blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2417797

EP2417797 - METHOD FOR HANDOVER PROBLEM IDENTIFICATION [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  19.09.2014
Database last updated on 19.10.2024
Most recent event   Tooltip19.09.2014Application deemed to be withdrawnpublished on 22.10.2014  [2014/43]
Applicant(s)For all designated states
Huawei Technologies Co., Ltd.
Huawei Administration Building
Bantian
Longgang District
Shenzhen, Guangdong 518129 / CN
[N/P]
Former [2012/07]For all designated states
Huawei Technologies Co., Ltd.
Huawei Administration Building Bantian Longgang District
Shenzhen, Guangdong 518129 / CN
Inventor(s)01 / LEGG, Peter
Huawei Technologies Co., Ltd.
Intellectual Property department
B1-3, Bantian
Longgang District 518129
Shenzhen / CN
02 / JOHANSSON, Johan
Huawei Technologies Co., Ltd.
Intellectual Property department
B1-3, Bantian
Longgang District 518129
Shenzhen / CN
03 / OLOFSSON, Henrik
Huawei Technologies Co., Ltd.
Intellectual Property department
B1-3, Bantian
Longgang District 518129
Shenzhen / CN
 [2012/07]
Representative(s)Körber, Martin Hans, et al
Mitscherlich PartmbB
Patent- und Rechtsanwälte
Postfach 33 06 09
80066 München / DE
[N/P]
Former [2012/29]Körber, Martin Hans, et al
Mitscherlich & Partner Patent- und Rechtsanwälte Postfach 33 06 09
80066 München / DE
Former [2012/07]Kreuz, Georg Maria, et al
Huawei Technologies Dessauerstrasse 3
80992 Munich / DE
Application number, filing date09843523.321.04.2009
WO2009CN71391
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2010121418
Date:28.10.2010
Language:EN
[2010/43]
Type: A1 Application with search report 
No.:EP2417797
Date:15.02.2012
Language:EN
The application published by WIPO in one of the EPO official languages on 28.10.2010 takes the place of the publication of the European patent application.
[2012/07]
Search report(s)International search report - published on:CN28.10.2010
(Supplementary) European search report - dispatched on:EP30.05.2012
ClassificationIPC:H04W36/24
[2012/26]
CPC:
H04W36/008375 (EP,US)
Former IPC [2012/07]H04W36/00
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   TR [2012/07]
TitleGerman:VERFAHREN ZUR HANDOVER-PROBLEMIDENTIFIKATION[2012/07]
English:METHOD FOR HANDOVER PROBLEM IDENTIFICATION[2012/07]
French:PROCÉDÉ D'IDENTIFICATION DE PROBLÈME DE TRANSFERT INTERCELLULAIRE[2012/07]
Entry into regional phase07.11.2011National basic fee paid 
07.11.2011Search fee paid 
07.11.2011Designation fee(s) paid 
07.11.2011Examination fee paid 
Examination procedure07.11.2011Examination requested  [2012/07]
27.11.2012Amendment by applicant (claims and/or description)
09.01.2014Despatch of a communication from the examining division (Time limit: M04)
20.05.2014Application deemed to be withdrawn, date of legal effect  [2014/43]
17.06.2014Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time  [2014/43]
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  09.01.2014
Fees paidRenewal fee
07.11.2011Renewal fee patent year 03
02.05.2012Renewal fee patent year 04
29.04.2013Renewal fee patent year 05
28.04.2014Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[A]CN1984464  (HUAWEI TECH CO LTD [CN]) [A] 1-18 * abstract * * figures 1-4 *;
 [X]US2008020770  (HOFMANN DIRK [DE]) [X] 1-18 * abstract * * paragraphs [0041] - [0057] * * figures 3,4 *;
 [A]WO2008040503  (MATSUSHITA ELECTRIC IND CO LTD [JP], et al) [A] 12 * page 23, lines 5-10 * * figures 8,9 *;
 [A]US2008247362  (EBATA KOICHI [JP]) [A] 1-18 * paragraphs [0008] , [0013] - [0015] - [0026] - [0030] - [0 39] - [0045] *;
 [A]WO2009041498  (NEC CORP [JP], et al) [A] 3 * paragraphs [0104] , [ 109] * * figures 15,17 *;
