EP2452795 - FILLER AGENT/GLASS CONTAINING RESIN MOLDED PRODUCTAND USE THEREOF [Right-click to bookmark this link] | |||
Former [2012/20] | MOLDED RESIN CONTAINING FILLER AND GLASS | ||
[2013/25] | Status | No opposition filed within time limit Status updated on 03.10.2014 Database last updated on 21.05.2024 | Most recent event Tooltip | 22.06.2018 | Lapse of the patent in a contracting state New state(s): MK | published on 25.07.2018 [2018/30] | Applicant(s) | For all designated states Nakamura, Kenji Taiki Awaji Factory 3-41, Nishi Awaji 6-chome Higashi Yodogawa-ku Osaka-shi, Osaka 533-0031 / JP | [2013/48] |
Former [2012/20] | For all designated states Nakamura, Kenji Taiki Awaji Factory 3-41, Nishi Awaji 6-chome Higashi Yodogawa-ku Osaka-shi, Osaka 533-0031 / JP | Inventor(s) | 01 /
see applicant ... | [2012/20] | Representative(s) | Kling, Simone Lavoix Munich Bayerstrasse 83 80335 München / DE | [2013/48] |
Former [2012/20] | Kling, Simone Lavoix Munich Bayerstrasse 85a 80335 München / DE | Application number, filing date | 09848059.3 | 07.08.2009 | WO2009JP63987 | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2011016127 | Date: | 10.02.2011 | Language: | JA | [2011/06] | Type: | A1 Application with search report | No.: | EP2452795 | Date: | 16.05.2012 | Language: | EN | [2012/20] | Type: | B1 Patent specification | No.: | EP2452795 | Date: | 27.11.2013 | Language: | EN | [2013/48] | Search report(s) | International search report - published on: | JP | 10.02.2011 | (Supplementary) European search report - dispatched on: | EP | 23.04.2012 | Classification | IPC: | B29B11/16, C08K7/20, C08L101/00 | [2012/20] | CPC: |
B29C48/10 (EP,US);
B29B11/16 (KR);
C08K7/20 (KR);
C08L101/00 (KR);
B29C48/022 (EP,US);
B29C49/0005 (EP,US);
B29K2023/06 (EP,US);
B29K2023/12 (EP,US);
B29K2067/00 (EP,US);
B29K2077/00 (EP,US);
B29K2105/16 (EP,US);
Y10T428/2991 (EP,US);
| Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, SE, SI, SK, SM, TR [2012/20] | Extension states | AL | Not yet paid | BA | Not yet paid | RS | Not yet paid | Title | German: | GEFORMTES HARZ MIT EINEM FÜLLER UND GLAS UND SEINE VERWENDUNG | [2013/25] | English: | FILLER AGENT/GLASS CONTAINING RESIN MOLDED PRODUCTAND USE THEREOF | [2013/25] | French: | RÉSINE MOULÉE CONTENANT UNE CHARGE ET DU VERRE ET UTILISATION DE CELLE-CI | [2013/25] |
Former [2012/20] | GEFORMTES HARZ MIT EINEM FÜLLER UND GLAS | ||
Former [2012/20] | MOLDED RESIN CONTAINING FILLER AND GLASS | ||
Former [2012/20] | RÉSINE MOULÉE CONTENANT UNE CHARGE ET DU VERRE | Entry into regional phase | 06.02.2012 | Translation filed | 06.02.2012 | National basic fee paid | 06.02.2012 | Search fee paid | 06.02.2012 | Designation fee(s) paid | 06.02.2012 | Examination fee paid | Examination procedure | 06.02.2012 | Examination requested [2012/20] | 21.11.2012 | Amendment by applicant (claims and/or description) | 15.01.2013 | Despatch of a communication from the examining division (Time limit: M04) | 29.01.2013 | Reply to a communication from the