EP2385718 - RADIO COMMUNICATION SYSTEM, BASE STATION, MOBILE STATION, RADIO COMMUNICATION METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 13.09.2019 Database last updated on 26.07.2024 | |
Former | The patent has been granted Status updated on 05.10.2018 | ||
Former | Grant of patent is intended Status updated on 20.06.2018 | ||
Former | Examination is in progress Status updated on 06.01.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states Fujitsu Limited 1-1, Kamikodanaka 4-chome Nakahara-ku Kawasaki-shi, Kanagawa 211-8588 / JP | [2018/45] |
Former [2011/45] | For all designated states Fujitsu Limited 1-1, Kamikodanaka 4-chome Nakahara-ku Kawasaki-shi, Kanagawa 211-8588 / JP | Inventor(s) | 01 /
WU, Jianming c/o FUJITSU LIMITED 1-1 Kamikodanaka 4-chome Nakahara-ku Kawasaki-shi Kanagawa 211-8588 / JP | [2011/45] | Representative(s) | Haseltine Lake Kempner LLP Cheapside House 138 Cheapside London EC2V 6BJ / GB | [N/P] |
Former [2018/45] | Haseltine Lake LLP Lincoln House, 5th Floor 300 High Holborn London WC1V 7JH / GB | ||
Former [2011/45] | Stebbing, Timothy Charles Haseltine Lake LLP Lincoln House, 5th Floor 300 High Holborn London WC1V 7JH / GB | Application number, filing date | 09837420.0 | 06.01.2009 | [2018/45] | WO2009JP00021 | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2010079529 | Date: | 15.07.2010 | Language: | JA | [2010/28] | Type: | A1 Application with search report | No.: | EP2385718 | Date: | 09.11.2011 | Language: | EN | [2011/45] | Type: | B1 Patent specification | No.: | EP2385718 | Date: | 07.11.2018 | Language: | EN | [2018/45] | Search report(s) | International search report - published on: | JP | 15.07.2010 | (Supplementary) European search report - dispatched on: | EP | 30.07.2014 | Classification | IPC: | H04W16/28, H04W16/26, H04L1/18, H04L1/00, H04B7/155, H04W72/08, H04W84/04 | [2014/34] | CPC: |
H04B7/15592 (EP,US);
H04B7/14 (KR);
H04W72/542 (EP,US);
H04L1/0002 (EP,US);
H04L1/0009 (EP,US);
H04L1/0033 (EP,US);
H04L1/0041 (EP,US);
H04L1/0076 (EP,US);
H04L27/00 (KR);
|
Former IPC [2011/45] | H04W16/28, H04W16/26 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2018/45] | Extension states | AL | Not yet paid | BA | Not yet paid | RS | Not yet paid | Title | German: | FUNKKOMMUNIKATIONSSYSTEM, BASISSTATION, MOBILSTATION, FUNKKOMMUNIKATIONSVERFAHREN | [2011/45] | English: | RADIO COMMUNICATION SYSTEM, BASE STATION, MOBILE STATION, RADIO COMMUNICATION METHOD | [2011/45] | French: | SYSTÈME DE RADIOCOMMUNICATION, STATION DE BASE, STATION MOBILE, PROCÉDÉ DE RADIOCOMMUNICATION | [2011/45] | Entry into regional phase | 01.07.2011 | Translation filed | 01.08.2011 | National basic fee paid | 01.08.2011 | Search fee paid | 01.08.2011 | Designation fee(s) paid | 01.08.2011 | Examination fee paid | Examination procedure | 01.08.2011 | Examination requested [2011/45] | 12.02.2015 | Amendment by applicant (claims and/or description) | 05.01.2017 | Despatch of a communication from the examining division (Time limit: M04) | 22.03.2017 | Reply to a communication from the examining division | 16.05.2018 | Cancellation of oral proceeding that was planned for 17.05.2018 | 17.05.2018 | Date of oral proceedings (cancelled) | 21.06.2018 | Communication of intention to grant the patent | 28.09.2018 | Fee for grant paid | 28.09.2018 | Fee for publishing/printing paid | 28.09.2018 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 05.01.2017 | Opposition(s) | 08.08.2019 | No opposition filed within time limit [2019/42] | Fees paid | Renewal fee | 01.08.2011 | Renewal fee patent year 03 | 07.11.2011 | Renewal fee patent year 04 | 02.11.2012 | Renewal fee patent year 05 | 04.11.2013 | Renewal fee patent year 06 | 06.11.2014 | Renewal fee patent year 07 | 03.11.2015 | Renewal fee patent year 08 | 03.11.2016 | Renewal fee patent year 09 | 19.12.2017 | Renewal fee patent year 10 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 06.01.2009 | AT | 07.11.2018 | CY | 07.11.2018 | CZ | 07.11.2018 | DK | 07.11.2018 | EE | 07.11.2018 | ES | 07.11.2018 | FI | 07.11.2018 | HR | 07.11.2018 | IT | 07.11.2018 | LT | 07.11.2018 | LV | 07.11.2018 | MC | 07.11.2018 | MK | 07.11.2018 | NL | 07.11.2018 | PL | 07.11.2018 | RO | 07.11.2018 | SE | 07.11.2018 | SI | 07.11.2018 | SK | 07.11.2018 | TR | 07.11.2018 | IE | 06.01.2019 | LU | 06.01.2019 | MT | 06.01.2019 | BE | 31.01.2019 | CH | 31.01.2019 | LI | 31.01.2019 | BG | 07.02.2019 | NO | 07.02.2019 | GR | 08.02.2019 | IS | 07.03.2019 | PT | 07.03.2019 | [2022/31] |
