EP2349538 - ACCELERATED HYDRATE FORMATION AND DISSOCIATION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 30.11.2018 Database last updated on 26.06.2024 | |
Former | The patent has been granted Status updated on 22.12.2017 | ||
Former | Grant of patent is intended Status updated on 22.08.2017 | ||
Former | Examination is in progress Status updated on 06.12.2016 | Most recent event Tooltip | 26.06.2020 | Lapse of the patent in a contracting state New state(s): MK | published on 29.07.2020 [2020/31] | Applicant(s) | For all designated states Gas Sep, LLC 1601 3rd Street S., Suite E St. Petersburg FL 33701 / US | [2015/22] |
Former [2011/31] | For all designated states Water Generating Systems LLC 2001 Jefferson Davis Highway Suite 607 Arlington, VA 22202 / US | Inventor(s) | 01 /
OSEGOVIC, John, P. 3964 Neptune Drive SE St. Petersburg, FL 33705 / US | 02 /
BLAKE COLLINS, Brian 1845 29th Ave. N St. Petersburg, FL 33713 / US | 03 /
MAX, Michael D. 6650 Sunset Way, 303 St. Pete Beach, FL 33706 / US | 04 /
SLATTERY, Ian, M. 49th Ave. N St. Petersburg, FL 33703 / US | [2011/44] |
Former [2011/31] | 01 /
OSEGOVIC, John, P. 3964 Neptune Drive SE St. Petersburg FL 33705 / US | ||
02 /
BLAKE COLLINS, Brian 1845 29th Ave. N St. Petersburg FL 33713 / US | |||
03 /
MAX, Michael D. 6650 Sunset Way, 303 St. Pete Beach FL 33706 / US | |||
04 /
SLATTERY, Ian, M. 49th Ave. N St. Petersburg, FL 33703 / US | Representative(s) | Uexküll & Stolberg Partnerschaft von Patent- und Rechtsanwälten mbB Beselerstraße 4 22607 Hamburg / DE | [2018/04] |
Former [2011/31] | UEXKÜLL & STOLBERG Patentanwälte Beselerstrasse 4 22607 Hamburg / DE | Application number, filing date | 09825322.2 | 04.11.2009 | [2011/31] | WO2009US63212 | Priority number, date | US20080111645P | 05.11.2008 Original published format: US 111645 P | US20090608464 | 29.10.2009 Original published format: US 608464 | [2011/31] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2010053945 | Date: | 14.05.2010 | Language: | EN | [2010/19] | Type: | A2 Application without search report | No.: | EP2349538 | Date: | 03.08.2011 | Language: | EN | The application published by WIPO in one of the EPO official languages on 14.05.2010 takes the place of the publication of the European patent application. | [2011/31] | Type: | B1 Patent specification | No.: | EP2349538 | Date: | 24.01.2018 | Language: | EN | [2018/04] | Search report(s) | International search report - published on: | US | 12.08.2010 | (Supplementary) European search report - dispatched on: | EP | 12.02.2013 | Classification | IPC: | B01D59/26, C10L3/10 | [2013/11] | CPC: |
C10L3/10 (EP,US);
C10L3/102 (EP,US);
C10L3/108 (EP,US)
|
Former IPC [2011/31] | B01D59/26 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2018/04] |
Former [2011/31] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR | Extension states | AL | Not yet paid | BA | Not yet paid | RS | Not yet paid | Title | German: | BESCHLEUNIGTE HYDRATBILDUNG UND -DISSOZIATION | [2011/31] | English: | ACCELERATED HYDRATE FORMATION AND DISSOCIATION | [2011/31] | French: | FORMATION ET DISSOCIATION ACCÉLÉRÉES D'HYDRATE | [2011/31] | Entry into regional phase | 30.05.2011 | National basic fee paid | 30.05.2011 | Search fee paid | 30.05.2011 | Designation fee(s) paid | 30.05.2011 | Examination fee paid | Examination procedure | 30.05.2011 | Examination requested [2011/31] | 16.08.2013 | Amendment by applicant (claims and/or description) | 16.06.2014 | Despatch of a communication from the examining division (Time limit: M06) | 09.12.2014 | Reply to a communication from the examining division | 25.11.2016 | Despatch of a communication from the examining division (Time limit: M06) | 24.05.2017 | Reply to a communication from the examining division | 23.08.2017 | Communication of intention to grant the patent | 11.12.2017 | Fee for grant paid | 11.12.2017 | Fee for publishing/printing paid | 11.12.2017 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 16.06.2014 | Opposition(s) | 25.10.2018 | No opposition filed within time limit [2019/01] | Fees paid | Renewal fee | 14.11.2011 | Renewal fee patent year 03 | 08.05.2013 | Renewal fee patent year 04 | 07.05.2014 | Renewal fee patent year 05 | 10.11.2014 | Renewal fee patent year 06 | 10.11.2015 | Renewal fee patent year 07 | 10.11.2016 | Renewal fee patent year 08 | 13.11.2017 | Renewal fee patent year 09 | Penalty fee | Additional fee for renewal fee | 30.11.2012 | 04   M06   Fee paid on   08.05.2013 | 30.11.2013 | 05   M06   Fee paid on   07.05.2014 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 24.01.2018 | CY | 24.01.2018 | CZ | 24.01.2018 | EE | 24.01.2018 | ES | 24.01.2018 | IT | 24.01.2018 | LT | 24.01.2018 | LV | 24.01.2018 | MC | 24.01.2018 | MK | 24.01.2018 | NL | 24.01.2018 | PL | 24.01.2018 | PT | 24.01.2018 | RO | 24.01.2018 | SE | 24.01.2018 | SK | 24.01.2018 | SM | 24.01.2018 | TR | 24.01.2018 | BG | 24.04.2018 | NO | 24.04.2018 | GR | 25.04.2018 | IS | 24.05.2018 | [2020/31] |