examining division | 26.02.2013 | Despatch of a communication from the examining division (Time limit: M04) | 29.04.2013 | Reply to a communication from the examining division | 03.06.2013 | Communication of intention to grant the patent | 25.09.2013 | Fee for grant paid | 25.09.2013 | Fee for publishing/printing paid | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is 15.01.2013 | Opposition(s) | 28.08.2014 | No opposition filed within time limit [2014/45] | Fees paid | Renewal fee | 06.02.2012 | Renewal fee patent year 03 | 10.08.2012 | Renewal fee patent year 04 | 19.08.2013 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 07.08.2009 | AT | 27.11.2013 | BE | 27.11.2013 | BG | 27.11.2013 | CY | 27.11.2013 | CZ | 27.11.2013 | DK | 27.11.2013 | EE | 27.11.2013 | FI | 27.11.2013 | HR | 27.11.2013 | LT | 27.11.2013 | LV | 27.11.2013 | MC | 27.11.2013 | MK | 27.11.2013 | MT | 27.11.2013 | NL | 27.11.2013 | PL | 27.11.2013 | RO | 27.11.2013 | SE | 27.11.2013 | SI | 27.11.2013 | SK | 27.11.2013 | SM | 27.11.2013 | TR | 27.11.2013 | NO | 27.02.2014 | GR | 28.02.2014 | IS | 27.03.2014 | PT | 27.03.2014 | IE | 07.08.2014 | LU | 07.08.2014 | [2018/30] |
Former [2016/33] | HU | 07.08.2009 | |
AT | 27.11.2013 | ||
BE | 27.11.2013 | ||
BG | 27.11.2013 | ||
CY | 27.11.2013 | ||
CZ | 27.11.2013 | ||
DK | 27.11.2013 | ||
EE | 27.11.2013 | ||
FI | 27.11.2013 | ||
HR | 27.11.2013 | ||
LT | 27.11.2013 | ||
LV | 27.11.2013 | ||
MC | 27.11.2013 | ||
MT | 27.11.2013 | ||
NL | 27.11.2013 | ||
PL | 27.11.2013 | ||
RO | 27.11.2013 | ||
SE | 27.11.2013 | ||
SI | 27.11.2013 | ||
SK | 27.11.2013 | ||
SM | 27.11.2013 | ||
TR | 27.11.2013 | ||
NO | 27.02.2014 | ||
GR | 28.02.2014 | ||
IS | 27.03.2014 | ||
PT | 27.03.2014 | ||
IE | 07.08.2014 | ||
LU | 07.08.2014 | ||
Former [2016/32] | HU | 07.08.2009 | |
AT | 27.11.2013 | ||
BE | 27.11.2013 | ||
BG | 27.11.2013 | ||
CY | 27.11.2013 | ||
CZ | 27.11.2013 | ||
DK | 27.11.2013 | ||
EE | 27.11.2013 | ||
FI | 27.11.2013 | ||
HR | 27.11.2013 | ||
LT | 27.11.2013 | ||
LV | 27.11.2013 | ||
MC | 27.11.2013 | ||
MT | 27.11.2013 | ||
NL | 27.11.2013 | ||
PL | 27.11.2013 | ||
RO | 27.11.2013 | ||
SE | 27.11.2013 | ||
SI | 27.11.2013 | ||
SK | 27.11.2013 | ||
SM | 27.11.2013 | ||
NO | 27.02.2014 | ||
GR | 28.02.2014 | ||
IS | 27.03.2014 | ||
PT | 27.03.2014 | ||
IE | 07.08.2014 | ||
LU | 07.08.2014 | ||
Former [2016/28] | AT | 27.11.2013 | |
BE | 27.11.2013 | ||
BG | 27.11.2013 | ||
CY | 27.11.2013 | ||
CZ | 27.11.2013 | ||
DK | 27.11.2013 | ||
EE | 27.11.2013 | ||
FI | 27.11.2013 | ||
HR | 27.11.2013 | ||
LT | 27.11.2013 | ||
LV | 27.11.2013 | ||
MC | 27.11.2013 | ||
MT | 27.11.2013 | ||
NL | 27.11.2013 | ||
PL | 27.11.2013 | ||
RO | 27.11.2013 | ||
SE | 27.11.2013 | ||
SI | 27.11.2013 | ||
SK | 27.11.2013 | ||
SM | 27.11.2013 | ||
NO | 27.02.2014 | ||
GR | 28.02.2014 | ||
IS | 27.03.2014 | ||
PT | 27.03.2014 | ||
IE | 07.08.2014 | ||
LU | 07.08.2014 | ||
Former [2016/22] | AT | 27.11.2013 | |
BE | 27.11.2013 | ||
CY | 27.11.2013 | ||
