blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2224061

EP2224061 - Method for supplying base material in platform construction [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  13.09.2013
Database last updated on 15.06.2024
Most recent event   Tooltip13.09.2013Application deemed to be withdrawnpublished on 16.10.2013  [2013/42]
Applicant(s)For all designated states
Zürcher, Ralf
Binzenweg 12
77974 Meissenheim / DE
[2010/35]
Inventor(s)01 / see applicant
...
 [2010/35]
Representative(s)Goy, Wolfgang
PATENTANWALT
Zähringer Strasse 373
79108 Freiburg / DE
[N/P]
Former [2010/35]Goy, Wolfgang
Zähringer Strasse 373
79108 Freiburg / DE
Application number, filing date10001696.319.02.2010
[2010/35]
Priority number, dateDE2009101063226.02.2009         Original published format: DE102009010632
[2010/35]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report 
No.:EP2224061
Date:01.09.2010
Language:DE
[2010/35]
Type: A3 Search report 
No.:EP2224061
Date:19.09.2012
Language:DE
[2012/38]
Search report(s)(Supplementary) European search report - dispatched on:EP22.08.2012
ClassificationIPC:E01B27/00
[2010/35]
CPC:
E01B27/00 (EP)
Designated contracting statesAT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   SM,   TR [2010/35]
Extension statesALNot yet paid
BANot yet paid
RSNot yet paid
TitleGerman:Verfahren zur Zuführung von Bodenmaterialien bei Gleisbauarbeiten[2010/35]
English:Method for supplying base material in platform construction[2010/35]
French:Procédé d'approvisionnement de matériaux de sol pour travaux de voie[2010/35]
Examination procedure20.03.2013Application deemed to be withdrawn, date of legal effect  [2013/42]
02.05.2013Despatch of communication that the application is deemed to be withdrawn, reason: examination fee not paid in time  [2013/42]
Fees paidRenewal fee
25.04.2012Renewal fee patent year 03
Penalty fee
Additional fee for renewal fee
29.02.201203   M06   Fee paid on   25.04.2012
28.02.201304   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[X]EP1249535  (GSG KNAPE GLEISSANIERUNG GMBH [DE]) [X] 1-6 * column 12, paragraph 43; figures 2,5; claims 27-31 *;
 [X]EP1249537  (GSG KNAPE GLEISSANIERUNG GMBH [DE]) [X] 1-6 * figures 2,5; claims 1,6,7 *;
 [A]DE9319958U  (WIEBE HERMANN GRUNDSTUECK [DE]) [A] 1,2,6 * page 7; figures 1,2 *;
 [A]DE2713634  (PLASSER BAHNBAUMASCH FRANZ) [A] 1,3,4 * page 8; figures 1-3 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.