Former [2021/32] | HU | 06.01.2009 | |
AT | 07.11.2018 | ||
CY | 07.11.2018 | ||
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
HR | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
MC | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
SE | 07.11.2018 | ||
SI | 07.11.2018 | ||
SK | 07.11.2018 | ||
TR | 07.11.2018 | ||
IE | 06.01.2019 | ||
LU | 06.01.2019 | ||
MT | 06.01.2019 | ||
BE | 31.01.2019 | ||
CH | 31.01.2019 | ||
LI | 31.01.2019 | ||
BG | 07.02.2019 | ||
NO | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2021/26] | AT | 07.11.2018 | |
CY | 07.11.2018 | ||
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
HR | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
MC | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
SE | 07.11.2018 | ||
SI | 07.11.2018 | ||
SK | 07.11.2018 | ||
TR | 07.11.2018 | ||
IE | 06.01.2019 | ||
LU | 06.01.2019 | ||
MT | 06.01.2019 | ||
BE | 31.01.2019 | ||
CH | 31.01.2019 | ||
LI | 31.01.2019 | ||
BG | 07.02.2019 | ||
NO | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2020/29] | AT | 07.11.2018 | |
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
HR | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
MC | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
SE | 07.11.2018 | ||
SI | 07.11.2018 | ||
SK | 07.11.2018 | ||
TR | 07.11.2018 | ||
IE | 06.01.2019 | ||
LU | 06.01.2019 | ||
MT | 06.01.2019 | ||
BE | 31.01.2019 | ||
CH | 31.01.2019 | ||
LI | 31.01.2019 | ||
BG | 07.02.2019 | ||
NO | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2020/17] | AT | 07.11.2018 | |
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
HR | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
MC | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
SE | 07.11.2018 | ||
SI | 07.11.2018 | ||
SK | 07.11.2018 | ||
TR | 07.11.2018 | ||
IE | 06.01.2019 | ||
LU | 06.01.2019 | ||
BE | 31.01.2019 | ||
CH | 31.01.2019 | ||
LI | 31.01.2019 | ||
BG | 07.02.2019 | ||
NO | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2020/09] | AT | 07.11.2018 | |
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
HR | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
MC | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
SE | 07.11.2018 | ||
SI | 07.11.2018 | ||
SK | 07.11.2018 | ||
IE | 06.01.2019 | ||
LU | 06.01.2019 | ||
BE | 31.01.2019 | ||
CH | 31.01.2019 | ||
LI | 31.01.2019 | ||
BG | 07.02.2019 | ||
NO | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2020/04] | AT | 07.11.2018 | |
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
HR | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
MC | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
SE | 07.11.2018 | ||
SI | 07.11.2018 | ||
SK | 07.11.2018 | ||
LU | 06.01.2019 | ||
BE | 31.01.2019 | ||
CH | 31.01.2019 | ||
LI | 31.01.2019 | ||
BG | 07.02.2019 | ||
NO | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2019/50] | AT | 07.11.2018 | |
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
HR | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
MC | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
SE | 07.11.2018 | ||
SI | 07.11.2018 | ||
SK | 07.11.2018 | ||
LU | 06.01.2019 | ||
BE | 31.01.2019 | ||
BG | 07.02.2019 | ||
NO | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2019/44] | AT | 07.11.2018 | |
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
HR | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
MC | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
