EP2383933 - METHOD FOR HOME GATEWAY MANAGEMENT BY MULTIPLE SERVERS [Right-click to bookmark this link] | |||
Former [2011/44] | METHOD, APPARATUS AND COMMUNICATION SYSTEM FOR TERMINAL MANAGEMENT BY MULTI-SERVERS | ||
[2020/10] | Status | No opposition filed within time limit Status updated on 11.06.2021 Database last updated on 14.06.2024 | |
Former | The patent has been granted Status updated on 03.07.2020 | ||
Former | Grant of patent is intended Status updated on 05.03.2020 | ||
Former | Examination is in progress Status updated on 13.01.2017 | Most recent event Tooltip | 22.07.2022 | Lapse of the patent in a contracting state New state(s): BE | published on 24.08.2022 [2022/34] | Applicant(s) | For all designated states Huawei Device (Shenzhen) Co., Ltd. Building B2 Huawei Industrial Base Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2019/19] |
Former [2011/44] | For all designated states Huawei Device Co., Ltd. Building B2 Huawei Industrial Base Bantian Longgang District Shenzhen Guangdong 518129 / CN | Inventor(s) | 01 /
FANG, Ping Huawei Administration Building Bantian Longgang Shenzhen Guangdong 518129 / CN | 02 /
WU, Huangwei Huawei Administration Building Bantian Longgang Shenzhen Guangdong 518129 / CN | [2011/44] | Representative(s) | Isarpatent Patent- und Rechtsanwälte Barth Charles Hassa Peckmann & Partner mbB Postfach 44 01 51 80750 München / DE | [N/P] |
Former [2020/32] | Isarpatent Patent- und Rechtsanwälte Behnisch Barth Charles Hassa Peckmann & Partner mbB Postfach 44 01 51 80750 München / DE | ||
Former [2012/18] | Isarpatent Patent- und Rechtsanwälte Postfach 44 01 51 80750 München / DE | ||
Former [2011/44] | Charles, Glyndwr, et al Reinhard, Skuhra, Weise & Partner GbR Patent- und Rechtsanwälte Friedrichstrasse 31 80801 München / DE | Application number, filing date | 09838147.8 | 09.12.2009 | [2020/32] | WO2009CN75430 | Priority number, date | CN20091000569 | 15.01.2009 Original published format: CN200910000569 | [2011/44] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2010081360 | Date: | 22.07.2010 | Language: | ZH | [2010/29] | Type: | A1 Application with search report | No.: | EP2383933 | Date: | 02.11.2011 | Language: | EN | [2011/44] | Type: | B1 Patent specification | No.: | EP2383933 | Date: | 05.08.2020 | Language: | EN | [2020/32] | Search report(s) | International search report - published on: | CN | 22.07.2010 | (Supplementary) European search report - dispatched on: | EP | 23.03.2012 | Classification | IPC: | H04L12/24, H04L29/08 | [2020/10] | CPC: |
H04L67/125 (EP,US);
H04L41/00 (EP,US);
H04L41/0806 (EP,US);
H04L67/34 (EP,US);
H04L41/0895 (EP);
H04L41/40 (EP);
|
Former IPC [2012/17] | H04L12/24, H04L12/56, H04L29/08 | ||
Former IPC [2011/44] | H04L12/24, H04L12/56 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2020/32] | Extension states | AL | Not yet paid | BA | Not yet paid | RS | Not yet paid | Title | German: | VERFAHREN FÜR HEIMGATEWAYVERWALTUNG DURCH MEHRERE SERVER | [2020/10] | English: | METHOD FOR HOME GATEWAY MANAGEMENT BY MULTIPLE SERVERS | [2020/10] | French: | PROCÉDÉ DE COMMUNICATION POUR LA GESTION D'UNE PASSERELLE DOMESTIQUE PAR PLUSIEURS SERVEURS | [2020/10] |
Former [2011/44] | VERFAHREN, VORRICHTUNG UND KOMMUNIKATIONSSYSTEM FÜR ENDGERÄTEVERWALTUNG DURCH MULTISERVER | ||
Former [2011/44] | METHOD, APPARATUS AND COMMUNICATION SYSTEM FOR TERMINAL MANAGEMENT BY MULTI-SERVERS | ||
