EP2280296 - Retroreflective film [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 24.06.2022 Database last updated on 27.07.2024 | |
Former | The patent has been granted Status updated on 16.07.2021 | ||
Former | Grant of patent is intended Status updated on 02.03.2021 | ||
Former | Examination is in progress Status updated on 09.11.2018 | Most recent event Tooltip | 12.04.2024 | Lapse of the patent in a contracting state New state(s): CY | published on 15.05.2024 [2024/20] | Applicant(s) | For all designated states Avery Dennison Corporation 150 North Orange Grove Boulevard Pasadena, CA 91103-3596 / US | [2011/05] | Inventor(s) | 01 /
Peck, John D. 200 West Campbell, Unit 606 Arlington Heights, IL 60005 / US | 02 /
Da Silva Matos, Eduardo Fransisco Foga 225 Vinhedo, SP, Brasil / BR | [2011/05] | Representative(s) | Müller-Boré & Partner Patentanwälte PartG mbB Friedenheimer Brücke 21 80639 München / DE | [2021/33] |
Former [2011/05] | Müller-Boré & Partner Patentanwälte Grafinger Straße 2 81671 München / DE | Application number, filing date | 10011882.7 | 10.01.2006 | [2011/05] | Priority number, date | BR2005PI00848 | 10.01.2005 Original published format: BR PI0500848 | [2011/05] | Filing language | EN | Procedural language | EN | Publication | Type: | A2 Application without search report | No.: | EP2280296 | Date: | 02.02.2011 | Language: | EN | [2011/05] | Type: | A3 Search report | No.: | EP2280296 | Date: | 02.03.2011 | [2011/09] | Type: | B1 Patent specification | No.: | EP2280296 | Date: | 18.08.2021 | Language: | EN | [2021/33] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 01.02.2011 | Classification | IPC: | B32B27/00, B29D11/00, G02B5/124, B60R13/10, B29L11/00, B29L31/30, B29L31/00, B29C43/02, B29C43/20, B29K105/00 | [2021/10] | CPC: |
B60R13/10 (EP,US);
G02B5/122 (KR);
B29C43/021 (EP,US);
B29D11/00605 (EP,US);
G02B5/124 (EP,US);
B29C2043/023 (EP,US);
B29C43/203 (EP,US);
B29K2105/256 (EP,US);
B29K2995/003 (EP,US);
B29L2011/0083 (EP,US);
B29L2031/3061 (EP,US);
B29L2031/723 (EP,US);
B29L2031/7232 (EP,US)
(-)
|
Former IPC [2011/05] | G02B5/124, B60R13/10, // B32B27/00, B29D11/00 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR [2021/33] |
Former [2011/05] | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HU, IE, IS, IT, LI, LT, LU, LV, MC, NL, PL, PT, RO, SE, SI, SK, TR | Title | German: | Rückreflektierende Folie | [2011/05] | English: | Retroreflective film | [2011/05] | French: | Film rétroréfléchissant | [2011/05] | Examination procedure | 01.09.2011 | Amendment by applicant (claims and/or description) | 01.09.2011 | Examination requested [2011/42] | 06.10.2011 | Despatch of a communication from the examining division (Time limit: M06) | 23.03.2012 | Reply to a communication from the examining division | 25.02.2015 | Despatch of a communication from the examining division (Time limit: M04) | 24.06.2015 | Reply to a communication from the examining division | 30.10.2018 | Despatch of a communication from the examining division (Time limit: M04) | 13.02.2019 | Reply to a communication from the examining division | 10.09.2020 | Despatch of a communication from the examining division (Time limit: M04) | 09.12.2020 | Reply to a communication from the examining division | 03.03.2021 | Communication of intention to grant the patent | 08.07.2021 | Fee for grant paid | 08.07.2021 | Fee for publishing/printing paid | 08.07.2021 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP06717884.8 / EP1836513 | Divisional application(s) | The date of the Examining Division's first communication in respect of the earliest application for which a communication has been issued (EP20060717884) is 13.12.2007 | Opposition(s) | 19.05.2022 | No opposition filed within time limit [2022/30] | Fees paid | Renewal fee | 14.10.2010 | Renewal fee patent year 03 | 14.10.2010 | Renewal fee patent year 04 | 14.10.2010 | Renewal fee patent year 05 | 25.01.2011 | Renewal fee patent year 06 | 25.01.2012 | Renewal fee patent year 07 | 25.01.2013 | Renewal fee patent year 08 | 27.01.2014 | Renewal fee patent year 09 | 08.01.2015 | Renewal fee patent year 10 | 08.01.2016 | Renewal fee patent year 11 | 09.01.2017 | Renewal fee