 US2010208707  [ ] (HAMABE KOJIRO [JP], et al);
 [X]  - CATT, "UE measurements and logs for Mobility Robustness Optimisation", 3GPP DRAFT; R3-090912, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20090318), no. Seoul, Korea; 20090318, XP050341280 [X] 1-18 * chapter 4 * * chapters 2 and 3 *
 [A]  - HUAWEI, "Miscellaneous clarifications for measurement", 3GPP DRAFT; R2-086677, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20081104), no. Prague, Czech Republic; 20081104, XP050321555 [A] 3-5,13 * chapter 3 * * page 3, paragraph l *
 [A]  - PANASONIC, "Dedicated L1 resource usage after handover", 3GPP DRAFT; R2-083304_L1_RESOURCE_AFTER_HANDOVER, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20080624), vol. RAN WG2, no. Warsaw, Poland; 20080624, XP050140717 [A] 3-5,13 * chapter 2.1, 3 *
 [A]  - HUAWEI, "Addressing the requirements for HO optimisation", 3GPP DRAFT; S5-081672 ADDRESSING THE REQUIREMENTS FOR HO OPTIMISATION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20081006), no. Dalian, China; 20081006, XP050335753 [A] 1,2,6-10,15-18 * chapters 3.2 - 4.3.1.1 *
 [A]  - Qualcomm, "Performance Measurements for Handover Parameter Optimisation", 3GPP TSG-SA5 (Telecom Management) Meeting SA5#60, 7 - 11 July 2008, Sophia Antipolis, France, (20080701), pages 1 - 11, URL: http://www.3gpp.org/ftp/tsg_sa/wg5_tm/TSGS5_60/Docs/S5-081092.zip, (20120516), XP002676125 [A] 1,2,6-10,15-18 * chapters 3.1 - 3.3.3 * * chapters 4.1.1 - 4.4 *
 [A]  - QUALCOMM ET AL, "Scenarios and Requirements for HO Parameter Optimisation Function", 3GPP DRAFT; S5-081542 SCENARIOS AND REQUIREMENTS FOR HO PARAMETER OPTIMISATION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20081006), no. Dalian, China; 20081006, XP050335651 [A] 1,2,6-10,15-18 * chapter 3 *
 [A]  - HUAWEI, "Intra-frequency Handover Measurements", 3GPP DRAFT; S5-080659 INTRA-FREQUENCY HANDOVER MEASUREMENTS, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20080413), vol. SA WG5, no. Chengdu, China; 20080413, XP050307263 [A] 1,2,6-10,15-18 * chapter 3 *
 [A]  - HUAWEI, "Mobility Robustness Optimisation", 3GPP DRAFT; R3-080754_MOBILITY_ROBUSTNESS, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20080326), vol. RAN WG3, no. Shenzhen, China; 20080326, XP050163962 [A] 1,2,6-10,15-18 * chapter 2-4 *
 [A]  - T-MOBILE, "Impact of Self-configuration and self-optimisation functionality on architecture & interfaces", 3GPP DRAFT; R3-061488, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20061005), vol. RAN WG3, no. Seoul, Korea; 20061005, XP050160375 [A] 1,6-10,13,15-18 * chapter 2 *
 [A]  - NTT DOCOMO ET AL, "Clarification of work split on eNB measurements", 3GPP DRAFT; R3-071258 ENB MEASUREMENTS WAY FORWARD, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20070608), vol. TSG CN, no. Sophia; 20070608, XP050020546 [A] 1,6-10,13,15-18 * chapter 3 *
 [A]  - QUALCOMM ET AL, "Performance Measurements for Intra-frequency Handover Monitoring", 3GPP DRAFT; S5-081934_REVMARKS, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20081017), no. Dalian, China; 20081017, XP050335948 [A] 1-3,12-14,18 * chapter 4 *
 [A]  - SAMSUNG, "Add functions to detect too early too later HO", 3GPP DRAFT; R3-092074 CR TOO EARLY TOO LATE HO DETECTION, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20090324), no. Shenzhen, China; 20090824, XP050391625 [A] 1-18 * title, chapter 10.1.2.1, 20.2.2.x *
International search[A]CN1984464  (HUAWEI TECH CO LTD [CN]);
 [X]US2008020770  (HOFMANN DIRK [DE]);
 [A]US2008247362  (EBATA KOICHI [JP])
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.