blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP2256827

EP2256827 - Electro-mechanical connector for solar arrays [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  16.06.2017
Database last updated on 02.09.2024
Most recent event   Tooltip06.03.2020Lapse of the patent in a contracting state
New state(s): TR
published on 08.04.2020  [2020/15]
Applicant(s)For all designated states
Bal Seal Engineering, Inc.
19650 Pauling
Foothill Ranch, CA 92610-2610 / US
[2016/32]
Former [2010/48]For all designated states
Bal Seal Engineering, Inc.
19650 Pauling
Foothill Ranch CA 92610-2610 / US
Inventor(s)01 / Poon, Daniel
19650 Pauling
Foothill Ranch California 92610-2610 / US
02 / Smith, Kyle
19650 Pauling
Foothill Ranch California 92610-2610 / US
 [2010/48]
Representative(s)Klingseisen, Franz
Klingseisen, Rings & Partner
Patentanwälte
Postfach 10 15 61
80089 München / DE
[2016/32]
Former [2010/48]Klingseisen, Franz
Klingseisen & Partner Postfach 10 15 61
80089 München / DE
Application number, filing date10005518.527.05.2010
[2010/48]
Priority number, dateUS2010078760226.05.2010         Original published format: US 787602
US2009018242329.05.2009         Original published format: US 182423
[2010/48]
Filing languageEN
Procedural languageEN
PublicationType: A2 Application without search report 
No.:EP2256827
Date:01.12.2010
Language:EN
[2010/48]
Type: A3 Search report 
No.:EP2256827
Date:10.07.2013
Language:EN
[2013/28]
Type: B1 Patent specification 
No.:EP2256827
Date:10.08.2016
Language:EN
[2016/32]
Search report(s)(Supplementary) European search report - dispatched on:EP07.06.2013
ClassificationIPC:H01L31/05, F16B3/04, F16B5/00, F24J2/52
[2013/28]
CPC:
H01L31/0508 (EP,US); F16B2200/93 (EP,US); F16B5/0635 (EP,US);
F24S25/67 (EP,US); Y02E10/50 (EP,US)
Former IPC [2010/48]H01L31/05
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   SE,   SI,   SK,   SM,   TR [2016/32]
Former [2010/48]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  SE,  SI,  SK,  SM,  TR 
TitleGerman:Elektromechanischer Steckverbinder für Solaranordnungen[2010/48]
English:Electro-mechanical connector for solar arrays[2010/48]
French:Connecteur électromécanique pour réseaux solaires[2010/48]
Examination procedure10.01.2014Amendment by applicant (claims and/or description)
10.01.2014Examination requested  [2014/09]
14.05.2014Despatch of a communication from the examining division (Time limit: M06)
21.11.2014Reply to a communication from the examining division
02.04.2015Despatch of a communication from the examining division (Time limit: M06)
28.09.2015Reply to a communication from the examining division
25.02.2016Communication of intention to grant the patent
28.06.2016Fee for grant paid
28.06.2016Fee for publishing/printing paid
28.06.2016Receipt of the translation of the claim(s)
Divisional application(s)The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued is  14.05.2014
Opposition(s)11.05.2017No opposition filed within time limit [2017/29]
Fees paidRenewal fee
29.03.2012Renewal fee patent year 03
10.05.2013Renewal fee patent year 04
27.03.2014Renewal fee patent year 05
12.05.2015Renewal fee patent year 06
10.05.2016Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU27.05.2010
AL10.08.2016
AT10.08.2016
BE10.08.2016
CY10.08.2016
CZ10.08.2016
DK10.08.2016
EE10.08.2016
ES10.08.2016
FI10.08.2016
HR10.08.2016
IT10.08.2016
LT10.08.2016
LV10.08.2016
MC10.08.2016
MK10.08.2016
NL10.08.2016
PL10.08.2016
RO10.08.2016
SE10.08.2016
SI10.08.2016
SK10.08.2016
SM10.08.2016
TR10.08.2016
BG10.11.2016
NO10.11.2016
GR11.11.2016
IS10.12.2016