CZ | 27.11.2013 | ||
DK | 27.11.2013 | ||
EE | 27.11.2013 | ||
FI | 27.11.2013 | ||
HR | 27.11.2013 | ||
LT | 27.11.2013 | ||
LV | 27.11.2013 | ||
MC | 27.11.2013 | ||
NL | 27.11.2013 | ||
PL | 27.11.2013 | ||
RO | 27.11.2013 | ||
SE | 27.11.2013 | ||
SI | 27.11.2013 | ||
SK | 27.11.2013 | ||
SM | 27.11.2013 | ||
NO | 27.02.2014 | ||
IS | 27.03.2014 | ||
PT | 27.03.2014 | ||
IE | 07.08.2014 | ||
LU | 07.08.2014 | ||
Former [2015/37] | AT | 27.11.2013 | |
BE | 27.11.2013 | ||
CY | 27.11.2013 | ||
CZ | 27.11.2013 | ||
DK | 27.11.2013 | ||
EE | 27.11.2013 | ||
FI | 27.11.2013 | ||
HR | 27.11.2013 | ||
LT | 27.11.2013 | ||
LV | 27.11.2013 | ||
MC | 27.11.2013 | ||
NL | 27.11.2013 | ||
PL | 27.11.2013 | ||
RO | 27.11.2013 | ||
SE | 27.11.2013 | ||
SI | 27.11.2013 | ||
SK | 27.11.2013 | ||
NO | 27.02.2014 | ||
IS | 27.03.2014 | ||
PT | 27.03.2014 | ||
IE | 07.08.2014 | ||
LU | 07.08.2014 | ||
Former [2015/19] | AT | 27.11.2013 | |
BE | 27.11.2013 | ||
CY | 27.11.2013 | ||
CZ | 27.11.2013 | ||
DK | 27.11.2013 | ||
EE | 27.11.2013 | ||
FI | 27.11.2013 | ||
HR | 27.11.2013 | ||
LT | 27.11.2013 | ||
LV | 27.11.2013 | ||
MC | 27.11.2013 | ||
NL | 27.11.2013 | ||
PL | 27.11.2013 | ||
RO | 27.11.2013 | ||
SE | 27.11.2013 | ||
SI | 27.11.2013 | ||
SK | 27.11.2013 | ||
NO | 27.02.2014 | ||
IS | 27.03.2014 | ||
PT | 27.03.2014 | ||
LU | 07.08.2014 | ||
Former [2015/18] | AT | 27.11.2013 | |
BE | 27.11.2013 | ||
CY | 27.11.2013 | ||
CZ | 27.11.2013 | ||
DK | 27.11.2013 | ||
EE | 27.11.2013 | ||
FI | 27.11.2013 | ||
HR | 27.11.2013 | ||
LT | 27.11.2013 | ||
LV | 27.11.2013 | ||
MC | 27.11.2013 | ||
NL | 27.11.2013 | ||
PL | 27.11.2013 | ||
RO | 27.11.2013 | ||
SE | 27.11.2013 | ||
SI | 27.11.2013 | ||
SK | 27.11.2013 | ||
NO | 27.02.2014 | ||
IS | 27.03.2014 | ||
PT | 27.03.2014 | ||
Former [2015/14] | AT | 27.11.2013 | |
BE | 27.11.2013 | ||
CY | 27.11.2013 | ||
CZ | 27.11.2013 | ||
DK | 27.11.2013 | ||
EE | 27.11.2013 | ||
FI | 27.11.2013 | ||
HR | 27.11.2013 | ||
LT | 27.11.2013 | ||
LV | 27.11.2013 | ||
NL | 27.11.2013 | ||
PL | 27.11.2013 | ||
RO | 27.11.2013 | ||
SE | 27.11.2013 | ||
SI | 27.11.2013 | ||
SK | 27.11.2013 | ||
NO | 27.02.2014 | ||
IS | 27.03.2014 | ||
PT | 27.03.2014 | ||
Former [2014/41] | AT | 27.11.2013 | |
BE | 27.11.2013 | ||
CY | 27.11.2013 | ||
CZ | 27.11.2013 | ||
DK | 27.11.2013 | ||
EE | 27.11.2013 | ||
FI | 27.11.2013 | ||
HR | 27.11.2013 | ||
LT | 27.11.2013 | ||
LV | 27.11.2013 | ||
NL | 27.11.2013 | ||
PL | 27.11.2013 | ||
RO | 27.11.2013 | ||
SE | 27.11.2013 | ||
SK | 27.11.2013 | ||
NO | 27.02.2014 | ||
IS | 27.03.2014 | ||
PT | 27.03.2014 | ||
Former [2014/37] | AT | 27.11.2013 | |
BE | 27.11.2013 | ||
CY | 27.11.2013 | ||
CZ | 27.11.2013 | ||
EE | 27.11.2013 | ||
FI | 27.11.2013 | ||
HR | 27.11.2013 | ||
LT | 27.11.2013 | ||
LV | 27.11.2013 | ||
NL | 27.11.2013 | ||
PL | 27.11.2013 | ||
RO | 27.11.2013 | ||
SE | 27.11.2013 | ||
SK | 27.11.2013 | ||
NO | 27.02.2014 | ||
IS | 27.03.2014 | ||
PT | 27.03.2014 | ||
Former [2014/36] | AT | 27.11.2013 | |
