EP2356672 - CHEMICAL VAPOR DEPOSITION FLOW INLET ELEMENTS [Right-click to bookmark this link] | |||
Former [2011/33] | CHEMICAL VAPOR DEPOSITION FLOW INLET ELEMENTS AND METHODS | ||
[2018/13] | Status | No opposition filed within time limit Status updated on 19.07.2019 Database last updated on 15.06.2024 | |
Former | The patent has been granted Status updated on 10.08.2018 | ||
Former | Grant of patent is intended Status updated on 25.03.2018 | Most recent event Tooltip | 03.07.2020 | Lapse of the patent in a contracting state New state(s): CY, MK | published on 05.08.2020 [2020/32] | Applicant(s) | For all designated states Veeco Instruments Inc. Terminal Drive Plainview, NY 11803 / US | [2011/33] | Inventor(s) | 01 /
BELOUSOV, Mikhail 16 Gulick Lane Plainsboro NJ 08536 / US | 02 /
MITROVIC, Bojan 57 Freemont Court Somerset NJ 08873 / US | 03 /
MOY, Keng 24 Cedar Creek Drive Basking Ridge NJ 07920 / US | [2011/33] | Representative(s) | Hamer, Christopher K., et al Mathys & Squire The Shard 32 London Bridge Street London SE1 9SG / GB | [N/P] |
Former [2018/37] | Hamer, Christopher K., et al Mathys & Squire LLP The Shard 32 London Bridge Street London SE1 9SG / GB | ||
Former [2011/33] | Hamer, Christopher K., et al Mathys & Squire LLP 120 Holborn London EC1N 2SQ / GB | Application number, filing date | 09831089.9 | 03.12.2009 | [2011/33] | WO2009US66502 | Priority number, date | US20080201074P | 04.12.2008 Original published format: US 201074 P | [2011/33] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | WO2010065695 | Date: | 10.06.2010 | Language: | EN | [2010/23] | Type: | A2 Application without search report | No.: | EP2356672 | Date: | 17.08.2011 | Language: | EN | The application published by WIPO in one of the EPO official languages on 10.06.2010 takes the place of the publication of the European patent application. | [2011/33] | Type: | B1 Patent specification | No.: | EP2356672 | Date: | 12.09.2018 | Language: | EN | [2018/37] | Search report(s) | International search report - published on: | KR | 10.09.2010 | (Supplementary) European search report - dispatched on: | EP | 15.12.2016 | Classification | IPC: | H01L21/205, C23C16/455, C23C16/458 | [2016/39] | CPC: |
C23C16/45574 (EP,KR,US);
C30B25/14 (US);
C23C16/45578 (EP,KR,US);
C23C16/4584 (EP,KR,US)
|
Former IPC [2011/33] | H01L21/205, C23C16/455 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2018/37] |
Former [2011/33] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR | Extension states | AL | Not yet paid | BA | Not yet paid | RS | Not yet paid | Title | German: | STRÖMUNGSEINLASSELEMENTE FÜR CHEMISCHE GASPHASENABSCHEIDUNG | [2018/13] | English: | CHEMICAL VAPOR DEPOSITION FLOW INLET ELEMENTS | [2018/13] | French: | ÉLÉMENTS D'ENTRÉE D'ÉCOULEMENT DE DÉPÔT CHIMIQUE EN PHASE VAPEUR | [2018/13] |
Former [2011/33] | STRÖMUNGSEINLASSELEMENTE UND VERFAHREN FÜR CHEMISCHE GASPHASENABSCHEIDUNG | ||
Former [2011/33] | CHEMICAL VAPOR DEPOSITION FLOW INLET ELEMENTS AND METHODS | ||
Former [2011/33] | ÉLÉMENTS D'ENTRÉE D'ÉCOULEMENT DE DÉPÔT CHIMIQUE EN PHASE VAPEUR ET PROCÉDÉS CORRESPONDANTS | Entry into regional phase | 01.06.2011 | National basic fee paid | 01.06.2011 | Search fee paid | 01.06.2011 | Designation fee(s) paid | 01.06.2011 | Examination fee paid | Examination procedure | 01.06.2011 | Examination requested [2011/33] | 16.02.2017 | Amendment by applicant (claims and/or description) | 26.03.2018 | Communication of intention to grant the patent | 02.08.2018 | Fee for grant paid | 02.08.2018 | Fee for publishing/printing paid | 02.08.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | EP18193544.6 / EP3483919 | EP18193548.7 / EP3471130 | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 26.03.2018 | Opposition(s) | 13.06.2019 | No opposition filed within time limit [2019/34] | Fees paid | Renewal fee | 07.12.2011 | Renewal fee patent year 03 | 07.12.2012 | Renewal fee patent year 04 | 06.12.2013 | Renewal fee patent year 05 | 05.12.2014 | Renewal fee patent year 06 | 07.12.2015 | Renewal fee patent year 07 | 08.12.2016 | Renewal fee patent year 08 | 27.12.2017 | Renewal fee patent year 09 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 03.12.2009 | AT | 12.09.2018 | CY | 12.09.2018 | CZ | 12.09.2018 | DK | 12.09.2018 | EE | 12.09.2018 | ES | 12.09.2018 | FI | 12.09.2018 | HR | 12.09.2018 | IT | 12.09.2018 | LT | 12.09.2018 | LV | 12.09.2018 | MC | 12.09.2018 | MK | 12.09.2018 | NL | 12.09.2018 | PL | 12.09.2018 | RO | 12.09.2018 | SE | 12.09.2018 | SI | 12.09.2018 | SK | 12.09.2018 | SM | 12.09.2018 | TR | 12.09.2018 | LU | 03.12.2018 | MT | 03.12.2018 | BG | 12.12.2018 | NO | 12.12.2018 | GR | 13.12.2018 | BE | 31.12.2018 | CH | 31.12.2018 | LI | 31.12.2018 | IS | 12.01.2019 | PT | 12.01.2019 | [2020/31] |