SE | 07.11.2018 | ||
SK | 07.11.2018 | ||
LU | 06.01.2019 | ||
BG | 07.02.2019 | ||
NO | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2019/40] | AT | 07.11.2018 | |
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
HR | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
MC | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
SE | 07.11.2018 | ||
SK | 07.11.2018 | ||
BG | 07.02.2019 | ||
NO | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2019/37] | AT | 07.11.2018 | |
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
EE | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
HR | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
RO | 07.11.2018 | ||
SE | 07.11.2018 | ||
BG | 07.02.2019 | ||
NO | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2019/35] | AT | 07.11.2018 | |
CZ | 07.11.2018 | ||
DK | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
HR | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
NL | 07.11.2018 | ||
PL | 07.11.2018 | ||
SE | 07.11.2018 | ||
BG | 07.02.2019 | ||
NO | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2019/34] | AT | 07.11.2018 | |
DK | 07.11.2018 | ||
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
HR | 07.11.2018 | ||
IT | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
NL | 07.11.2018 | ||
SE | 07.11.2018 | ||
BG | 07.02.2019 | ||
NO | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2019/26] | AT | 07.11.2018 | |
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
HR | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
NL | 07.11.2018 | ||
SE | 07.11.2018 | ||
BG | 07.02.2019 | ||
NO | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
PT | 07.03.2019 | ||
Former [2019/24] | AT | 07.11.2018 | |
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
HR | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
NL | 07.11.2018 | ||
SE | 07.11.2018 | ||
BG | 07.02.2019 | ||
NO | 07.02.2019 | ||
GR | 08.02.2019 | ||
IS | 07.03.2019 | ||
Former [2019/23] | AT | 07.11.2018 | |
ES | 07.11.2018 | ||
FI | 07.11.2018 | ||
HR | 07.11.2018 | ||
LT | 07.11.2018 | ||
LV | 07.11.2018 | ||
NL | 07.11.2018 | ||
BG | 07.02.2019 | ||
NO | 07.02.2019 | ||
IS | 07.03.2019 | ||
Former [2019/22] | FI | 07.11.2018 | |
LT | 07.11.2018 | ||
BG | 07.02.2019 | ||
NO | 07.02.2019 | ||
IS | 07.03.2019 | ||
Former [2019/21] | FI | 07.11.2018 | |
LT | 07.11.2018 | ||
NO | 07.02.2019 | ||
IS | 07.03.2019 | ||
Former [2019/20] | LT | 07.11.2018 | |
NO | 07.02.2019 | Documents cited: | Search | [A]WO2007000742 (KONINKL PHILIPS ELECTRONICS NV [NL], et al) [A] 5,6 * the whole document *; | [Y]WO2008108708 (ERICSSON TELEFON AB L M [SE], et al) [Y] 1-4,6-11 * figures 1, 2a * * page 10, line 5 - page 11, line 8 * * page 19, line 20 - line 23 *; | [A]US2008282133 (LO ERNEST SZE YUEN [CN], et al) [A] 1-11 * figure 3 * * paragraph [0028] - paragraph [0037] *; | [Y] - CHRISTOPH HAUSI ET AL, "Joint Network-Channel Coding for the Multiple-Access Relay Channel", 2006 3RD ANNUAL IEEE COMMUNICATIONS SOCIETY CONFERENCE ON SENSOR AND AD HOC COMMUNICATIONS AND NETWORKS - 25 - 28 SEPT. 2006 - RESTON, VA, USA, IEEE, PISCATAWAY, NJ, USA, (20060101), ISBN 978-1-4244-0626-5, pages 817 - 822, XP031012271 [Y] 1-4,6-11 * section III * | [AD] - "Draft IEEE 802.16m Evaluation Methodology Document, IEEE C802.16m-07/080r3", IEEE 802.16 BROADBAND WIRELESS ACCESS WORKING GROUP, (20070828), pages 56 - 79, URL: http://ieee802.org/16/tgm/contrib/C80216m-07_080r3.zip, (20140710), XP002727043 [AD] 1-11 * the whole document * | International search | [A]JP2004064108 (NATL UNIV OF SINGAPORE); | [A]JP2007013345 (SHARP KK); | [A]JP2007214993 (NIPPON TELEGRAPH & TELEPHONE); | [A]JP2008048202 (FUJITSU LTD) | Examination | - RUDOLF AHLSWEDE ET AL, "Network Information Flow", IEEE TRANSACTIONS ON INFORMATION THEORY, IEEE PRESS, USA, (20000701), vol. 46, no. 4, ISSN 0018-9448, XP011027651 | by applicant | - IEEE 802.16 BROADBAND WIRELESS ACCESS WORKING GROUP, (20070828), pages 58 - 60 |