Former [2011/44] | PROCÉDÉ, APPAREIL ET SYSTÈME DE COMMUNICATION POUR GESTION DE TERMINAL PAR SERVEURS MULTIPLES | Entry into regional phase | 27.07.2011 | Translation filed | 27.07.2011 | National basic fee paid | 27.07.2011 | Search fee paid | 27.07.2011 | Designation fee(s) paid | 27.07.2011 | Examination fee paid | Examination procedure | 27.07.2011 | Examination requested [2011/44] | 22.10.2012 | Amendment by applicant (claims and/or description) | 12.09.2016 | Despatch of a communication from the examining division (Time limit: M04) | 11.01.2017 | Reply to a communication from the examining division | 21.02.2019 | Despatch of a communication from the examining division (Time limit: M04) | 27.05.2019 | Reply to a communication from the examining division | 09.12.2019 | Despatch of a communication from the examining division (Time limit: M02) | 21.01.2020 | Reply to a communication from the examining division | 06.03.2020 | Communication of intention to grant the patent | 19.06.2020 | Fee for grant paid | 19.06.2020 | Fee for publishing/printing paid | 29.06.2020 | Receipt of the translation of the claim(s) | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 12.09.2016 | Opposition(s) | 07.05.2021 | No opposition filed within time limit [2021/28] | Fees paid | Renewal fee | 29.12.2011 | Renewal fee patent year 03 | 29.12.2012 | Renewal fee patent year 04 | 30.12.2013 | Renewal fee patent year 05 | 30.12.2014 | Renewal fee patent year 06 | 30.12.2015 | Renewal fee patent year 07 | 30.12.2016 | Renewal fee patent year 08 | 28.12.2017 | Renewal fee patent year 09 | 31.12.2018 | Renewal fee patent year 10 | 30.12.2019 | Renewal fee patent year 11 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 09.12.2009 | AT | 05.08.2020 | CY | 05.08.2020 | CZ | 05.08.2020 | DK | 05.08.2020 | EE | 05.08.2020 | ES | 05.08.2020 | FI | 05.08.2020 | HR | 05.08.2020 | IT | 05.08.2020 | LT | 05.08.2020 | LV | 05.08.2020 | MC | 05.08.2020 | MK | 05.08.2020 | MT | 05.08.2020 | NL | 05.08.2020 | PL | 05.08.2020 | RO | 05.08.2020 | SE | 05.08.2020 | SI | 05.08.2020 | SK | 05.08.2020 | SM | 05.08.2020 | TR | 05.08.2020 | BG | 05.11.2020 | NO | 05.11.2020 | GR | 06.11.2020 | IS | 05.12.2020 | PT | 07.12.2020 | IE | 09.12.2020 | LU | 09.12.2020 | BE | 31.12.2020 | CH | 31.12.2020 | LI | 31.12.2020 | [2022/34] |
Former [2022/32] | HU | 09.12.2009 | |
AT | 05.08.2020 | ||
CY | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
MK | 05.08.2020 | ||
MT | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
TR | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
IE | 09.12.2020 | ||
LU | 09.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
Former [2022/27] | HU | 09.12.2009 | |
AT | 05.08.2020 | ||
CY | 05.08.2020 | ||
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
MT | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
TR | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
IE | 09.12.2020 | ||
LU | 09.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
Former [2022/26] | AT | 05.08.2020 | |
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
TR | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
IE | 09.12.2020 | ||
LU | 09.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
Former [2021/52] | AT | 05.08.2020 | |
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
IE | 09.12.2020 | ||
LU | 09.12.2020 | ||
CH | 31.12.2020 | ||
LI | 31.12.2020 | ||
Former [2021/47] | AT | 05.08.2020 | |
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
IE | 09.12.2020 | ||
LU | 09.12.2020 | ||
Former [2021/46] | AT | 05.08.2020 | |
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
IE | 09.12.2020 | ||
Former [2021/40] | AT | 05.08.2020 | |
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
MC | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/36] | AT | 05.08.2020 | |
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
SE | 05.08.2020 | ||
SI | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/34] | AT | 05.08.2020 | |
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
IT | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
SE | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/28] | AT | 05.08.2020 | |
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