Former [2020/27] | AT | 24.01.2018 | |
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
PT | 24.01.2018 | ||
RO | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
TR | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2020/16] | AT | 24.01.2018 | |
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
TR | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2019/33] | AT | 24.01.2018 | |
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
MC | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/52] | AT | 24.01.2018 | |
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
SM | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/50] | AT | 24.01.2018 | |
CY | 24.01.2018 | ||
CZ | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
SE | 24.01.2018 | ||
SK | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/49] | AT | 24.01.2018 | |
CY | 24.01.2018 | ||
EE | 24.01.2018 | ||
ES | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
RO | 24.01.2018 | ||
SE | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/47] | AT | 24.01.2018 | |
CY | 24.01.2018 | ||
ES | 24.01.2018 | ||
IT | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
SE | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/40] | AT | 24.01.2018 | |
CY | 24.01.2018 | ||
ES | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
SE | 24.01.2018 | ||
BG | 24.04.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/39] | AT | 24.01.2018 | |
CY | 24.01.2018 | ||
ES | 24.01.2018 | ||
LT | 24.01.2018 | ||
LV | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
SE | 24.01.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/38] | AT | 24.01.2018 | |
CY | 24.01.2018 | ||
ES | 24.01.2018 | ||
LT | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
IS | 24.05.2018 | ||
Former [2018/37] | CY | 24.01.2018 | |
ES | 24.01.2018 | ||
LT | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
NO | 24.04.2018 | ||
GR | 25.04.2018 | ||
Former [2018/36] | CY | 24.01.2018 | |
ES | 24.01.2018 | ||
LT | 24.01.2018 | ||
NL | 24.01.2018 | ||
PL | 24.01.2018 | ||
NO | 24.04.2018 | ||
Former [2018/35] | CY | 24.01.2018 | |
LT | 24.01.2018 | ||
NL | 24.01.2018 | ||
NO | 24.04.2018 | ||
Former [2018/34] | LT | 24.01.2018 | |
NL | 24.01.2018 | ||
NO | 24.04.2018 | Documents cited: | Search | [Y]JPH10216505 (HOKURIKU ELECTRIC POWER, et al) [Y] 1-3 * paragraphs [0004] , [0009]; claim - *; | [A]US2006151026 (SINQUIN ANNE [FR], et al) [A] 1-3 * paragraphs [0016] , [0028] *; | [Y]WO2006131738 (UNIV HERIOT WATT [GB], et al) [Y] 1-3 * page 5, paragraph 4 - page 7, line 2 * * page 16, line 2 - page 17, line 2 *; | [XP]EP2031044 (RES INST PETROLEUM INDUSTRY [IR]) [XP] 1-3 * paragraphs [0004] , [0 34] - [0036] - [0058] , [0059]; claim - *; | [E]WO2010018609 (UNIV ROMA [IT], et al) [E] 1-3* the whole document *; | [E]EP2189416 (INST FRANCAIS DU PETROLE [FR]) [E] 1-3 * paragraphs [0024] - [0026] - [0034] , [0037] , [0051] , [0054]; figure 2; example 2 * | International search | [Y]US6767471 (MAX MICHAEL D [US]); | [Y]US2008017078 (BICHLER MANFRED [DE], et al) | by applicant | US5424330 | US6602326 | US6767471 | US6797039 | US6855852 | - GANJI ET AL., "Effect of different surfactants on methane hydrate formation rate, stability and storage capacity", FUEL, (2007), vol. 86, doi:doi:10.1016/j.fuel.2006.07.032, pages 434 - 441, XP005849355 DOI: http://dx.doi.org/10.1016/j.fuel.2006.07.032 | - ROVETTO ET AL., "Is gas hydrate formation thermodynamically promoted by hydrotrope molecules?", FLUID PHASE EQUILBRIA, (2006), vol. 247, no. 1-2, doi:doi:10.1016/j.fluid.2006.06.018, pages 84 - 89, XP024937007 DOI: http://dx.doi.org/10.1016/j.fluid.2006.06.018 | - ZHONG ET AL., "Surfactant effects on gas hydrate formation", CHEM. ENG. SCI., (2000), vol. 55, pages 4177 - 87 | - LEE ET AL., "Methane Hydrate Equilibrium and Formation Kinetics in the Presence of an Anionic Surfactant", J PHYS. CHEM. C, (2007), vol. 111, pages 4734 - 4739 |