Former [2020/30] | HU | 03.12.2009 | |
AT | 12.09.2018 | ||
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
TR | 12.09.2018 | ||
LU | 03.12.2018 | ||
MT | 03.12.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
BE | 31.12.2018 | ||
CH | 31.12.2018 | ||
LI | 31.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2020/17] | AT | 12.09.2018 | |
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
TR | 12.09.2018 | ||
LU | 03.12.2018 | ||
MT | 03.12.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
BE | 31.12.2018 | ||
CH | 31.12.2018 | ||
LI | 31.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2020/08] | AT | 12.09.2018 | |
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
LU | 03.12.2018 | ||
MT | 03.12.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
BE | 31.12.2018 | ||
CH | 31.12.2018 | ||
LI | 31.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2020/04] | AT | 12.09.2018 | |
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
LU | 03.12.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
BE | 31.12.2018 | ||
CH | 31.12.2018 | ||
LI | 31.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/51] | AT | 12.09.2018 | |
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
LU | 03.12.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
BE | 31.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/40] | AT | 12.09.2018 | |
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
MC | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
LU | 03.12.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/39] | AT | 12.09.2018 | |
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
LU | 03.12.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/37] | AT | 12.09.2018 | |
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
SE | 12.09.2018 | ||
SI | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/34] | AT | 12.09.2018 | |
CZ | 12.09.2018 | ||
DK | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
SE | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/26] | AT | 12.09.2018 | |
CZ | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
SE | 12.09.2018 | ||
SK | 12.09.2018 | ||
SM | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
PT | 12.01.2019 | ||
Former [2019/23] | AT | 12.09.2018 | |
CZ | 12.09.2018 | ||
EE | 12.09.2018 | ||
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
SE | 12.09.2018 | ||
SK | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
Former [2019/22] | CZ | 12.09.2018 | |
ES | 12.09.2018 | ||
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
PL | 12.09.2018 | ||
RO | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
Former [2019/21] | ES | 12.09.2018 | |
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
IT | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
IS | 12.01.2019 | ||
Former [2019/20] | ES | 12.09.2018 | |
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
NL | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
Former [2019/12] | ES | 12.09.2018 | |
FI | 12.09.2018 | ||
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
LV | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
Former [2019/11] | FI | 12.09.2018 | |
HR | 12.09.2018 | ||
LT | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
Former [2019/10] | FI | 12.09.2018 | |
LT | 12.09.2018 | ||
SE | 12.09.2018 | ||
BG | 12.12.2018 | ||
NO | 12.12.2018 | ||
GR | 13.12.2018 | ||
Former [2019/08] | FI | 12.09.2018 | |
LT | 12.09.2018 | ||
NO | 12.12.2018 | ||
Former [2019/07] | LT | 12.09.2018 | Documents cited: | Search | [XA]US4446815 (KALBSKOPF REINHARD [CH], et al) [X] 6 * column 7 - column 8; figures 2, 3; claim 1 *[A] 7-11; | [X]US2004067641 (YUDOVSKY JOSEPH [US]) [X] 1-5 * the whole document *; | [XA]US2008173735 (MITROVIC BOJAN [US], et al) [X] 12-14 * paragraph [0031] - paragraph [0034]; figures 5, 6; claims 1-5 * * paragraph [0043] * [A] 6-11,15; | [X]US2008182358 (COWDERY-CORVAN PETER J [US], et al) [X] 1-5 * paragraph [0142]; figures 3-4, 19; claims 1, 9 * | International search | [A]US6161500 (KOPACZ STANISLAW [US], et al); | [A]JP2003253431 (ULVAC CORP); | [A]KR20080029198 (LEED CO LTD [KR]) | by applicant | US4446815 | US2004067641 | US2006021574 | US2008173735 | US2008182358 |