BE | 27.11.2013 | ||
CY | 27.11.2013 | ||
EE | 27.11.2013 | ||
FI | 27.11.2013 | ||
HR | 27.11.2013 | ||
LT | 27.11.2013 | ||
LV | 27.11.2013 | ||
NL | 27.11.2013 | ||
SE | 27.11.2013 | ||
NO | 27.02.2014 | ||
IS | 27.03.2014 | ||
PT | 27.03.2014 | ||
Former [2014/28] | AT | 27.11.2013 | |
BE | 27.11.2013 | ||
CY | 27.11.2013 | ||
FI | 27.11.2013 | ||
HR | 27.11.2013 | ||
LT | 27.11.2013 | ||
LV | 27.11.2013 | ||
NL | 27.11.2013 | ||
SE | 27.11.2013 | ||
NO | 27.02.2014 | ||
IS | 27.03.2014 | ||
PT | 27.03.2014 | ||
Former [2014/26] | AT | 27.11.2013 | |
BE | 27.11.2013 | ||
CY | 27.11.2013 | ||
FI | 27.11.2013 | ||
HR | 27.11.2013 | ||
LT | 27.11.2013 | ||
LV | 27.11.2013 | ||
NL | 27.11.2013 | ||
SE | 27.11.2013 | ||
NO | 27.02.2014 | ||
IS | 27.03.2014 | ||
Former [2014/25] | AT | 27.11.2013 | |
FI | 27.11.2013 | ||
HR | 27.11.2013 | ||
LT | 27.11.2013 | ||
LV | 27.11.2013 | ||
NL | 27.11.2013 | ||
SE | 27.11.2013 | ||
NO | 27.02.2014 | ||
IS | 27.03.2014 | ||
Former [2014/24] | AT | 27.11.2013 | |
FI | 27.11.2013 | ||
HR | 27.11.2013 | ||
LT | 27.11.2013 | ||
NL | 27.11.2013 | ||
SE | 27.11.2013 | ||
NO | 27.02.2014 | ||
IS | 27.03.2014 | ||
Former [2014/23] | FI | 27.11.2013 | |
HR | 27.11.2013 | ||
LT | 27.11.2013 | ||
NL | 27.11.2013 | ||
SE | 27.11.2013 | ||
NO | 27.02.2014 | ||
IS | 27.03.2014 | ||
Former [2014/22] | FI | 27.11.2013 | |
LT | 27.11.2013 | ||
NL | 27.11.2013 | ||
SE | 27.11.2013 | ||
NO | 27.02.2014 | ||
Former [2014/20] | LT | 27.11.2013 | |
NO | 27.02.2014 | Documents cited: | Search | [A]US5091457 (EFNER HOWARD F [US]) [A] 1-11 * column 4, line 40 - column 5, line 11; claims 1,2; table 3 *; | [A]US6410633 (HIKATA HAJIME [JP], et al) [A] 1-11 * claims 1,5 *; | [A]US2005154087 (KOBAYASHI HIROSHI [JP]) [A] 1-11 * paragraphs [0014] , [0015] , [0 35] , [0039] , [0044] , [0048] , [0049] , [0000] , [0051]; figure -; example -; claims 1-7 *; | [A]US2007203262 (CROSSLEY JOHN W [US]) [A] 1-11* figure 1; claims 1,3,7 * | International search | [A]JP2003192918 (NAKAMURA KENJI, et al); | [A]WO2009044884 (NAKAMURA KENJI [JP]) | by applicant | JPH08299070 | JPH10166382 | JPH1121378 | JP2001018271 | JP2001061706 | JP2001088198 | JP2005066823 | JP2006110905 | JP2007022944 | JP2007190878 | JP2009018467 | WO2009044884 | - "Shashutsu Seikei Kako no Furyo Taisaku", Nikkan Kogyo Shimbun, (20080718), pages 10 - 11 | - Seikei Kako ni Okeru Plastic Zairyo--Plastic Seikei Kako III, SIGMA SHUPPAN, (20050225), pages 107 - 109 | - "Research Paper; Structural Evaluation of Injection Molded Products by Laser Raman Spectroscopy", KAGAKU TO KOGYO, (2007), vol. 81, no. 9, pages 433 - 438 | - "Research Paper: Structural Evaluation of Injection Molded Products by Laser Raman Spectroscopy", KAGAKU TO KOGYO, (2007), vol. 81, no. 9, pages 433 - 438 | - C. M., "Tobin reports the attribution of each peak in a Raman spectrum of PP and its relationship with crystallinity", J. PHYS. CHEM., (1960), vol. 64, page 216 | - POLYM. ENG. SCI., (1987), vol. 27, no. 12, pages 917 - 924 |