05.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 17.06.2016 | Opposition(s) | 06.04.2021 | No opposition filed within time limit [2021/23] | Fees paid | Renewal fee | 27.09.2011 | Renewal fee patent year 03 | 17.09.2012 | Renewal fee patent year 04 | 23.09.2013 | Renewal fee patent year 05 | 12.09.2014 | Renewal fee patent year 06 | 18.09.2015 | Renewal fee patent year 07 | 16.09.2016 | Renewal fee patent year 08 | 25.09.2017 | Renewal fee patent year 09 | 24.09.2018 | Renewal fee patent year 10 | 23.09.2019 | Renewal fee patent year 11 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.09.2009 | AT | 01.07.2020 | CY | 01.07.2020 | CZ | 01.07.2020 | DK | 01.07.2020 | EE | 01.07.2020 | ES | 01.07.2020 | FI | 01.07.2020 | HR | 01.07.2020 | IT | 01.07.2020 | LT | 01.07.2020 | LV | 01.07.2020 | MC | 01.07.2020 | MK | 01.07.2020 | MT | 01.07.2020 | NL | 01.07.2020 | PL | 01.07.2020 | RO | 01.07.2020 | SE | 01.07.2020 | SI | 01.07.2020 | SK | 01.07.2020 | SM | 01.07.2020 | TR | 01.07.2020 | IE | 10.09.2020 | LU | 10.09.2020 | CH | 30.09.2020 | LI | 30.09.2020 | BG | 01.10.2020 | GB | 01.10.2020 | NO | 01.10.2020 | GR | 02.10.2020 | IS | 01.11.2020 | PT | 02.11.2020 | [2022/32] |
Former [2022/27] | HU | 10.09.2009 | |
AT | 01.07.2020 | ||
CY | 01.07.2020 | ||
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
MT | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
SE | 01.07.2020 | ||
SI | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
TR | 01.07.2020 | ||
IE | 10.09.2020 | ||
LU | 10.09.2020 | ||
CH | 30.09.2020 | ||
LI | 30.09.2020 | ||
BG | 01.10.2020 | ||
GB | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2022/26] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
SE | 01.07.2020 | ||
SI | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
TR | 01.07.2020 | ||
IE | 10.09.2020 | ||
LU | 10.09.2020 | ||
CH | 30.09.2020 | ||
LI | 30.09.2020 | ||
BG | 01.10.2020 | ||
GB | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/38] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
SE | 01.07.2020 | ||
SI | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
IE | 10.09.2020 | ||
LU | 10.09.2020 | ||
CH | 30.09.2020 | ||
LI | 30.09.2020 | ||
BG | 01.10.2020 | ||
GB | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/37] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
SE | 01.07.2020 | ||
SI | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
IE | 10.09.2020 | ||
LU | 10.09.2020 | ||
CH | 30.09.2020 | ||
LI | 30.09.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/36] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
SE | 01.07.2020 | ||
SI | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
LU | 10.09.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/28] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
SE | 01.07.2020 | ||
SK | 01.07.2020 | ||
SM | 01.07.2020 | ||
LU | 10.09.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/27] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
SE | 01.07.2020 | ||
SM | 01.07.2020 | ||
LU | 10.09.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/23] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
MC | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
SE | 01.07.2020 | ||
SM | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/22] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
EE | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
RO | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/20] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
DK | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
IT | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/17] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
NL | 01.07.2020 | ||
PL | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/11] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
HR | 01.07.2020 | ||
LT | 01.07.2020 | ||
LV | 01.07.2020 | ||
PL | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
IS | 01.11.2020 | ||
PT | 02.11.2020 | ||
Former [2021/09] | AT | 01.07.2020 | |
CZ | 01.07.2020 | ||
ES | 01.07.2020 | ||
FI | 01.07.2020 | ||
LT | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
GR | 02.10.2020 | ||
PT | 02.11.2020 | ||
Former [2021/08] | ES | 01.07.2020 | |
FI | 01.07.2020 | ||
LT | 01.07.2020 | ||
SE | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
PT | 02.11.2020 | ||
Former [2021/07] | FI | 01.07.2020 | |
LT | 01.07.2020 | ||
BG | 01.10.2020 | ||
NO | 01.10.2020 | ||
Former [2021/01] | BG | 01.10.2020 | Documents cited: | Search | [ ] - No further relevant documents disclosed | International search | [X]US4801574 (BROWN DENNIS M [US], et al); | [X]JPH05177140 (KAO CORP); | [X]JPH05293377 (SUED CHEMIE AG); | [X]JPH10245351 (KAO CORP); | [A]JP2990568B (KAO CORP.); | [A]JP3195357B (KAO CORP.); | [X] - VIJAYARAGHAVAN, P. ET AL., "In-situ activation of methanol synthesis catalyst in a three-phase slurry reactor", FUEL. SCI. TECHNOL. INT., (199607), vol. 14, no. 6, pages 729 - 738, XP008144338 DOI: http://dx.doi.org/10.1080/08843759608947608 | Examination | US5481048 | by applicant | JPS61161146 | JPH05177140 | JP2990568B | JP3195357B |