SE | 05.08.2020 | ||
SK | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/23] | AT | 05.08.2020 | |
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
SE | 05.08.2020 | ||
SM | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/22] | AT | 05.08.2020 | |
CZ | 05.08.2020 | ||
DK | 05.08.2020 | ||
EE | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
RO | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/21] | AT | 05.08.2020 | |
DK | 05.08.2020 | ||
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/12] | AT | 05.08.2020 | |
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
NL | 05.08.2020 | ||
PL | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/10] | AT | 05.08.2020 | |
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
HR | 05.08.2020 | ||
LT | 05.08.2020 | ||
LV | 05.08.2020 | ||
PL | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
IS | 05.12.2020 | ||
PT | 07.12.2020 | ||
Former [2021/09] | AT | 05.08.2020 | |
ES | 05.08.2020 | ||
FI | 05.08.2020 | ||
LT | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
GR | 06.11.2020 | ||
PT | 07.12.2020 | ||
Former [2021/08] | ES | 05.08.2020 | |
FI | 05.08.2020 | ||
LT | 05.08.2020 | ||
SE | 05.08.2020 | ||
BG | 05.11.2020 | ||
NO | 05.11.2020 | ||
PT | 07.12.2020 | ||
Former [2021/07] | FI | 05.08.2020 | |
LT | 05.08.2020 | ||
NO | 05.11.2020 | Documents cited: | Search | [A]US2006120305 (VAN DEN BOSCH SVEN JOZEF J [BE], et al) [A] 1-4 * abstract *; | [A]EP1928186 (ALCATEL LUCENT [FR]) [A] 1-4 * abstract * * paragraph [0006] - paragraph [0007] * * paragraph [0012] - paragraph [0017] * * paragraph [0024] - paragraph [0042] *; | [I] - ROYON Y ET AL, "Multiservice home gateways: business model, execution environment, management infrastructure", IEEE COMMUNICATIONS MAGAZINE, IEEE SERVICE CENTER, PISCATAWAY, US, (20071001), vol. 45, no. 10, doi:10.1109/MCOM.2007.4342834, ISSN 0163-6804, pages 122 - 128, XP011193716 [I] 1-4 * the whole document * DOI: http://dx.doi.org/10.1109/MCOM.2007.4342834 | [A] - YVAN ROYON ET AL, Virtualization of Service Gateways in Multi-provider Environments, COMPONENT-BASED SOFTWARE ENGINEERING LECTURE NOTES IN COMPUTER SCIENCE;;LNCS, SPRINGER, BERLIN, DE, PAGE(S) 385 - 392, (20060101), ISBN 978-3-540-35628-8, XP019035604 [A] 1-4 * abstract * * paragraph [0001] * * paragraph [0003] - paragraph [0004] * | [YA] - "TR-069 CPE WAN Management Protocol v1.1 Issue 1 Amentment 2", BROADBAND FORUM TECHNICAL REPORT,, (20071201), no. 1 amendment 2, pages 1 - 138, XP002493850 [Y] 6,7 * paragraph [01.5] * * paragraph [03.1] * * paragraph [3.7.1.5] * * paragraph [A.3.3.1] * [A] 1-4 | [A] - OMA, "OMA Device Management Tree and Description", INTERNET CITATION, (20070209), pages 1 - 47, URL: http://member.openmobilealliance.org/ftp/Public_documents/DM/Permanent_documents/OMA-TS-DM_TND-V1_2-20070209-A.zip, (20110217), XP002624032 [A] 1-7 * paragraph [03.2] * * paragraph [0004] * * paragraph [0005] * * paragraph [06.1] * * paragraph [07.1] - paragraph [07.6] * * paragraph [7.7.1] * | [A] - MARIO IBANEZ ET AL, "Virtualization of Residential Gateways", INTELLIGENT SOLUTIONS IN EMBEDDED SYSTEMS, 2007 FIFTH WORKSHOP ON, IEEE, PI, (20070601), ISBN 978-84-89315-47-1, pages 115 - 125, XP031194315 [A] 1-4 * the whole document * | [XY] - HUSAIN S ET AL, "Remote device management of WiMAX devices in multi-mode multi-access environment", BROADBAND MULTIMEDIA SYSTEMS AND BROADCASTING, 2008 IEEE INTERNATIONAL SYMPOSIUM ON, IEEE, PISCATAWAY, NJ, USA, (20080331), ISBN 978-1-4244-1648-6, pages 1 - 14, XP031268632 [X] 5 * page 1 - page 7 * * CPE; page 10, column l * [Y] 6,7 | International search | [A]US2006120305 (VAN DEN BOSCH SVEN JOZEF J [BE], et al); | [X]CN101127631 (HUAWEI TECH CO LTD [CN]); | [Y]CN101192996 (ALCATEL LUCENT [FR]); | [A]CN101291248 (SHENZHEN HUAWEI COMM TECH CO [CN]) |