patent year 12 | 08.01.2018 | Renewal fee patent year 13 | 09.01.2019 | Renewal fee patent year 14 | 10.01.2020 | Renewal fee patent year 15 | 12.01.2021 | Renewal fee patent year 16 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.01.2006 | AT | 18.08.2021 | CY | 18.08.2021 | CZ | 18.08.2021 | DK | 18.08.2021 | EE | 18.08.2021 | FI | 18.08.2021 | LT | 18.08.2021 | LV | 18.08.2021 | MC | 18.08.2021 | RO | 18.08.2021 | SE | 18.08.2021 | SI | 18.08.2021 | SK | 18.08.2021 | BG | 18.11.2021 | GR | 19.11.2021 | IS | 18.12.2021 | PT | 20.12.2021 | IE | 10.01.2022 | LU | 10.01.2022 | CH | 31.01.2022 | LI | 31.01.2022 | [2024/20] |
Former [2024/18] | HU | 10.01.2006 | |
AT | 18.08.2021 | ||
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
FI | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
MC | 18.08.2021 | ||
RO | 18.08.2021 | ||
SE | 18.08.2021 | ||
SI | 18.08.2021 | ||
SK | 18.08.2021 | ||
BG | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
IE | 10.01.2022 | ||
LU | 10.01.2022 | ||
CH | 31.01.2022 | ||
LI | 31.01.2022 | ||
Former [2023/09] | AT | 18.08.2021 | |
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
FI | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
MC | 18.08.2021 | ||
RO | 18.08.2021 | ||
SE | 18.08.2021 | ||
SI | 18.08.2021 | ||
SK | 18.08.2021 | ||
BG | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
IE | 10.01.2022 | ||
LU | 10.01.2022 | ||
CH | 31.01.2022 | ||
LI | 31.01.2022 | ||
Former [2023/03] | AT | 18.08.2021 | |
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
FI | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
MC | 18.08.2021 | ||
RO | 18.08.2021 | ||
SE | 18.08.2021 | ||
SI | 18.08.2021 | ||
SK | 18.08.2021 | ||
BG | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
LU | 10.01.2022 | ||
CH | 31.01.2022 | ||
LI | 31.01.2022 | ||
Former [2022/46] | AT | 18.08.2021 | |
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
FI | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
MC | 18.08.2021 | ||
RO | 18.08.2021 | ||
SE | 18.08.2021 | ||
SI | 18.08.2021 | ||
SK | 18.08.2021 | ||
BG | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
LU | 10.01.2022 | ||
Former [2022/39] | AT | 18.08.2021 | |
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
FI | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
MC | 18.08.2021 | ||
RO | 18.08.2021 | ||
SE | 18.08.2021 | ||
SI | 18.08.2021 | ||
SK | 18.08.2021 | ||
BG | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/36] | AT | 18.08.2021 | |
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
FI | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
RO | 18.08.2021 | ||
SE | 18.08.2021 | ||
SI | 18.08.2021 | ||
SK | 18.08.2021 | ||
BG | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/24] | AT | 18.08.2021 | |
CZ | 18.08.2021 | ||
DK | 18.08.2021 | ||
EE | 18.08.2021 | ||
FI | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
RO | 18.08.2021 | ||
SE | 18.08.2021 | ||
SK | 18.08.2021 | ||
BG | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/21] | AT | 18.08.2021 | |
DK | 18.08.2021 | ||
FI | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
SE | 18.08.2021 | ||
BG | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/11] | AT | 18.08.2021 | |
FI | 18.08.2021 | ||
LT | 18.08.2021 | ||
LV | 18.08.2021 | ||
SE | 18.08.2021 | ||
BG | 18.11.2021 | ||
GR | 19.11.2021 | ||
IS | 18.12.2021 | ||
PT | 20.12.2021 | ||
Former [2022/09] | AT | 18.08.2021 | |
FI | 18.08.2021 | ||
LT | 18.08.2021 | ||
SE | 18.08.2021 | ||
BG | 18.11.2021 | ||
PT | 20.12.2021 | ||
Former [2022/08] | AT | 18.08.2021 | |
FI | 18.08.2021 | ||
LT | 18.08.2021 | ||
SE | 18.08.2021 | ||
BG | 18.11.2021 | ||
Former [2022/07] | AT | 18.08.2021 | |
LT | 18.08.2021 | Documents cited: | Search | [X]US2001048169 (NILSEN ROBERT B [US], et al) [X] 1-6 * paragraph [0088] - paragraph [0089]; figure 9 *; | [XI]US2002094417 (PHILLIPS EDWARD D [US]) [X] 1 * paragraph [0009]; figure 1 * [I] 2-6; | [XI]JP2004223726 (DAINIPPON PRINTING CO LTD) [X] 1 * paragraphs [0013] , [0044] * [I] 2-6; | [XI]US2002071183 (MULLEN PATRICK W [US], et al) [X] 1 * paragraph [0019] - paragraph [0021]; figures 1-2 * [I] 2-6 | Examination | US5310436 | WO9314422 |