PT12.12.2016
[2020/15]
Former [2019/51]HU27.05.2010
AL10.08.2016
AT10.08.2016
BE10.08.2016
CY10.08.2016
CZ10.08.2016
DK10.08.2016
EE10.08.2016
ES10.08.2016
FI10.08.2016
HR10.08.2016
IT10.08.2016
LT10.08.2016
LV10.08.2016
MC10.08.2016
MK10.08.2016
NL10.08.2016
PL10.08.2016
RO10.08.2016
SE10.08.2016
SI10.08.2016
SK10.08.2016
SM10.08.2016
BG10.11.2016
NO10.11.2016
GR11.11.2016
IS10.12.2016
PT12.12.2016
Former [2019/46]HU27.05.2010
AL10.08.2016
AT10.08.2016
BE10.08.2016
CY10.08.2016
CZ10.08.2016
DK10.08.2016
EE10.08.2016
ES10.08.2016
FI10.08.2016
HR10.08.2016
IT10.08.2016
LT10.08.2016
LV10.08.2016
MC10.08.2016
NL10.08.2016
PL10.08.2016
RO10.08.2016
SE10.08.2016
SI10.08.2016
SK10.08.2016
SM10.08.2016
BG10.11.2016
NO10.11.2016
GR11.11.2016
IS10.12.2016
PT12.12.2016
Former [2019/31]HU27.05.2010
AL10.08.2016
AT10.08.2016
BE10.08.2016
CZ10.08.2016
DK10.08.2016
EE10.08.2016
ES10.08.2016
FI10.08.2016
HR10.08.2016
IT10.08.2016
LT10.08.2016
LV10.08.2016
MC10.08.2016
NL10.08.2016
PL10.08.2016
RO10.08.2016
SE10.08.2016
SI10.08.2016
SK10.08.2016
SM10.08.2016
BG10.11.2016
NO10.11.2016
GR11.11.2016
IS10.12.2016
PT12.12.2016
Former [2018/46]AL10.08.2016
AT10.08.2016
BE10.08.2016
CZ10.08.2016
DK10.08.2016
EE10.08.2016
ES10.08.2016
FI10.08.2016
HR10.08.2016
IT10.08.2016
LT10.08.2016
LV10.08.2016
MC10.08.2016
NL10.08.2016
PL10.08.2016
RO10.08.2016
SE10.08.2016
SI10.08.2016
SK10.08.2016
SM10.08.2016
BG10.11.2016
NO10.11.2016
GR11.11.2016
IS10.12.2016
PT12.12.2016
Former [2018/06]AT10.08.2016
BE10.08.2016
CZ10.08.2016
DK10.08.2016
EE10.08.2016
ES10.08.2016
FI10.08.2016
HR10.08.2016
IT10.08.2016
LT10.08.2016
LV10.08.2016
MC10.08.2016
NL10.08.2016
PL10.08.2016
RO10.08.2016
SE10.08.2016
SI10.08.2016
SK10.08.2016
SM10.08.2016
BG10.11.2016
NO10.11.2016
GR11.11.2016
IS10.12.2016
PT12.12.2016
Former [2017/37]AT10.08.2016
BE10.08.2016
CZ10.08.2016
DK10.08.2016
EE10.08.2016
ES10.08.2016
FI10.08.2016
HR10.08.2016
IT10.08.2016
LT10.08.2016
LV10.08.2016
NL10.08.2016
PL10.08.2016
RO10.08.2016
SE10.08.2016
SI10.08.2016
SK10.08.2016
SM10.08.2016
BG10.11.2016
NO10.11.2016
GR11.11.2016
IS10.12.2016
PT12.12.2016
Former [2017/36]AT10.08.2016
BE10.08.2016
CZ10.08.2016
DK10.08.2016
EE10.08.2016
ES10.08.2016
FI10.08.2016
HR10.08.2016
IT10.08.2016
LT10.08.2016
LV10.08.2016
NL10.08.2016
PL10.08.2016
RO10.08.2016
SE10.08.2016
SK10.08.2016
SM10.08.2016
BG10.11.2016
NO10.11.2016
GR11.11.2016
IS10.12.2016
PT12.12.2016
Former [2017/32]AT10.08.2016
BE10.08.2016
CZ10.08.2016
DK10.08.2016
EE10.08.2016
ES10.08.2016
FI10.08.2016
HR10.08.2016
IT10.08.2016
LT10.08.2016
LV10.08.2016
NL10.08.2016
PL10.08.2016
RO10.08.2016
SE10.08.2016
SK10.08.2016
SM10.08.2016
BG10.11.2016
NO10.11.2016
GR11.11.2016
IS10.12.2016
PT12.12.2016
Former [2017/13]AT10.08.2016
ES10.08.2016
FI10.08.2016
HR10.08.2016
IT10.08.2016
LT10.08.2016
LV10.08.2016
NL10.08.2016
PL10.08.2016
SE10.08.2016
NO10.11.2016
GR11.11.2016
IS10.12.2016
PT12.12.2016
Former [2017/11]AT10.08.2016
ES10.08.2016
FI10.08.2016
HR10.08.2016
IT10.08.2016
LT10.08.2016
NL10.08.2016
PL10.08.2016
SE10.08.2016
NO10.11.2016
GR11.11.2016
IS10.12.2016
PT12.12.2016
Former [2017/10]FI10.08.2016
HR10.08.2016
IT10.08.2016
LT10.08.2016
NL10.08.2016
PL10.08.2016
SE10.08.2016
NO10.11.2016
IS10.12.2016
Former [2017/09]FI10.08.2016
IT10.08.2016
LT10.08.2016
NL10.08.2016
NO10.11.2016
Former [2017/07]LT10.08.2016
Documents cited:Search[XA]US3442048  (ELIAS ENRIQUE) [X] 1 * column 2, lines 11-25 *[A] 2-20
by applicantUS4296270
 US4350836
 US4685608
 US5919316
 US6093884
 US6870087
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.